Protection Portion
Protection Portion
PROTECTIVE RELAYING
SYSTEM REQUIREMENTS
APPENDIX-IX
PROTECTION REQUIREMENTS FOR
2
0
VENKATA REDDY
GANDHAM
PROTECTION ENGINEERING DIVISION-SOA
DATE: 02 / 10 / 2022
PROTECTION ENGINEERING DEPARTMENT
NATIONAL GRID SAUDI ARABIA
APPROVED BY
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
PROPRIETARY INFORMATION
This document contains proprietary information developed by and for exclusive use of
HATEM A. AL-AMRI
National Grid SA. It must be used for the identified purpose/application. It cannot be used or
DATE: 02/ 10/ 2022
copied for any other purposes nor released to others without prior written authorization of
THIS DOCUMENT IS NOT
TO BE USED FOR National Grid SA. National Grid SA will not be responsible for misuse and/or misapplication
CONSTRUCTION OR FOR
ORDERING MATERIALS of this document. National Grid SA also reserves the right to take any necessary actions to
UNTIL CERTIFIED AND
DATED protect its interest against unauthorized use.
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
CONTENTS
1. GENERAL
1.1 Introduction
FIRST ISSUE
DESCRIPTION
2
0
REVISIONS
3. PROTECTION MODIFICATION AT THE REMOTE ENDS
DEPARTMENT
PROTECTION ENGINEERING
CERTIFIED BY
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
1. GENERAL
This clause is applicable for Khamis South SS & KKAB SS
FIRST ISSUE
DESCRIPTION
1.1 INTRODUCTION:
This document covers the protection requirements for the installation of new 132kV U/G
cable between Khamis south SS & KKAB SS and its associated protection modifications
as a result of utilizing of existing bay of 132kV at Khamis south SS and extension of
existing 132kV bay at KKAB SS covering all primary equipment devices as described in
letter 22-103-30401001 dated September 5, 2022 (Safar 9, 1444).
The main purpose of this PR is to provide the necessary guidance for the vender helping
them to meet the essential NATIONAL GRID SA projects requirement. It is necessary to
read it with SAS appendix & communication requirements appendix of subject PTS; all
relays shall be supplied from the latest list of NATIONAL GRID SA unified list of approved
NO.
2
0
REVISIONS
relays, however recommend list of relays has to be approved by NATIONAL GRID SA
DEPARTMENT engineer before purchasing it for the subject Job.
PROTECTION ENGINEERING
Any Discrepancy in the protection related items in the PTS & Drawings must be brought
PREPARED BY to the PED notice during bid stage itself and no changes shall be applied by the Contractor
on his own without obtaining prior PED consent & approval.
VENKATA REDDY
GANDHAM
PED interpretation & decision shall be final & binding for the Project Contractor in case
DATE: 02 / 10 / 2022
of any conflict. It shall also be noted that this Protection Appendix takes precedence over
APPROVED BY
the conceptual drawings, various material/Engineering standards on Protection related
items. Therefore, the Contractor shall thoroughly read and understand this Protection
Abubakr S. Babiker
Appendix.
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
ASSOCIATED SPECIFICATIONS
All Relays supplied shall meet the latest revision of IEC publication 60255
FIRST ISSUE
DESCRIPTION
The Protection IED’s used for the purpose of accomplishing this project should be
NO.
2
0
REVISIONS
functions, included in the same Protection IED’s unit. Also, shall be integrated in the
DEPARTMENT SAS and shall be compatible with IEC 61850 connectivity/functionality facilitated
PROTECTION ENGINEERING
with PRP.
PREPARED BY It is important that the utilized Protection IED's shall be physically separate devices
from Control IED's.
VENKATA REDDY Protection IEDs shall be as per the approved Optimized Panel design from Different
GANDHAM
DATE: 02 / 10 / 2022
Manufacturers. Any deviation in the Approved Ordering code and Optimized Panel
Design Ordering Code shall be given in tabulated Form with the Bid document with
APPROVED BY
technical reasoning for the new Code. It is subject to PED Approval.
For the integration of conventional type equipment like Tripping Relays, IN/OUT
Abubakr S. Babiker
Relays, CT Supervision Relays, DC Supervision Relays,, Inter trip Send/Receive shall
DATE: 02/ 10/ 2022
be through Main Protection IEDs provided Main Protection IEDs shall have minimum
CERTIFIED BY 20% Spare points for future use.
PED-SOA DIVISION
MANGER
The Following signals shall be integrated with SAS through Common BCU (I/O Box)
HATEM A. AL-AMRI
in Station General Alarm Panel SAS Integration.
DATE: 02/ 10/ 2022
a) Main Protection IED Fail (Watch Dog Contact).
THIS DOCUMENT IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR
b) Main DC of Main Protection IED Fail.
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Both FPFM & FPSM shall be separated electrically and mechanically in terms of
protection relays, physical position in cubicle(s), DC supply, CT cores, VT windings,
breaker trip coils, and cabling. No single failure of any component shall affect both
FPFM & FPSM protection function.
The relays at each end (i.e. local and remote ends) shall be diversified i.e. relays of
FIRST ISSUE
DESCRIPTION
same functionality at the same end shall be from different manufacturers to insure
the maximum security of protection, but shall insure similarity with the relevant
remote end unit.
Each protective relay, auxiliary relay, lockout relays etc. which either initiate tripping
function (lockout) relays, and/or tripping to circuit breakers or initiate annunciation
etc. shall be provided with positive means of indicating either by flag or LED.
All protection relays shall be provided with LED indications for all protective
functions.
NO.
2
0
REVISIONS
PROTECTION ENGINEERING
All protective relays, auxiliary relays, lockout relays, tripping function relays etc. shall
PREPARED BY
be provided with adequate contacts for following functions. If necessary auxiliary
relays shall be provided to accomplish these requirements.
VENKATA REDDY
GANDHAM
PED-SOA DIVISION
MANGER
The system data (the currents, the voltages, system frequency etc.) shall be
HATEM A. AL-AMRI available in the protection IEDs and shall be stored during pre-fault and post fault
DATE: 02/ 10/ 2022 conditions for analysis purposes.
THIS DOCUMENT IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
RELAYS CONFIGURATIONS REQUIREMENT
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
For the purpose of achieving correct scheme performance the contractors are
obliged to the do the following:-
Obtain stamped relays configuration directly from the manufacturers for each
specific scheme, no configuration done by others shall be accepted
Provide the relays native files and Printed hardcopy " If Requested " Along with any
FIRST ISSUE
DESCRIPTION
2
0
REVISIONS
DEPARTMENT Obtain , on his expense, any needed temporary rent license from the IPS program
PROTECTION ENGINEERING
provider and CAPE program provider to use it for commissioning purpose.
