0% found this document useful (0 votes)
87 views

Tuhgt 577!?,!!

Uploaded by

Sachin Chopra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views

Tuhgt 577!?,!!

Uploaded by

Sachin Chopra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

NAMALA SURENDER

Tel: +974 66 753 755


[email protected]

EDUCATIONAL QUALIFICATIONS:
 1989-1993: B.Tech in CIVIL ENGINEERING, First Class with Distinction from Jawaharlal Nehru
Technological University College of Engineering (JNTUCE), Hyderabad, India.
 2012-2013: eMBA in Project Management
 Qatar Govt Certification: Certified Engineer by the Ministry Of Municipality & Urban Planning-(Qatar)
 Codes, Standards & specs: Fully Familiar with BS, European/American Standards, Specifications of ADNOC /
ADCO / ADGAS / NPCC / GASCO/Qatar Energy / Dolphin Energy/ Saudi Aramco &
Qatar Construction specifications.
 Training & Certifications: QP-Offshore e-PTW, HUET/T-Bossiet, & Onshore PTW (RLIC-CPW), H2S-BA, Safety
Induction with RasGas, QatarGas, Dolphin Energy, ADGAS, ADCO.
 Date of Birth: 02-June-1970, Indian Nationality.
COMPUTER SKILLS
 MS-Project/Primavera, MS Office packages.
WORK EXPERIENCE:
 Total work experience: 31 years 1 month, out of which
 Work experience in Qatar: 17 years 1 month.
 Work experience in UAE: 12 years 3 months.
 Work experience in India: 1 year 9 months.

AREAS OF EXPERTISE: Project Management/ Construction Management:

Experienced in the Design & Build (EPIC) projects, right through the design phases of Pre-FEED, FEED, Detail
Design, IFC stage, Procurement, Construction, Mechanical Completion, PSSR, Pre-commissioning,
Commissioning & handing over of the projects including preparation, follow up & close out of system / sub-
system wise Punch lists, preparation of project dossier & final handing over duly covering the red line mark-
ups and up till the As-built stage.
Project Management/ Construction Management, Construction Supervision, Promote HSE & strive to achieve
zero incidents goal. Coordinate with multi-discipline works, Architectural/Civil/Structural/ Mechanical
piping/HVAC/E& I. Coordination with RLIC / Halul Island with the O & M, Offshore terminal operations,
Control room & all other stake holders, Interface management-SIMOPS, HAZOP-HAZID-PHA Reviews

Project Planning/ Reporting & Contracts Administration /variations, coordination with stake holders.
Coordinate with Govt / authorities. Follow up with QA/QC & Site Inspections. Procurement assistance,
involved in resolving the issues with the Sub-Contractors / Vendors / Specialist suppliers.

FIELDS OF EXPERTISE:

(Oil & Gas Projects): Upstream, Midstream, Downstream, Onshore & Offshore, Green field / Brown filed
projects & Process plants).
Petrochemical plants, Tank farms, LNG Plants, Gas Receiving Facilities, Refineries, Pipelines, pipeline
corridor / road crossings, manifolds, Crude Oil Import/Export facilities, Diesel Bunkering, Integrated Oily
water/sludge handling system, Low Pressure Associated Gas Compressor Facilities, Subsea cable project,
Upgradation of existing pumping facilities in LNG plants, Refurbishment works for the DLB 2000, Engineering
support for Fabrication & Installation of Offshore Platforms-Jackets, Decks & LQ Modules and Common
Cooling Seawater Project (RLIC).
Infrastructure Projects:
Desalination plants, Wastewater/Sewage treatment plants, Power plants, Substations, Pumping Stations,
Storage Tanks, Wet Utilities collection and distribution networks (Foul water/storm water/potable
water/Irrigation water), drainage projects, port upgradation projects, cofferdams, reclamation works, shore
protection works and all associated piping/pipeline networks.
Building Projects:
Residential (Single, Multistoried, Highrise towers) with state-of-the-art architectural finishes / industrial /
commercial buildings, showrooms with high-end finishes / warehouses, and mixed-use buildings in the
process / petrochemical plants.
🞂 Resume: NAMALA SURENDER

