0% found this document useful (0 votes)
14 views7 pages

Inspection Request Form: Surface Preparation and Epoxy Coating

Uploaded by

refoel.revan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views7 pages

Inspection Request Form: Surface Preparation and Epoxy Coating

Uploaded by

refoel.revan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

INSPECTION REQUEST FORM

Contractor : Nael Construction and Contracting LLC


Consultant : KHATIB & ALAMI

Project Title : Sewerage & Stormwater Drainage System for Nad Al Shiba 3rd IR Ref. No. : DS-196/2-P4-HC-9220

Project No. : DS-196/2 Date : 24-Jun-24


B.O.Q Items : d/4/3B Discipline : Civil

Description of Work : Surface Preparation and Epoxy coating.


Area 1 ( CH-V-NB-18/8-1 Type B, CH-V-NB-18/8-2 Type B, CH-V-NB-18/3/2-3 Type B, CH-V-NB-18/3/3-1 Type B)

Work Location (drawing attached) : Yes Sector : N/A Road, Building etc., N/A

Work to be Inspected :

Work Ready for Inspection at : (Time) : (Date)

Inspection Requested By : Request Received By :


(for CONTRACTOR) (for CONSULTANT)

Date : 24-Jun-24 Time : 11:25:00 AM Date : Time :

SKETCH / NOTES / MEASUREMENTS :

Sketches,Sattached
INSPECTION REPORT :
Inspection of Work Completed : (Time) (Date)
Permission to Proceed with the work : Approved

Approved Subject To (See Comments)


Not Approved (See Comments)

Others (PLS. Specify) (See Comments)


Land Surveyor Comments :

Inspector Comments :

Material Inspector Comments :

Surveyor (Name) : Signature : Date :


Inspector (Name) : Signature : Date :
A. R. E (Name) : Signature : Date :
R. E (Name) : Signature : Date :

Received by Contractor :
Contractor's
: Signature : Date :
Representative