PREPARED BY
Coordinated with the IPS program provider and CAPE program provider for adding
any newly proposed relay version to the library and bare any relevant cost. The
VENKATA REDDY
GANDHAM
contractor for such cases shall be responsible to provide the full relay code and
DATE: 02 / 10 / 2022
version number to the NG as well as to the IPS program provider and CAPE program
APPROVED BY
provider.
Abubakr S. Babiker
The contractor shall also perform the following measurements as explained below:
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Finally, based on the soil Resistivity pattern and other Geotechnical considerations
and involved standards, the T/L contractor shall provide equivalent single soil
Resistivity value for use with HV and EHV fault calculations, suggested by an
approved 'Independent Agency'.
These measurement and Equivalent Soil Resistivity values must be submitted
FIRST ISSUE
DESCRIPTION
2. IMPEDANCE MEASUREMENT
The contractor shall have line impedances measured by APPROVED agencies for all
newly constructed lines.
The measurement shall provide the following individual impedances accompanied
by various measured voltage and measured currents as well as Test circuit
diagrams for each impedance measurement (all impedances must be in rectangular
form R+jX):
NO.
2
0
REVISIONS
i. Zab
DEPARTMENT ii. Zbc
PROTECTION ENGINEERING
iii. Zca
CERTIFIED BY calc shall be evaluated using Z1 and measured Z0 as determined above from ZPh-E
PED-SOA DIVISION
MANGER
calc=(2Z1+z0)/3. The difference between ZPh-E and ZPh-E calc shall not exceed
2%. Failing which, repeated measurement shall be performed to satisfy the accuracy
HATEM A. AL-AMRI within 2%.
DATE: 02/ 10/ 2022
With parallel line open and grounded at both ends again, average value ZPh-E of
THIS DOCUMENT IS NOT
TO BE USED FOR measured Phase-Earth impedance, where ZPh-E = (ZaE+ZbE+ZcE)/3, shall be
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND checked with theoretical calculations ZPh-E calc. ZPh-E calc shall be evaluated
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
3. CALCULATED IMPEDANCES
The Contractor shall provide line impedance calculations using proper software for
all T/L lines based on physical line construction using 'Equivalent Soil Resistivity'.
These calculated impedances shall be submitted to PED and S/S contractor for
each line at the time of start of the project as well as at the time of final testing of
the lines.
2
0
REVISIONS
at end of final construction and shall include the following for each line individually:
DEPARTMENT Power conductor type, size and details of strands.
PROTECTION ENGINEERING
Bundle details (i.e. numbers of conductors per phase).
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
to GIS or CB).
High fault detection reliability shall be ensured by arranging that any system fault
condition for 132kV system is normally detected by at least two independent
protective systems. Following fault detection, trip commands shall be immediately
initiated to the appropriate circuit breaker trip coils.
NO.
2
0
REVISIONS
As far as possible, no single failure of secondary equipment shall result in an un-
DEPARTMENT cleared fault, To achieve this, , 132kV Circuit Breakers shall each have two Trip
PROTECTION ENGINEERING
Coils. To trip on fault, the 132KV CBs shall receive two discrete trip signals from two
PREPARED BY main protections such that either signal on its own will cause tripping.
The two main protections will generally be fed from separate CT’s.
Adjoining zones of protection will utilize current transformers from the “remote” side
VENKATA REDDY
GANDHAM
of the circuit breaker in order to achieve overlap. To achieve full reliability and
DATE: 02 / 10 / 2022
availability the two main protections shall be from two different approved
APPROVED BY
manufacturers and shall be in independent protection panels.
In applications where crossing tripping is eminent and cannot be avoided e.g. inter-
Abubakr S. Babiker
tripping of tripping function (lockout) relays, approval by the COMPANY shall be
DATE: 02/ 10/ 2022
requested.
CERTIFIED BY The protection scheme shall be designed such that if all protections of any one group
PED-SOA DIVISION
MANGER
are not available, the other group shall protect the primary equipment. Complete
redundancy shall be maintained including DC supply wiring, cabling and cable
HATEM A. AL-AMRI selections etc. such that non-availability of any protection, group of protections, DC
DATE: 02/ 10/ 2022
supply, cables/cabling etc. shall not be the cause that equipment is not adequately
THIS DOCUMENT IS NOT
TO BE USED FOR protected.
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Primary equipment which is not having local tripping facility , e.g. feeder transformers
without local circuit breakers which is depending on signaling equipment to provide
remote protection shall have two segregated communication facilities to achieve a
secure protection means.
During the approval of AC/DC schematic drawings any device required to complete
FIRST ISSUE
DESCRIPTION
2
0
REVISIONS
DEPARTMENT For all High Impedance Protections the Contractor shall install independent CT
PROTECTION ENGINEERING
Supervision Relays. On Detection of CT Open Circuit, it should Short and Isolate the
PREPARED BY CTs from the Protection to avoid any mal operation of the Protection. There must
be local at the Protection Panel and at Station HMI & remote at Regional-CC Alarm
in case of CT Open Circuit Detection. The CT Supervision shall have adequate time
VENKATA REDDY
GANDHAM
settable in range of 2-14 Sec with steps of 500mS.
DATE: 02 / 10 / 2022
APPROVED BY
The Built in feature of the Multifunction High Impedance Protection IED shall be
accepted provided that 87 Relay has independent elements for each phase for Fault
Abubakr S. Babiker
detection and CT open Circuit Detection. Each element shall be independently
DATE: 02/ 10/ 2022
Settable and shall have settable time Delay of 0-15 Sec in steps of one second.
CERTIFIED BY
PED-SOA DIVISION
MANGER
1.3.2 Series Stabilizing Resistors & Shunt Resistors for High Impedance Protection
HATEM A. AL-AMRI The Numerical type Relays adopted for High Impedance Function are mostly
DATE: 02/ 10/ 2022
Current Calibrated require external series stabilizing Resistors of adequate Size
THIS DOCUMENT IS NOT
TO BE USED FOR and Rating. Having setting value such that with Relay Operating Current not
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND more than 100mA the Voltage can be set in range of 50-300V.
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
2
0
REVISIONS
accommodate all S/S analogues and digital inputs, and maintain spare capacity for
DEPARTMENT any foreseen future expansions, each bay unit or Protection IED shall at least record
PROTECTION ENGINEERING
the relevant information as shown below.
PREPARED BY In case of Existing remote end substations being equipped with fault recorder units, it
is recommended to maintain consistency in the same S/S and enhance the existing
units to accommodate all needed channels, in addition to using the IED’s facilities.
VENKATA REDDY
GANDHAM
1.4.1 Analogue Channel Allocation
DATE: 02 / 10 / 2022
Abubakr S. Babiker
Transformer Current Allocation
DATE: 02/ 10/ 2022
If Low Voltage Neutral Current Summated IN Primary FSD 2.4 kA.
CERTIFIED BY If Low Voltage Neutral Current not summated IN Primary FSD 800A.