EMPLOYMENT HISTORY:

Period Employer Department Designation Service span


Sept 2022- RLPP-Qatar Energy/ Project Currently working.
Engineering
till date CP Chem JV Engineer (Engineering)
(QPM) Qatar Project Project Management & Senior
Dec 2020- 1 year 9 months
Management Company Construction Infrastructure
August 2022 (Construction/Engineering)
(Semi-Govt)-Qatar Management (PMCM) Engineer
Qatar Design Project Management &
Aug 2015- Resident 5 years 3 months
Consortium-Doha, Construction
Nov 2020 Engineer (Construction)
Qatar Management (PMCM)
Engineering Major 8 years
Qatar Energy: Qatar
June 2007- Capital Projects: Construction (3 ½ years-Onshore
-Onshore
May 2015 (Onshore & Offshore Supervisor 4 ½ years-Offshore).
-Offshore
Engineering) (Construction)
Engineering:
Pan Emirates 6 years
(Seconded to ADGAS /
June 2001- Engineering Ltd-Abu (Oil & Gas-Onshore &
Dolphin Energy / Civil Engineer
May 2007 Dhabi (PMC services to Offshore)
NPCC / ILF Consulting /
Oil & Gas) (Construction/Engineering)
ADCO)
April 1999- 2 years 1 month
STEEL FAB-Dubai Technical Civil Engineer
May 2001: (Construction/Engineering)
March 1995- Contech Engineering
Construction Site Engineer 4 years (Construction)
March 1999 Ltd-Dubai-UAE
S. Prabhakar
June 1993- 1 year 9 months
Construction Company- Civil/Infrastructures Site Engineer
Feb 1995 India
(Construction)

Current Job Title: Project Engineer-Ras Laffan Petrochemical Project (Sep 2022 to till date)
Project Value: USD 7.0 billion
Job responsibilities / Principal accountabilities with CP Chem / Qatar Energy (RLPP)
Project’s Overview: Ras Laffan Petrochemicals Project (RLPP) to support the design and construction of a 1000
kMTA ASL Polyethylene unit and a 680 kMTA ADL Polyethylene unit, Bagging and Port infrastructure.

The Ras Laffan Petrochemical Project (RLPP) is a joint project between Chevron Phillips Chemical Company LP
and Qatar Energy in the development of a new petrochemical plant in RLIC, Qatar. RLPP includes a 2,080 KTA
ethylene cracker, two high-density polyethylene units, associated utilities, offsites, and pipelines, and a
construction camp catering for a conducive living of 28000 persons within RLIC.

