0% found this document useful (0 votes)
14 views4 pages

Rab Dragon Revisi

Uploaded by

Dom Juan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views4 pages

Rab Dragon Revisi

Uploaded by

Dom Juan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project : PT Dragon Forever

Lokasi : Cakung, Jaktim, DKI Jakarta

No. Nama Barang Jumlah Harga Satuan


PLANT 1
1 PANEL CUT T & WH (Plant 1) 1 Unit 45,500,000
2 Panel Blower (Plant 1) 1 Unit 47,600,000
3 Panel Lighting AB LT.2 (Plant 1) 1 Unit 16,100,000
4 PANEL BOILER & COM (Plant 1) 1 Unit 21,700,000
5 Kabel NYY 1x4x150 300 Meter 1,500,000
Kabel NYY 1x4x25 500 Meter 268,750
Kabel NYY 1x4x16 500 Meter 175,000
6 Kabel NYY 2X4X35 500 meter 362,500
TOTAL P1
PLANT 2
1 PANEL BOILER BESAR B RKS 2 (Plant 2) 1 Unit 28,000,000
2 PANEL BOILER KECIL A RKS 2 (Plant 2) 1 Unit 16,800,000
3 PANEL C RKS 2 (Plant 2) 1 Unit 16,800,000
4 Panel Cooling System B (Plant 2) 1 Unit 39,900,000
5 Panel Cooling System A (Plant 2) 1 Unit 46,900,000
6 Maintenance Cleaning Panel MDP 2 Panel (Plant 2) 1 Lot 21,000,000
- Service Busbar
- Cleaning Panel
- Tightening Koneksi
- Testcom After Maintenance
8 Kabel NYY 1X4x50 700 meter 487,500
8 Kabel NYY 1X4x16 560 meter 175,000
8 Kabel NYY 1X4x6 350 meter 71,250
TOTAL P2
PLANT 3
1 Panel Lighting RKS 3.21 (Plant 3) 1 Unit 11,200,000
2 Panel 6 (Plant 3) 1 Unit 30,800,000
3 Maintenance Cleaning Panel MDP 1 Panel (Plant 3) 1 Lot 10,500,000
- Service Busbar
- Cleaning Panel
- Tightening Koneksi
- Testcom After Maintenance
TOTAL P3
JASA
1 Jasa Bongkar Pasang panel 11 Unit 2,200,000
2 Jasa Penarikan Kabel Baru (plant 1 & 2) 3410 Meter 220,000
3 Marking dan Interconection incoming Outgoing 11 Unit 2,800,000
4 Tescom 1 Lot 14,000,000
5 Mobilisasi 1 Lot 14,000,000
TOTAL P3
TOTAL 1,2&3
Total

45,500,000
47,600,000
16,100,000
21,700,000
450,000,000
134,375,000
87,500,000
181,250,000
984,025,000

28,000,000
16,800,000
16,800,000
39,900,000
46,900,000
21,000,000

341,250,000
98,000,000
24,937,500
633,587,500

11,200,000
30,800,000
10,500,000

52,500,000

24,200,000
750,200,000
30,800,000
14,000,000
14,000,000
833,200,000
2,503,312,500