PED-SOA DIVISION
MANGER
1.4.2 Sequence of Events (SOE)
For the SOE point list, National Grid SA specifications TES-P-108.20 (Latest Rev)
HATEM A. AL-AMRI shall be followed.
DATE: 02/ 10/ 2022
1.4.3 Transient Fault Recorder (TFR)
THIS DOCUMENT IS NOT
TO BE USED FOR # 132KV DOUBLE BUSBARS # 132KV LINE FEEDER
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND 1 87-1A operated. 1 FPFM Trip
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
2
0
PROTECTION ENGINEERING
*NOTE:
PREPARED BY
TFR points list modification work shall be subjected to the approval of the concerned
division ensuring the provision of 20% spare channels.
VENKATA REDDY -Above signals are minimum required, however each activated protection of Main1&2
GANDHAM
DATE: 02 / 10 / 2022 shall be provided as per OPDS. Moreover, cable tail protection signals shall also be
APPROVED BY
covered.
DATE: 02/ 10/ 2022 The starting /or operation of any IEDs functions as shown in the above events shall
be locally and/ or remotely indicated as the case may be, any flag operation shall be
CERTIFIED BY
manual reset except where the indication is for transient operation such as voltage
PED-SOA DIVISION
MANGER drop where it resets after the improvement of voltage and it does not need to be left
in the system.
HATEM A. AL-AMRI
Protection alarms shall be taken directly from the IEDs, and to SAS operating stations
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
All alarms indications shall be as per the National Grid SA specifications 38-TMSS-
05 (Latest Rev) and TES-P-119-27 (Latest Rev). The alarm indications shall be
available at Station HMI and grouped Alarms to Remote Control Centre through
SCADA Gate Ways.
FIRST ISSUE
DESCRIPTION
All protection devices inside the substation to be linked to the substation LAN system
and the National Grid SA network cloud via a WAN link (E1 or Digital Multi-Channels)
this is to be coordinated with concerned Department.
The contractor has to do all the needed work as part of this contract in proper liaison
with the concerned National Grid SA departments.
The fiber optic communication used for protection purpose between the relays at the
two ends of the circuit shall be dedicated fibers, the requirement is detailed in the
ATTACHED FIG#1.
NO.
2
0
REVISIONS
The inter-tripping requirement between the two ends of the circuits shall utilize the
DEPARTMENT built in IED's communication facilities at the two ends, for inter-trip send and receive.
PROTECTION ENGINEERING
Redundancy shall be maintained to achieve safe and secured inter tripping.
PREPARED BY A suitable fiber optic cable supervision to be provided with local and remote
indication and in case of fiber optic cable failure, the unit protection shall be stable
up to twice the relevant circuit rating.
VENKATA REDDY
GANDHAM
DATE: 02 / 10 / 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
for all required modifications needed in order to perform the addition of these two
outgoing cables. The CT-core for the Busbar protection shall be identical to the existing
busbars CTs, all drawing requirements/modifications shall be performed by the
contractor and provided to PED for approval. The new settings for the Busbar protection
shall be performed by the contractor. The Metrosil adequacy must be performed by the
FIRST ISSUE
DESCRIPTION
3.1 General Requirement ( Applicable for Khamis South SS & KKAB SS)
2
0
REVISIONS Any electro mechanical or static relay found for the subject feeders shall be
replaced with numerical relays as per latest OPDS.
DEPARTMENT
PROTECTION ENGINEERING
Any modification within the panels and replacement of CT’s or devices shall be
part of the contract, without claiming any additional amount.
PREPARED BY
In case the remote end circuit is equipped with relays which are matching the
list of approved relays (as per latest OPDS), relays approved code numbers, void
from outstanding technical problem, the remote end relay shall be retained and
VENKATA REDDY
GANDHAM the new local end relays shall match it in line with the scheme requirement,
DATE: 02 / 10 / 2022 subject to the approval of protection engineering Div. during the bidding stage.
APPROVED BY The contractor shall insure that all the needed changes for annunciation, Bus
bar protection modifications, CBF modifications, SOE and fault recording at the
remote end are brought out in line with the ongoing National Grid SA practice to
Abubakr S. Babiker satisfy the latest standards as part of this PR.
DATE: 02/ 10/ 2022
In case of any conflict pertaining to this PR and existing substations, it shall be
brought to PED notice and PED interpretation and decision shall be final.
CERTIFIED BY
PED-SOA DIVISION
During modification work, if any equipment (relays, auxiliary etc.) is removed, it
MANGER
shall be handed over to the AMD/ store/ concerned department. The contractor
shall be responsible for connection, modification, commissioning and all related
HATEM A. AL-AMRI equipment/devices etc.
DATE: 02/ 10/ 2022
Install and/or modify the required protection, relay settings, instrumentation,
THIS DOCUMENT IS NOT
TO BE USED FOR communication, metering, SAS/SCADA and control for the new 132kV U/G
CONSTRUCTION OR FOR
ORDERING MATERIALS Cable feeder at Khamis South SS and KKAB SS.
UNTIL CERTIFIED AND
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
The contractor shall prepare the list of IP Addresses for TFR at S/S and send for
Approval to concerned Division/Department for final Approval. The IP
Addresses shall be prepared on the bases that communication shall be possible
with each FDR unit individually and independently.
The contractor shall configure and test the connectivity with subject project
FIRST ISSUE
DESCRIPTION
related DFR from master station at PED office and master station at asset
maintenance in related region and take full responsibility for successful data
retrieval remotely.
2
0
PREPARED BY In case existing relays at Khamis South substation are not meeting the latest
OPDS requirement then new FPFM and FPSM as per latest OPDS shall be
provided at 132/33KV khamis South SS.
VENKATA REDDY
GANDHAM Existing/new panels of this spare bay shall be installed/modified as per the
DATE: 02 / 10 / 2022 latest OPDS. This shall meet the all the requirements mentioned in latest OPDS.
APPROVED BY Communication for FPFM and FPSM shall be identical at both ends and shall
meet the latest communication system requirement.
New protection panels for cable protection shall be in line with the below
Abubakr S. Babiker
appendices and its related (latest) OPDS for the selected manufacturer:
DATE: 02/ 10/ 2022
Cable Protection IEDs shall be identical at both ends ( khamis South & KKAB)
HATEM A. AL-AMRI
along with its associated protection scheme.
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
bar protection modifications, CBF modifications, SOE and fault recording at the
khamis South SS end are brought out in line with the ongoing National Grid SA
practice to satisfy the latest standards as part of this PR.
In case of any conflict between this PR and existing substations, it shall be
brought to PED notice for final concurrence.
Existing CBF philosophy to be checked and validated, the same existing
philosophy to be utilized under this scope. If any modification needed, the
contractor shall be responsible for the design, submittal for approval,
modifications, connection, commissioning, and all related works/provision of
equipment/devices, etc.
NO.