 As a Project Engineer, contributed for the detailed design / engineering developments for all the buildings
(110 Nos. of mixed-use buildings within the plant facilities and 5 Nos. of buildings in the RLIC port area)
including Architectural/Civil/structural/HVAC and associated equipment / utilities / Plumbing / Drainage
ensuring the safe, reliable operations of the facilities and equipment, meet the expectations of the business
unit, operations, process safety, maintenance, and environmental requirements.
 As a Project Engineer, ensured that the collaboration with internal and external stakeholders to identify
gaps, develop solutions, provide expert feedback, develop procedures, and produce a capital efficient
facility.
 Participated in the review of 30 %, 60% and 90%-3D model reviews of the ongoing facilities for all the RCC &
steel structure buildings, steel structures, pipe racks & utilities of the RLPP to contribute the process hazard
reviews including the port buildings of RLIC.
 As a Project Engineer, actively participated & overseeing the Detailed Design, review of material approval
requests, and support the project team during early-stage Construction and Startup phases of the project.
 Contributed for the detailed design / engineering developments for all the buildings of Polyethylene
regarding Architectural / HVAC/ including (RLIC) port buildings, ensuring project technical and contract
requirements are satisfied by monitoring and reviewing design outputs of contractor and vendors. Ensure
operations and maintenance requirements are satisfied.
 Participated in the kickoff meetings with critical vendors. Coordinated with QChem / QChem- facility
management and interface with external stakeholders. Manage, coordinate, and consolidate responses to
queries, clarifications, and document reviews from stakeholders. Provide design and engineering input and
recommendations considering capital costs, safety, environmental, operability, maintainability, and
reliability. Coordinate with other disciplines (Piping, steel structures, Instrumentations, electrical, civil,
etc.) where cross-functional support is required. Engage subject matter experts (SMEs) when needed.
Coordinate Company review of Management of Changes (MOC) and PHA Action Requests.
 Ensured that the capital efficient design is implemented through each phase of project execution of the
Project. Responsible for overseeing the design and construction of the Polyethylene bulk bagging, loading
🞂 Page 2 | [email protected]
🞂 Resume: NAMALA SURENDER
systems and port facilities. Advise project management of developments that could affect safety, quality,
cost and schedule. Assist in preparation of operations system for organizing and maintaining documentation
necessary for Operations.
Dec 2020-Aug 2022: Qatar Project Management (QPM-Semi Government Company-Qatar)
 QPM is an ISO 9001 Company providing Engineering Consultancy Services to the Civil, buildings &
Infrastructure sectors including Oil & Gas (onshore & offshore), Petrochemical & power sectors.
Position: Senior Infrastructure Engineer (Project Management & Construction Management)
Infrastructure/accommodation project, Qatar
Design & Build Contract for the construction of Infrastructure and housing project for a population of 67432
catering to the world cup FIFA 2022.
Project Value: QAR 1.932 billion
The project includes the Design & Engineering, procurement, construct & commission the following:
1) Accommodation units (177 buildings) for a population of 67432 for conducive living.
2) 17 Nos. of substation buildings and primary substation
3) Operations & Maintenance building, Ministry of Interior buildings, Clinic, Friday Mosque & daily mosques,
Hypermarket, local & central retail, Mess Hall & laundry facilities.
4) Foul water network systems with Sewage Treatment plant & TSE produced will be utilized for irrigation
networks and the excess TSE connected to deep well injections.
5) Storm water network systems with holding tank/filtration systems and finally connected to deep well
injections.
6) Design & construct the HVAC system for the control room, mosques, admin Office, Ministry Of Interior
building & O & M (Waseef) builing.
Job responsibilities/Principal accountabilities
 Actively participate in the Design developments of all the projects right through the design phases of
Schematic Design, Conceptual design, Detail Design, attending Hazop/Hazid//PHA/ Envid reviews, IFC stage,
red line mark-up and up till the As-built stage. Review the designs & recommend the approval status to the
Client at all levels of the design.
 Review approve& Implement JSA/JHA / risk assessment requirements are met as per the HSE policies
effectively at site without affecting the progress & quality of the job. Micro tunneling works for PWA/
ashghal by coordinating with all the respective stake holders.
 Review EPIC Contractor’s work schedules / baseline program / Work Breakdown Structures / dashboard
programs/monthly to ensure that, the construction activities including procurement and other engineering
deliverables that are effectively organized to meet the Projects’ completion dates with due consideration on
achieving the KPI’s / milestones of the Project and report the KPIs to the line manager.
 Attending weekly/monthly Construction Progress, QA/QC & Safety review meetings, anticipate in advance
and report the short falls to the Head of construction.
 Play a key role in coordinating the project’s scope of works for the Mechanical Completion, pre-
commissioning, commissioning of all the buildings systems & handing over of the final dossier along with the
snagging/de-snagging/punch lists close out, red line mark-ups and as-built status of the project.
 Coordinate with all the stake holders for the completion of the project and coordinate with the Government
authorities for obtaining the building completions certificates.
 Handover the facilities to the facility management / O & M Teams.