2
0
REVISIONS
During modification work, if any equipment (relays, auxiliary etc.) is removed, it
DEPARTMENT shall be handed over to the AMD/ store/ concerned department. The contractor
PROTECTION ENGINEERING
shall be responsible for connection, modification, commissioning and all related
CERTIFIED BY
PED-SOA DIVISION
3.2.1.1 CT REQUIREMENTS:
MANGER
Khamis South SS
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
For Bus Bar Protection CT’s shall be identical to other bays existing bus bar CT’s
CONTRACTOR shall get the complete name plate data of the existing bus bar
CTs.
CT sizing calculations shall be submitted to PED for review and approval prior
purchasing any CT, if applicable.
The contractor should provide the excitation current curve for new and existing
FIRST ISSUE
DESCRIPTION
CTs and should draw on the same plot (bus bar protection and line protection).
Metering CT requirement shall be subjected to approval of concern division.
2
0
REVISIONS
3.2.2 KKAB SS (Extension of 01 ( one) bay)
DEPARTMENT
As existing 132kV switchgear is going to be extended by adding 132kV Bay , new
PROTECTION ENGINEERING
protection panels for U/G cable feeder shall be provided at KKAB SS.
PREPARED BY
Existing switchgear shall be extended with one (1) new 132kV breaker and two
(2) disconnect switches arranged in a single bus single breaker configuration
VENKATA REDDY as per the SOW.
GANDHAM
DATE: 02 / 10 / 2022 Communication for FPFM and FPSM shall be identical at both ends and shall
meet the latest communication system requirement.
APPROVED BY
New protection panels for cable protection shall be in line with the below
appendices and its related (latest) OPDS for the selected manufacturer:
Abubakr S. Babiker
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
bar protection modifications, CBF modifications, SOE and fault recording at the
KKAB SS end are brought out in line with the ongoing National Grid SA practice
to satisfy the latest standards as part of this PR.
In case of any conflict between this PR and existing substations, it shall be
brought to PED notice for final concurrence.
Existing CBF philosophy to be checked and validated, the same existing
philosophy to be utilized under this scope. If any modification needed, the
contractor shall be responsible for the design, submittal for approval,
modifications, connection, commissioning, and all related works/provision of
equipment/devices, etc.
NO.
2
0
REVISIONS
During modification work, if any equipment (relays, auxiliary etc.) is removed, it
DEPARTMENT shall be handed over to the AMD/ store/ concerned department. The contractor
PROTECTION ENGINEERING
shall be responsible for connection, modification, commissioning and all related
CERTIFIED BY
PED-SOA DIVISION
3.2.2.1 CT REQUIREMENTS:
MANGER
KKAB SS
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
The contractor should provide the excitation current curve for new and existing
CTs and should draw on the same plot (bus bar protection and cable protection).
Metering CT requirement shall be subjected to approval of concern division
For Bus Bar Protection CT’s shall be identical to other bays existing bus bar CT’s
CONTRACTOR shall get the complete name plate data of the existing bus bar
CTs.
FIRST ISSUE
DESCRIPTION
Contractor shall get the complete data of the existing CTs of all other bays.
The CT sizing calculations with total lines/cables measured parameters (for all
lines/cables) from breaker to breaker shall be submitted to PED for review and
approval.
Relay setting calculations and provision to PED for all existing remote ends and
main substation shall be under this contract.
2
0
required).
DEPARTMENT
PROTECTION ENGINEERING
SOE points list modification work shall be subjected to the approval of the
concerned division ensuring the provision of 20% spare channels.
PREPARED BY
3.2.4 Transient Fault Recorder - ( khamis South SS & KKAB SS):
If existing CBF protection scheme has separate relays, then same shall
CERTIFIED BY be followed or else use the built-in CBF as per OPDS.
PED-SOA DIVISION
MANGER The existing Bus bar differential scheme shall be checked and shall
confirm it satisfies the additional new cable bay, and any required modification
HATEM A. AL-AMRI
will be a part of this contract.
DATE: 02/ 10/ 2022
The contractor shall be responsible for connection, modification,
THIS DOCUMENT IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR commissioning and all related equipment/devices etc., the contractor should
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
follow the existing bus bar and breaker failure scheme.
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
3.2.6 Annunciator and SCADA Panels - ( khamis South SS & KKAB SS):
2
0
PREPARED BY
4. RELAY PANELS REQUIREMENT
The Main 1 with its auxiliary devices and Main 2 with its auxiliary devices shall
VENKATA REDDY
GANDHAM
be located on two independent Protection relay Panels, placed adjacent to each
DATE: 02 / 10 / 2022 other.
APPROVED BY
The No. of panels indicated in the PTS or in the bid submitted by the Contractor
shall be conceptual only. The actual number might change based on detailed
design schemes & space requirements as decided by the Company.
Abubakr S. Babiker
DATE: 02/ 10/ 2022 Bidders shall fill their response for each proposed manufacturer against
“Protection requirement General confirmation” and “Summary of proposed
CERTIFIED BY
protection relays” available in Annexure-D part of this Protection requirement.
PED-SOA DIVISION
MANGER
The panel’s list shall be as per the description in different sections (Appendices)
of this document. The Bidder shall not propose his own list.
HATEM A. AL-AMRI
The relay panel requirement shall be as shown in the table below for all devices
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
All types of bus wiring shall be arranged in complete rings in order to facilitate
the removal of panels for any bay.
Clear segregation of the terminal wiring for each primary circuit must be
provided to avoid an error.
The Contractor shall install complete test blocks as per the National Grid SA
FIRST ISSUE
DESCRIPTION
standard.
Sequence of Events Recorder (SOE) functions where ever applicable ( Built in
feature of Substation Automation System) Hence no additional Panels shall be
required.
2
0
PROTECTION ENGINEERING
PROTECTION OF Existing Bus Bar Protection shall be
132KV DOUBLE modified to accommodate the
BUSBAR, additional one 132kv bay as per Existing Bus Bar
PREPARED BY
scope. Any materials needed during Protection panels
this modification including IED, shall be utilized
auxiliary relays, design, wiring, for the addition of
VENKATA REDDY
GANDHAM
commissioning … etc., shall be one new 132KV
DATE: 02 / 10 / 2022
under contractor responsibility. (At bay
khamis South & KKAB substation)
APPROVED BY
DATE: 02/ 10/ 2022 The auxiliary supply in the relays panels for each type of protection, tripping
circuit and alarm shall be derived directly from the main DC distribution
CERTIFIED BY
board independently for each bay panel. Internal looping of such supplies
PED-SOA DIVISION
MANGER
shall not be acceptable in the protection panels and each MCB shall be
equipped with an alarm contact covering both automatic and manual
HATEM A. AL-AMRI
operation.
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
2
0
REVISIONS
shall be Ring Type.
DEPARTMENT Each VT circuit shall be equipped with isolating link, covered in a labeled
PROTECTION ENGINEERING
plastic cover.
CERTIFIED BY Main 1 and Main 2 Protection shall be facilitated with local & remote IN/OUT
PED-SOA DIVISION
MANGER
selection Facility. The IN/OUT Selection facility shall initiate local & remote
indication. A white lamp shall be provided for each protection on the relay
HATEM A. AL-AMRI panel when a protection is out of service. All the out puts from the protection
DATE: 02/ 10/ 2022
shall be routed through IN/OUT switch.
THIS DOCUMENT IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
4.3 Miscellaneous
Measuring transducers for SCADA if needed shall be located on SCADA
panel.
CT shorting and CT/VT isolation facilities also shall be provided in SCADA
panels.
FIRST ISSUE
DESCRIPTION
2
0
REVISIONS
spurious signals reaching the relay. It is preferred for SAS substations that
DEPARTMENT Manual Check Synchronizing shall be built in function of BCU.
PROTECTION ENGINEERING
The MCB protecting the auxiliary transformer LV cables shall be inside the
the Contractor shall install one I/O Box in LCC to meet the requirements.
APPROVED BY
The Following Alarms to SAS shall be integrated with SAS through I/O Box in
the Station General Alarm Integration panels.
Abubakr S. Babiker
1- Main BCU Fail.
DATE: 02/ 10/ 2022
2- Main DC Supply to BCU Fail.
CERTIFIED BY The Panel Wiring shall satisfy the specification number 01-TMSS-01(Latest
PED-SOA DIVISION
MANGER
Rev).
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Minimum drawing submittal shall be as, but not limited to, the following:
Each submittal shall be both in hard and software. The submitted drawings
shall maintain the following requirement:-
Drawing index shall be available at the beginning of each set of drawing
describing the subject of each sheet or group of sheets and its issue number.
A full detailed legend describing the equipment type and how to read the
drawings shall be given.
Each sheet of drawing shall be marked as "For Approval", "Approved" and "Final
NO.
2
0
REVISIONS
As-built", as the case may be.
DEPARTMENT Drawings shall be submitted in A3 size in a proper binder with no sheets folded.
PROTECTION ENGINEERING
The feeder/bay name/number shall be available on each sheet with the
Each sheet shall be titled as per the function, such as "Tripping Relay-1, DC
APPROVED BY
Distribution, etc."
At the beginning of each set of drawing an equipment list shall be added and
Abubakr S. Babiker
this shall furnish full information about each device in respect of type, rating,
DATE: 02/ 10/ 2022
make, the number of NO & NC contacts, the Sheet #, grid location on the sheet
CERTIFIED BY containing the device (Country of Origin) and ordering information, etc.
PED-SOA DIVISION
MANGER
Inter-reference for contacts are to follow contacts location and not the coil
location.
HATEM A. AL-AMRI The single line diagram shall show the layout, rating, standard device number,
DATE: 02/ 10/ 2022
the number of phases and the relative location of each equipment as
THIS DOCUMENT IS NOT
TO BE USED FOR appropriate, while the detailed logic diagram and the schematic diagram for
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND each bay shall show the internal detailed connection and wiring (or referred to
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
The Contacts associated with Tripping Relay, Auxiliary Relay etc. shall be
shown on the Same Sheet with operating Coil of the Relay, the adopted
contacts shall be marked with the reference and functionality and the unused
contacts shall be marked as spare and terminated to spare terminal blocks. A
provision of 20% spare contacts ( not less than 2) for NATIONAL GRID SA
future/emergency Use to be provided.
For each relay and device the detailed catalogues covering working principle, pre
NO.
2
0
REVISIONS
commissioning tests, operation and maintenance, setting procedures shall be
DEPARTMENT provided in original documents and not photo copies in addition to Soft Copy on
PROTECTION ENGINEERING
CD/DVD.
with PED engineers then the Contractor is responsible to install the required Software
APPROVED BY
Programs in PED Division offices computers through Technical expertise.
The Soft copy of the settings, Configurations with native files programs for Complete
Abubakr S. Babiker
substation shall be supplied on external Hard Disc having the adequate Capacity. All
DATE: 02/ 10/ 2022
Setting Programs shall be Loaded in the HDD as Back up for PED-Division Use.
CERTIFIED BY Backup Software programs original with 10 years licensing for setting Softare
PED-SOA DIVISION
MANGER
Programs Setting calculations Programs (MathCAD/other) , uploading/down loading
altering shall be arranged at substation level with Engineering work station and at
HATEM A. AL-AMRI PED-Division office and Protection Maintenance Division Office.
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
7. APPENDICES
ATTACHED APPENDICES SHALL BE CONSIDERED A PART OF PROTECTION
REQUIRMENTS FOR THIS PTS.
**** MISCELLANEOUS. ****
Important Note:-
FIRST ISSUE
DESCRIPTION
- In case of any conflict between the issued PR for this project which has been
incorporated in the Projects PTS under Appendix IX and any other requirements
under the project SOW, the Bidders shall raise the points of discrepancy during pre-
bid clarifications stage to Protection Engineering Division who has initiated the PR
to decide the appropriate requirement for them.
- For all protection aspects the PR Appendix IX has precedence over all other
documents of the PTS. In case of not raising the points of discrepancy from the
Bidders, the PED reserves to right to decide as appropriate during project submittals
approval stage. Any additional equipment required or any scheme modification
NO.
2
0
needed to satisfy the PR Appendix IX and the technical requirements shall be the
REVISIONS
Contractors responsibility. The PED decision shall be the final and the Contractor is
DEPARTMENT
bound to implement it without claiming any additional Cost or time.
PROTECTION ENGINEERING
- Bidders shall fill their response for each proposed manufacturer against “Protection
PREPARED BY requirement General confirmation” and “Summary of proposed protection relays”
available in Annexure-D part of this Protection requirement.
VENKATA REDDY
GANDHAM
DATE: 02 / 10 / 2022
APPROVED BY
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
2
0
REVISIONS
DEPARTMENT
PROTECTION ENGINEERING
PREPARED BY
VENKATA REDDY
GANDHAM
DATE: 02 / 10 / 2022
APPROVED BY
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
ANNEXURE-D
TECHNICAL PROPOSAL
Khamis South SS & KKAB 132/33 kV substation at
Substation Name:
Asir Area
Tender No:
Bidder’s Name:
FIRST ISSUE
DESCRIPTION
Manufacturer Name:
2
0
CERTIFIED BY 1.6
PED-SOA DIVISION 1.7
MANGER
1.8
1.9
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Bidder/ Bidder/
Concl
Manufact NG Manufact NG
Ite usion/
Description urer Comme urer Comme
m Remar
Response nts (1) Response nts (2)
ks
(1) (2)
The circuit diagrams &
method of drawing shall be
FIRST ISSUE
DESCRIPTION
2
0
REVISIONS
if the conventional
annunciation equipment to
DEPARTMENT be provided for common
3
PROTECTION ENGINEERING
equipment it shall be
compatible to the IEC61850
PREPARED BY
for future use. In existing
S/S’s for the sake of
VENKATA REDDY
similarity annunciators to be
GANDHAM provided for the new
DATE: 02 / 10 / 2022
additions.