Aug 2015-Nov 2024: Qatar Design Consortium-Qatar
 QDC is an ISO 9001 Company providing Engineering Consultancy Services to the Civil, buildings &
Infrastructure sectors including Oil & Gas (onshore & offshore), Petrochemical & power sectors.
Position : Resident Engineer (Project Management & Construction Management)
Infrastructure/process unit project, Qatar
Design & Build Contract for Rehabilitation of Doha South Sewage Treatment plant project for Ashghal /
PWA-Doha:
Rehabilitation works for the whole plant which include:
1) Refurbishment of Inlet reception/grit chambers, upgradation of old valves at storm water tanks, ASP
plant & FST, SAS wasting capacity, secondary clarifiers with bottom scrappers, TTP, Ultra Filtration (UF)
balancing tank, liquor pumping stations, TSE/VFD, MOV valves for isolation of lagoons, aerobic digesters,
gravity filters, anoxic tanks, thickening building, pumping stations & common conveyor structure for
dewatering centrifuge system.
2) Repair/Refurbishment or replacement of Civil/Structural works for 35 nos. of buildings including the
installation of HVAC / Buildings services.
3) Construction of Odor Control Units, new/additional aerobic digesters, Side Stream Filtration, bulk
chemical storage & substation buildings.
4) Micro tunneling works for the wastewater drainage system for PWA/ ashghal by coordinating with all the
respective stake holders.
Projects completed:
Construction of logistics hub at Bu Sulba for Gulf Warehousing Co-Al Wukair-Qatar, including 19 Nos. of
🞂 Page 3 | [email protected]
🞂 Resume: NAMALA SURENDER
warehouses (A/C & Non-A/C), 6 Nos. of Substations, cold storage warehouses, 2 Nos. of sewage treatment
plants, roads, drainages, fire water networks including tanks, potable water networks, CCTV and
Accommodation blocks for the workers/ staff all other related infrastructure works.
Design & Build Mannai Headquarters, Auto showroom (Cadillac & GMC) and warehouses @ Doha Industrial area
including the HVAC systems.
Job responsibilities/Principal accountabilities
 Review EPIC Contractor’s work schedules / baseline program / Work Breakdown Structures / dashboard
programs/monthly to ensure that, the construction supervision activities including procurement and other
engineering deliverables that are effectively organized to meet the Projects’ completion dates with due
consideration on achieving the KPI’s / milestones of the Project and report the KPIs to the line manager.
 Attending weekly/monthly Construction Progress, QA/QC & Safety review meetings, anticipate in advance
and report the short falls to the Head of construction.
 Review approve& Implement JSA/JHA / risk assessment requirements are met as per the HSE policies
effectively at site without affecting the progress & quality of the job.
 Administer contractor’s works and submissions, evaluate quality of materials and workmanship, outline
contract changes orders. Quantify the completed tasks & certify the quantities for Contractor’s progress and
the interim / final invoices.
 Play a key role in coordinating the project’s scope of works for Mechanical Completion, hook-up, pre-
commissioning, commissioning & final handover of the project including handing over of the final dossier
along with the snagging/de-snagging/punch lists close out, red line mark-ups and as-built status of the
project.
 Coordinate with all the stake holders for the completion of the project and also coordinate with the
Government authorities for obtaining the building completions certificates.
 Handover the facilities to the facility management / O & M Teams.
June 2007-May 2015: Qatar Energy (Major capital projects-onshore-Ras Laffan
Industrial City (RLIC) & Offshore Halul Island).
Qatar Energy Project (Ras Laffan Industrial City): Common Cooling Sea Water Project (CCWP, Ph-
2, Categories 1 & 2)-Project value USD 1.530 Billion (2007 to 2010)
 The Overview of the project: The $ 1.53 Billion CCWP / PH-2 Category-1 & category-2, (EPIC) project is
based on a combination of “Once through” and “Recirculation system” providing cooling water to the various
consumers including Qatar Gas-LNG 1, Ras Gas-LNG 2 & Q-Power.
 Working as a team member for the overall Construction supervision of all the on-going site activities of
nearly 590,000 Cum of RCC works, 40,000 MT of Rebar, 15000 MT of structural steel in various areas
including Piling works (1258 piles), Construction of Intake areas, Cofferdams, Intake Pump Houses (2 pump
houses with 18 pumps), Manifolds, Distribution & Collection of Piping System (78 km GRE pipeline with an
average of 3000 mm dia.) and Related Auxiliary, ancillary facilities/Buildings as follows.
 Category-2 Consists of 52 km length of pipelines including U/G and A/G, GRE/GRP (Dia. varies from 600 ID to
3200 ID), 60,000.00 Cum of RCC works for the sleepers, anchors, manifolds, pipe bridges, valve
pits/chambers, LLCC buildings (3 nos.), MOV building etc and earthworks of 300,000 cum.
 Coordinate for the HVAC systems for all the buildings like Electro-chlorination building, Control building,
VSDS buildings (2 nos.), Operations Building, LLCC buildings (5 nos.), Substations/220 kv building, 33 kv
building, 33 kv electrical Switchgear building, workshop & Warehouse structures, Gate houses etc.
 Roads, Paving, Road Crossings, Utility Crossings like Product Corridors, Power Corridors, WET utility
Corridors, HP Gas Corridors, Pipe Bridges, platforms/crossovers, valve chambers, Pipe sleepers, anchor
blocks, thrust blocks, piling works, Receiving Basin, Discharge Channel, Stoplog Gates, Transition channel,
Diversion channel, Outfall Structure, Site grading/earthworks, Fencing the facilities within the project
battery limits @ RLIC.
 CCWP / PH-2 Category-2, is an EPIC project includes the construction of supplying cooling water to the end
users like IPP3, Shell GTL, Barzan Gas & Laffan Refinery.
Qatar Petroleum-Offshore Projects:
EPIC of Integrated Oily water/sludge handling system:

⮚ Construction of fire protection system/modification for Crude Oil Manifold system, surge tank area &
produced water system. Operating, Control & safeguarding philosophy of drain system, produced/formation
water system and sludge mitigation & handling system etc.
EPIC of Low Pressure Associated Gas Compressor Facilities:

⮚ Design philosophy of the project: To achieve zero flaring of the low-pressure TOTAL gas. To reduce the
current environmental pollution due to the burning of the sour fuel gas coming from PS-2 Platform.
Blending sweet TEPQ (Total Exploration and Production Qatar) wet gas and sour PS-2 dry gas to improve the
gas turbines lifespan. All available sweet gas will be used for blending which shall be supplemented by
drawing sour gas from PS2.

🞂 Page 4 | [email protected]
🞂 Resume: NAMALA SURENDER
⮚ Foundations for the LP Gas Compressor A-5052 @ TEPQ (TOTAL), LP Condensate pumps, A5052 P1 A/B, Two
units of FGTP A-5050 & A-5051– both suitable for sweet and sour gas service located towards north of Phase
I & II Turbine areas. On-line mixer N-5002 and Buffer vessel V-5096 for blending the treated sweet and sour
gas.
EPIC of Crude Oil Import/Export upgrade facilities and beach landing facilities:

⮚ Operating and control philosophy: The crude oil system comprises of pig receivers for the sub-sea
pipelines from Off-shore fields (Namely PS-1, PS-2, PS-3 and Al-Khalij) and Single Buoy Moorings (SBM-1 and
SBM-2) for routing the crude oil received to wet crude oil storage tanks T5001 to T5005 in the South Tank
farm. Following dehydration, the crude oil is then pumped (transferred) to six dehydrated crude oil storage
export tanks T5006 to 5009 and T5050/5051 in the North Tank farm.

⮚ The crude Oil in the export tanks is pumped to two SBMs using the existing EVSD pumps and four new EVSD
pumps.
EPIC of Desalination Plant & Potable water storage tanks at Halul Island:
Design philosophy of the project: The new desalination plant is designed to produce 2,400 m3/d of potable
water from seawater by using reverse osmosis technology. The RO (Reverse Osmosis) process comprises of
construction of the following elements.
⮚ Sea water intake and brine outfall, Intake pumping stations feeding the new desalination plant, New
desalination plant (including pre-treatment and RO units), Tanks and associated pumping stations within
the new desalination plant (pumping stations to and from existing potable storage tanks and pumping
station to supply Total Exploration Qatar-TEPQ), Chemical dosing facilities associated to the intake, pre-
treatment and potabilization of RO permeate produced, New potable water storage tanks (2500
Cum/each), associated pumping stations and piping network, Wastewater and sludge treatment facilities.
EPIC of 33/11 kv Power Distribution Substation:

⮚ Construction of 33/11 kv PDS building with all associated cable trenches, cable cellars, Transformer
foundations, HV/LV equipment foundations, road crossings and other associated finishing works. Interface
coordination with the construction team of sub-sea power cable project (Ras-Laffan to Halul)/132 kv
substation building at Halul.
EPIC of CCTV/PAGA and Access Control Systems:

⮚ The project involves the installation of a fully functional state of the art closed circuit television (CCTV)
system, public address/general alarm (PA/GA), access control system (ACS) and intrusion detection system
(IDS) together with integration of the new systems to form one electronic security system (ESS) which will
be interfaced with the existing Qatar Energy information technology server for communication to QE’s Doha
central security center.
EPIC of Diesel dispensing /bunkering and associated facilities at Halul Island:

⮚ Construction of diesel dispensing/bunkering facilities, including construction of new diesel storage tank
with automation stock control methodology. Optimization of associated facilities such as fire protection
and other safety system for the diesel storage tanks & ancillaries.
Infrastructure Project: Construction of Integrated Chiller, Freezer, Laundry, Dining& Accommodation
facilities for 600 bed accommodation complexes (Halul Island):
⮚ The 600-bed accommodation complex project on the Halul Island involves the construction of 4
accommodation blocks, chiller, freezer, dining/mess/multipurpose hall facilities, administration block,
laundry block, supermarket, HV/LV substations/transformer units, pump house/water tank, septic tank,
and sports facilities etc., including coordination for the commissioning of the HVAC systems
Infrastructure Project: Construction of Centralized Industrial Area (Halul Island):

⮚ The infrastructure project on the Halul Island involves the construction of Office block, marine stores,
workshops/warehouses, compressor/gas cylinder storage facilities, blasting and painting booth, shoreline
protection works etc. that could cater additional Offshore Industrial facilities.
Infrastructure Project: Construction of New Security Building/Telecom building complex including the North
Ring Road of Halul Island:

⮚ New security building complex is a G+3 storied building with many facilities like sub-station building and an
armory building, external service yard building and the connecting Heliport, access/internal roads, land
scarping, fencing and other external works.
⮚ New Telecom Building with the following support facilities: This is a G+2 storied building with car parking
and external pump room and diesel generator set including the coordination for the commissioning of HVAC
systems.
Job responsibilities/Principal accountabilities;