Bidder/Manufacturer to
APPROVED BY
confirm the same.
No loose equipment to be
Abubakr S. Babiker provided in the offer, all
DATE: 02/ 10/ 2022 materials shall be provided,
4 installed and set by the
CERTIFIED BY
Bidders.
PED-SOA DIVISION
Bidder/Manufacturer to
MANGER
confirm the same.
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Bidder/ Bidder/
Concl
Manufact NG Manufact NG
Ite usion/
Description urer Comme urer Comme
m Remar
Response nts (1) Response nts (2)
ks
(1) (2)
Setting calculations, CT &
PT calculations & interface
FIRST ISSUE
DESCRIPTION
2
0
6
REVISIONS
of the subcontractors to be
filtered and submitted by the
DEPARTMENT Bidder. Bidder to confirm the
PROTECTION ENGINEERING
same.
Original Manufacturer relays
PREPARED BY
manuals shall be provided in
soft copies and they shall be
VENKATA REDDY
7 compatible to relay
GANDHAM versions.
DATE: 02 / 10 / 2022
Bidder/Manufacturer to
APPROVED BY
confirm the same.
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Bidder/ Bidder/
Concl
Manufact NG Manufact NG
Ite usion/
Description urer Comme urer Comme
m Remar
Response nts (1) Response nts (2)
ks
(1) (2)
All equipment and devices
shall conform to Protection
FIRST ISSUE
DESCRIPTION
2
0
REVISIONS
has to list all the main relays
proposed for used in this
DEPARTMENT project as given below in
PROTECTION ENGINEERING
Relay Schedule.
Bidder/Manufacturer to
PREPARED BY
confirm the same.
NO exclusions from the
VENKATA REDDY
requirement is acceptable,
GANDHAM subcontractors to agree
DATE: 02 / 10 / 2022
their terms with the main
9
contractor without involving
APPROVED BY
NATIONAL GRID SA.
Bidder/Manufacturer to
Abubakr S. Babiker confirm the same.
DATE: 02/ 10/ 2022 All auxiliary transformers
shall be equipped with the
CERTIFIED BY
rated MCB inside the
PED-SOA DIVISION
transformer LV terminal box
MANGER
capable of taking the
10
transformer full load and
HATEM A. AL-AMRI suitable for protecting the
DATE: 02/ 10/ 2022 outgoing LV feeder.
THIS DOCUMENT IS NOT Bidder/Manufacturer to
TO BE USED FOR
CONSTRUCTION OR FOR confirm the same.
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Bidder/ Bidder/
Concl
Manufact NG Manufact NG
Ite usion/
Description urer Comme urer Comme
m Remar
Response nts (1) Response nts (2)
ks
(1) (2)
The offer for each
substation shall be
FIRST ISSUE
DESCRIPTION
separated in a separate
folder, mixed offers can lead
11
to confusion for which the
bidder is solely responsible.
Bidder/Manufacturer to
confirm the same.
Bulk metering, SCADA
devices and equipment
design specification shall be
12 approved from the
concerned departments.
Bidder/Manufacturer to
NO.
2
0
REVISIONS
confirm the same.
Fault recording facilities
DEPARTMENT
shall be included in the
PROTECTION ENGINEERING
relevant protection IEDs., In
existing S/S, for the sake of
PREPARED BY
13 similarity fault recorders to
be provided for the new
VENKATA REDDY
additions.
GANDHAM Bidder/Manufacturer to
DATE: 02 / 10 / 2022
confirm the same.
APPROVED BY
Please note that NG-SA has
the right to reject and accept
any relay at any stage of the
Abubakr S. Babiker project if the relay is found
DATE: 02/ 10/ 2022 14 not per SOW/TS or is not
suitable due to application
CERTIFIED BY
discrepancy.
PED-SOA DIVISION Bidder/Manufacturer to
MANGER
confirm the same.
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Bidder/ Bidder/
Concl
Manufact NG Manufact NG
Ite usion/
Description urer Comme urer Comme
m Remar
Response nts (1) Response nts (2)
ks
(1) (2)
Relays approval is only for
relay types. The
FIRST ISSUE
DESCRIPTION
number/quantity of relays,
setting range, etc. and how
15 and where these are to be
installed shall be decided
during detail design stage.
Bidder/Manufacturer to
confirm the same.
Initial relays acceptance for
main and auxiliary relays is
only tentative. Final approval
16 is based on detail design
requirements.
NO.
2
0
REVISIONS
Bidder/Manufacturer to
confirm the same.
DEPARTMENT
Contractor has to supply all
PROTECTION ENGINEERING
materials found missed at
17 this stage.
PREPARED BY
Bidder/Manufacturer to
confirm the same.
VENKATA REDDY
Each bidder shall be advised
GANDHAM
to restrict his proposal to
DATE: 02 / 10 / 2022
only two
18
APPROVED BY
vendors/Manufactures.
Bidder/Manufacturer to
confirm the same.
Abubakr S. Babiker If any bidder has further
DATE: 02/ 10/ 2022 comments or clarifications
19 shall add below.
CERTIFIED BY
Bidder/Manufacturer to
PED-SOA DIVISION confirm the same.
MANGER
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
BIDDER FORM
All Bid Proposals Shall Be Submitted In This Form (SAMPLE FORM)
BIDDER (Name)
OFFER (Name)
SUBSTATION (Name)
FIRST ISSUE
DESCRIPTION
Bidder PED
Bidder Remark
Relay function Propos acceptanc
response s
al e
1 132 KV UG CABLE PROTECTION
87L-1/21/67/67N/79/98/50BF
87L-2/21/67/67N/79/98/50BF
2 132 KV BUSBAR PROTECTION
87B
NO.
2
0
DEPARTMENT
95B
PROTECTION ENGINEERING 95B shorting aux. relay
PREPARED BY
Tripping Relay Supervision (74/TR)
Trip Coil Supervision (74/TC)
DC Supply Supervision (74/DC)
VENKATA REDDY
GANDHAM
4 MULTIPLICATION AUXILIARY RELAYS
DATE: 02 / 10 / 2022
General purpose relay
APPROVED BY
Transformer mechanical trip relay
Transformer mechanical alarm relay
Abubakr S. Babiker
5 LOR, TRIPPING RELAYS
DATE: 02/ 10/ 2022
94-1 and 94-2
CERTIFIED BY 86-1 and 86-2
PED-SOA DIVISION
MANGER 85-DTTR
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
“All bidder shall confirm and fill this for its entire proposed manufacturers”
FIRST ISSUE
DESCRIPTION
Bidder’s
Stamp
Name of Bidder:
Signature:
Name:
Date:
NO.
2
0
REVISIONS
DEPARTMENT
PROTECTION ENGINEERING
PREPARED BY
VENKATA REDDY
GANDHAM
DATE: 02 / 10 / 2022
APPROVED BY
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
2
0
REVISIONS
DEPARTMENT 7. APPENDICES
PROTECTION ENGINEERING
PREPARED BY
VENKATA REDDY
GANDHAM
DATE: 02 / 10 / 2022
APPROVED BY
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
APPENDIX # H-01
1. INTRODUCTION
3. TRIPPING CIRCUITS
4. CURRENT TRANSFORMERS
NO.
2
0
REVISIONS
5. VOLTAGE TRANSFORMERS
DEPARTMENT
PROTECTION ENGINEERING
PREPARED BY
VENKATA REDDY
GANDHAM
DATE: 02 / 10 / 2022
APPROVED BY
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
HATEM A. AL-AMRI
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
1. INTRODUCTION
This document details the basic protection requirement for 132kV U/G feeder protection.
Two numerical protection IED boxes must be from different manufacture shall be used
with multiple protection functions, included in the same protection IED’s unit.
FIRST ISSUE
DESCRIPTION
Each box supporting at least the below listed functions in item 2.1.
The usage of these functions shall depend on the circuit configuration as shall be
detailed in the relevant substation protection requirement (appendix ix), in the PTs and
the project sow.
It is necessary to read this in conjunction with the various specifications listed in page 1
of the relevant PR.
This appendix provides the necessary guide line for the vender helping them to meet the
exact NATIONAL GRID SA projects requirement
NO.
2
0
REVISIONS
DEPARTMENT
2.1 FIRST MAIN & SECOND MAIN PROTECTION IED’S FUNCTIONS BOX#1 & BOX#2 AS
PROTECTION ENGINEERING FOLLOWS:
Line differential protection
PREPARED BY
Distance protection
Directional earth fault protection
VENKATA REDDY Multi Characteristic, Stepped; Phase & Earth fault over current protection
GANDHAM
Instantaneous over current & Earth Fault protection
DATE: 02 / 10 / 2022
Sensitive directional earth fault Protection
APPROVED BY
Circuit breaker fail Protection
Under voltage /Over voltage protection
Fuse failure supervision
Abubakr S. Babiker Trip circuit supervision
DATE: 02/ 10/ 2022 Frequency Protection
Metering–for checking the live or dead condition of the line
CERTIFIED BY
PED-SOA DIVISION 2.2 FIRST MAIN & SECOND MAIN PROTECTIONS SCHEME
MANGER
Both the first & second main protections shall be utilizing current differential
HATEM A. AL-AMRI protection, and Phase Selectable Distance Protection .The current differential
DATE: 02/ 10/ 2022 shall use two dedicated fiber optic cores 1 port direct FO and another port
THIS DOCUMENT IS NOT
TO BE USED FOR
through 37.94. Standard (Refer to Fig.1) showing the communication
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
arrangement), while the Phase Selectable Distance Protection, shall have
DATED
Selectable Characteristic, the minimum number of the characteristics to be
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
given should be two, i.e. QUADRILATERL &, MHO characteristic. Both the IED’s
should be suitable for operation on a system with an X/R ratio of ≥30
An additional duplex channels for current differential & distance shall be needed
to achieve the communication redundancy through the Mux. For each box , the
speed of transferring the analogue quantities between the two feeder ends
FIRST ISSUE
DESCRIPTION
under all conditions shall be well within the safe margin of identifying the
genuine quantity without distortion or excessive time delay. GPS or other
acceptable manufacturer recommended methods to be used to insure proper
time coordination, the provided channels shall be continuously supervised, and
failure of the channel should not result in false IED operation.
The stepped over current protections shall provide the backup for the IED
operation
Operation of the current differential protection, fast distance protection or the
instantaneous over current protection of the first main protection (BOX 1) ,shall
trip coil 1 of the local breaker through a lockout relay, initiate the circuit breaker
NO.
2
0
REVISIONS
fail of the same IED and initiate the inter-trip send to the remote end through the
DEPARTMENT IED communication card which is to be used for remote tripping at the remote
PROTECTION ENGINEERING
end.
PREPARED BY Inter trip receive relay shall be used at the remote end each IED shall have its
separate receive relay to achieve full protection segregation. a resetting timer to
be used for resetting the receive relay in case of remote CBF condition
VENKATA REDDY
GANDHAM
Operation of first main protection (BOX#1) shall also trip coil 1 of the local
DATE: 02 / 10 / 2022
breaker, initiate the circuit breaker fail and send an inter trip to the remote end
APPROVED BY
through the same IED.
At the remote end a lockout inter trip receive relay to be used to receive the
Abubakr S. Babiker
tripping command, trip the remote breaker.
DATE: 02/ 10/ 2022
This remote end inter trip receive relay to be facilitated with a resetting timer to
CERTIFIED BY be used for resetting the receive relay in case of remote CBF condition
PED-SOA DIVISION
MANGER
In cases where the location of the CT's are on the line side of the breaker, faults
between the line CT's and bus bar (i.e. line end faults) shall be cleared from the
HATEM A. AL-AMRI bus bar side only but shall continue to be fed from remote end, to achieve fast
DATE: 02/ 10/ 2022
clearance for these faults, following action is needed as per the system
THIS DOCUMENT IS NOT
TO BE USED FOR configuration:-
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
fault after signaling time. Local and remote tripping shall obviously be
treated as the case of CBF tripping in all respect.
SYSTEM FED FROM INTERCONNECTED BSP'S:-
For interconnected systems the selector link between the 86B and the
86RTR relays shall be permanently kept in the open position the bus bar
protection trip relay shall initiate the CBF protections based on under
current non directional current functions in the two line protection boxes,
, on operation, the line CBF shall trip the 86RTR which in turn shall send a
remote trip , block close line breaker, and initiate local and remote
annunciation "line end fault". For " line end fault" annunciation. it shall be
NO.
2
0
REVISIONS
necessary to use the breaker NC contact in series with CBF initiating
DEPARTMENT contact to elevate any confusion between CBF condition and line end
PROTECTION ENGINEERING
faults hence assist in fault finding. local and remote tripping shall
PREPARED BY obviously be treated as the case of CBF tripping in all respect. In case of
signaling failure the fault shall be cleared by the zone 2 time delay as
there is no other option
VENKATA REDDY
GANDHAM
DATE: 02 / 10 / 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
The Distance protection included in the IED’s shall be five zones of protection suitable
for two or three terminal lines with or without tapped off lines /or transformers; each
zone shall be adjustable for Forward or reverse looking zone.
FIRST ISSUE
DESCRIPTION
For the purpose of this scheme the zones shall be as given below
Zone 1 - Forward looking quadrilateral Characteristic
Zone 2 - Forward looking quadrilateral Characteristic
Zone 3- Forward looking quadrilateral Characteristic
Zones 4&5 - Forward looking quadrilateral Characteristic for initiating
SWOTF or used for cable tail protection or as the required by the
concerned protection engineer .