🞂 Page 5 | [email protected]
🞂 Resume: NAMALA SURENDER
 Worked as a project team member in the Construction team of Qatar Energy’s projects @ Ras Laffan for the
Common cooling Seawater facilities providing seawater to RasGas LNG2, QatarGasLNG1, Shell GTL, Barzan
Gas, W4/LNG1, Q-Power &Independent Power Plant (IPP3).
 Construction Supervision of all ongoing works, working in line with the plant shut down schedules, with the
valid PTWs and play a key role for the project interface environment in facilitating sound and efficient
communication to resolve interface issues with many concurring parties/stake holders/end-users/asset
holders like RLIC Project Engineering team, RLIC port operations team, RasGas LNG2, QatarGas LNG1, Shell
GTL, Barzan Gas, Oryx GTL, W4 LNG1, Laffan refinery, Dolphin Energy, Q-Power and Independent Power
Plant (IPP3), O & M of Seawater Facilities-RLIC, other ongoing projects of Qatar Energy, TOTAL / OXY / Halul
Terminal Operations, Production stations, Sub-sea cable project team and etc.
 Coordinated with all the stake holders to resolve the issues related to the construction of pipelines /
pipeline corridor crossings as per the Crossing matrix of RLIC and accordingly constructed the pipe
bridges / culverts, road crossings / utility crossings (Kahramaa power lines), road crossings for storm
water discharge with horizontal directional drilling operations.
 Stationed @ QP-Offshore facilities (HALUL ISLAND) for the execution of QP-Offshore Engineering Oil & Gas
(Brownfield/Greenfield) and infrastructure projects assisting EPC team with the QP Offshore e-PTW. Worked
as Client’s representative (Qatar Energy/Dolphin Energy Ltd/ADGAS/ADCO/NPCC/Ashghal) in the execution
of the Oil & Gas projects including brown field/green field projects.
 Aid the EPIC Contractors in obtaining Qatar Energy /RLIC e-CPW and oversee if the Contractors are
complying the PTW procedures. Review on Contractor’s technical packages for the PTW/e-CPW
requirements, coordinate with all the relevant authorities for all the ongoing construction works and
coordinate with concurring parties for SIMOPS (TOTAL / OXY / QP-HALUL) for an efficient PTW working
procedures/execution of projects.
 Review, comment & implement the Project Execution Plans (PEP), Methods Statements, Constructability
Techniques, feasibility studies, Rigging studies, critical lifts, Technical Queries, Field/Design Change Notes
(FCN/DCN), CDR’s, Inspection Test Plans (ITP), Corrective Action Reports for the NCRs, Material Approval
Requests (MAR’s), Technical Data Sheets, vendor documents, third party documents & Material Safety Data
Sheets (MSDS).review & implement the Project Quality Plans (PQP).
 Attend the daily site meetings, site safety walkthroughs periodically & participate in safety awareness
programs, conduct safety audits randomly on the Contractors HSE performance at site to
promote/adopt/enhance the safety culture.
 Review and evaluate 3rd party reports for the material compliance requirements including the welding
qualification certifications.
 Coordinate with HSE team for the execution of EPIC Contractor’s scope of works & strive to implement
Company’s safety standards to accomplish zero incidents policy. Participate in the incident / accident
investigation team.
 Review, Comment & Implement Job Safety/Hazardous Analysis requirements effectively at site without
affecting the progress & quality of the job as per the Company’s HSE policies.
 Inspect/monitor/review/witness/approve & execute on-going site activities through RFI’s and ensure that
the construction works are executed per the approved PQP, IFC documents, IFC drawings, ITPs, method
statements, in accordance with Qatar Energy’s QA/QC policies.
 Working as a team member in the Construction of Civil/Structural works / pipeline associated with the
project’s scope of work including EW packages/mobilization and in coordination with Mechanical/piping,
HVAC/Building services, Electrical/ Instrumentation & HSE, including mechanical completion, hook-up,
PSSR/ pre-commissioning/commissioning, final handover of the project dossier along with punch lists close
out records, red line mark-ups and raising the documents to the as-built status of the project.
 Coordinate with Offshore terminal engineering departments/Offshore Terminal Control Room, Terminal
Operations Engineering & maintenance, Terminal facility management Department, Marine Dept, NSS
(National Security Shield) and Fire/Safety departments.
 Coordinate with QP-Offshore Sub-Sea cable project team for the Sub-Sea cable from Ras Laffan to Halul
Island.
 Coordinate with fabrication yard for the material/fabrication/hot works/blasting & painting for the steel
structures. Review on welding procedures & third-party certifications.
 Assist the Senior Project Engineer for the preparation of engineering deliverables including pre-FEED, FEED,
attending HAZOP/HAZID review meetings, aiding for Engineering input & mid tender site visits by the Project
Management / Contractors for the ongoing / upcoming projects.
 Participate in the internal/external audits of the QA/QC & HSE records.
 Play a key role in coordinating the project’s scope of works for Mechanical Completion, hook-up, pre-
commissioning, commissioning & final handover of the project including handing over of the final dossier
along with the snagging/de-snagging/punch lists close out, red line mark-ups and as-built status of the
project.
June 2001-May 2007: PAN EMIRATES ENGINEERING (PEL) LTD-ABU DHABI