Tripping Time for all zones shall be settable including zone -1; the relay measuring time
shall not exceed one cycle.
NO.
2
0
REVISIONS
DEPARTMENT The distance protection scheme should include but not limited to the following
PROTECTION ENGINEERING
additional functions such as:
CERTIFIED BY Out of step tripping function for facilitating islanding incase of requirement.
PED-SOA DIVISION
MANGER
Provision for setting the mutual compensation when applied on parallel lines is to
be made available.
HATEM A. AL-AMRI At least three setting groups shall be available for Distance function and shall be
DATE: 02/ 10/ 2022
suitable for activation by external binary.
THIS DOCUMENT IS NOT
TO BE USED FOR The relay to be supplemented with positive sequence memory voltage for use in
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND case of close up three- phase faults and shall be active for more than 100ms.
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
This appendix supports the use of permissive overreaching scheme, (however it should
be possible to choose any acceleration scheme or other scheme as the case may be)
with the following requirements:
Permissive over reach scheme shall be implemented with the permissive signal
FIRST ISSUE
DESCRIPTION
initiated from the forward looking over reaching zones (zone2/others), also the
carrier send signal (CS) might be issued in parallel both from an overreaching zone
and an under reaching, independent tripping zone.
The carrier send signal from the overreaching zone must not be prolonged while the
carrier send signal from zone 1 can be prolonged. The receipt of the permissive
signal shall permit the Zone 2 instantaneous tripping.
Carrier guard logic with unblocking scheme to be used the carrier guard signal CRG,
must always be present, even when no CR signal is received. The absence of the
CRG signal for a time longer than the setting (time Security) time is used as a CR
signal, This shall enables a permissive scheme to operate when the line fault blocks
NO.
2
0
REVISIONS
the signal transmission or a coincidence of signal loss and the fault time occurs
DEPARTMENT .The carrier received signal created by the unblocking function is reset (150 ms after
PROTECTION ENGINEERING
the security timer has elapsed. When that occurs an output signal is activated for
PREPARED BY signaling purpose. The unblocking function is reset 200 ms after that the guard
signal is present again.
VENKATA REDDY
GANDHAM
Switch on to fault Feature:
DATE: 02 / 10 / 2022
The scheme must cater for the possibility of three phase “solid” fault occurring at
APPROVED BY
the relay location, due to possibility of maintenance earth switch left on the line,
such cases to be cleared by the “Switch on to fault” feature (SOTF), It is to be
Abubakr S. Babiker
noted that only external triggering of this SOTF is acceptable either through the
DATE: 02/ 10/ 2022
closing switch or breaker auxiliary contact in addition to any starting signal.
CERTIFIED BY
PED-SOA DIVISION
MANGER
Scheme Signaling
A means of signaling between the two U/G feeders ends shall be inbuilt in the
HATEM A. AL-AMRI IED’s. dedicated channels (other than the channels allocated for current
DATE: 02/ 10/ 2022
differential protection).shall be needed to achieve this purpose, for each IED
THIS DOCUMENT IS NOT
TO BE USED FOR arranged as follows:-
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
Channel # 1 for Transfer trip The transfer trip shall be initiated by the operation of
the 1st main & 2nd main of the local end protection, this transfer trip will be used to
trip and initiate of the remote end CBF.
Channel # 2 a duplex channel for use with the current differential protection
FIRST ISSUE
DESCRIPTION
Channel # 3 for sending the permissive signal from the forward looking zones of
distance or DEF to permit the operation of relevant remote end device in case of
external faults.
communication failure shall block the operation of the unit protection, the DEF
1
2
0
REVISIONS
protection, while the distance of the concerned IED to be converted into straight
DEPARTMENT distance, it’s operating shall depend on zone2 time delay.
PROTECTION ENGINEERING
VENKATA REDDY
CIRCUIT BREAKER FAIL PROTECTION (CBF)
GANDHAM
DATE: 02 / 10 / 2022
Khamis South SS and KKAB SS are existing substations, hence CBF philosophy shall
APPROVED BY
be followed as per existing. If separete relays are provided for CBF fuction for other
existing bays, the same shall be followed for this bay also.
Abubakr S. Babiker
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
3. TRIPPING CIRCUITS :
All function of the First main protections (BOX-1), when operates shall trip coil #1.
All function of the second main protections (BOX-2) when operates shall trip coil #2.
Both IED’s shall be provided with trip circuit supervision such that the monitoring of
the trip circuits is available whether the breaker is open or closed and whether the
FIRST ISSUE
DESCRIPTION
trip
signal is present or not, the trip circuit supervision feature to be built in the IED’s.
Trip circuit failure should be locally and remotely alarmed.
Trip circuit breaker failure 86CBF should be save TC 1 & TC 2 of CB.
Two lockout relays to be used for the tripping functions.
Trip relays for bus bar protection shall be covered under the relevant specification.
2
0
REVISIONS
A two way persistent inter-tripping shall be provided between the two circuits ends.
Both main and backup protections shall inter-trip. as explained above.
DEPARTMENT
PROTECTION ENGINEERING Operation of the 1st main Delayed protection, 2nd main Delayed protection, the
backup protection the cable tail end protection, or the (CBF) shall send an inter trip
PREPARED BY
through the dedicated fiber as well as through the multiplexer , this transfer trip shall
be used to trip and block the auto re-close of the remote end
VENKATA REDDY
GANDHAM The sending and receiving of the inter tripping signaling shall be through the IED’s
DATE: 02 / 10 / 2022
communication cards of main relays, both cards shall be initiated for this purpose
APPROVED BY to insure the highest security in addition to the multiplexed system as shown in the
communication diagram Fig.1.
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER Sr. No. CURRENT TRANSFORMER DETAILS TYPE OF PROTECTION
HATEM A. AL-AMRI
1. 1600-1200-1000-800/1A Cl. PX, Rct ≤ 2 Main one Protection.
DATE: 02/ 10/ 2022
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
2
0
REVISIONS
5. VOLTAGE TRANSFORMER
DEPARTMENT
The voltage supply shall be provided by three phase -three winding – (star- Star ) VT’s
PROTECTION ENGINEERING with isolation facilities and also to the following specifications .
Rated Primary Voltage 132/√3 KV .
PREPARED BY
Rated secondary winding #1 -Voltage 115 /√3 Volts; Accuracy class 0.2+3P; Rated
VENKATA REDDY
GANDHAM
Output 100VA.
DATE: 02 / 10 / 2022
APPROVED BY
Rated secondary winding #2 - Voltage 115 /√3 Volts; Accuracy class 0.2+3P; Rated
output 100VA.
Abubakr S. Babiker
CERTIFIED BY
PED-SOA DIVISION
MANGER
DRAWING CONTROL SHEET PR FOR NEW U/G CABLE BETWEEN KHAMIS PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.