🞂 Page 6 | [email protected]
🞂 Resume: NAMALA SURENDER
 PEL is an ISO 9001 Company providing Engineering Consultancy & manpower recruitment Services to the Oil
& Gas (onshore & offshore), Petrochemical, power & Infrastructure sectors.
Position: Civil Engineer
PMC/Construction Supervision services for Dolphin Energy Ltd. Abu dhabi (Year 2004-2007).
The Overview of the project: Gas Receiving Facilities-Taweelah, EPIC project including the Construction of
Receiving Facilities, a 10 km 48” on-shore Gas pipeline, Hot-tap tie-ins with existing Gasco pipelines & tie-in
with the 48” Export Gas pipeline (Midstream P/L) which in turn connected to the subsea pipeline of 366
km, from Ras Laffan, Qatar.
Job responsibilities:
Responsible for the overall Construction Supervision of all the on-going site activities in various areas as listed
below: -
 Construction and coordination for the foundations of 48” & 36” Hot-tap tie-ins with the existing Gasco
Facilities. Construction of 48" Pipeline (subkha areas, non-subkha areas & high-water table areas) and the
relevant berm construction up to the tie-in point with the existing Pipeline.
 Construction of Anchor Blocks, Valve Pits, LLCC building, Operations Building, Administration Building,
Warehouses and Gate houses.
 Construction of foundations (pre-cast & in-situ) for Gas Heaters, Instrument air, Metering Skid, Emergency
generator, Pressure Reduction Skid, Inlet Filters, Cold Vent stack, HIPPS valves, Access Platform, crossovers,
sleepers, pre-cast wall panels and many other miscellaneous pipes / supports.
 Construction of piles/stone columns (1025 nos.) below the major foundations.
 Construction of Roads, drainages, water supply lines, Culverts & fencing.
 Site grading and the related earthworks (approx. 245,000 Cum) filling/cutting.
PMC services to ILF consulting Engineers for Dolphin Energy Ltd.
 Worked for ILF Consulting Engineers as a Civil Engineer for the Eastern Gas Distribution System (EGDS)
upgrade works project, for M/s Dolphin Energy Ltd as per the GASCO specifications and standard drawings.
 Involved in the preparation of FEED (Front End Engineering Design) package, Coordination with all other
disciplines & with the Client (Dolphin Energy Ltd) for the EGDS (Eastern Gas Distribution System) upgrade
works, for the following pipeline projects.
 Al Maqta-Jebel Ali 48” pipeline (Taweelah to Tie-in point and hot tapping of the same to Maqta-Jebel Ali)
 Al Maqta-Taweelah 24” pipeline, Al Maqta-Taweelah 36” pipeline, Al Maqta-Al Ain 30” pipeline, Al Ain
Cement Factory 12” pipeline.
 Working as a team member for site visits, site measurements and coordinating with the survey sub-
Contractors (Topographical & Geotechnical) for the EGDS project.
 Involved in the preparation and checking of Pipeline Alignment sheets, pipeline corridors, Civil/structural
detail drawings including, pipe supports, tie-in concrete pits, access platforms, crossovers, block valve
stations, Control Room/ Operations Building, Administration Building & Workshop/Warehouse building etc.
Jebel Dhanna Tank Farm upgradation, ADCO-Abudhabi (Year 2003- 2004)
 Preparation of FEED package for the additional tank farm at Jebel Dhana.
 Preparation of Project Scope, Site survey/measurements in coordination with the survey/sub-Contractors.
 Checking of project/master drawings, MTO’s and involved in the preparation of Engineering Dossier for the
construction package and also coordinating with inter disciplines, ADCO & sub-contractors. Site survey in
coordination with survey contractors includes, carrying out various tests on the existing concrete structures
(Concrete strength, chlorination test, cement content test and degree of corrosion to the existing rebar in
the RC structures etc.) for the assessment of the integrity of the structure, and accordingly advise ADCO
with the remedial actions to be carried out for the existing structures.
 All the works have been carried out in accordance with company’s QA/QC & HSE policies.
June 2001-November 2003:
Off-shore Projects:
 Supporting the lead Civil Engineer for Engineering, Procurement assistance, coordination with Fabrication
yard, load out/Transportation & installation of the Off-shore Jackets (15 Nos.), Decks (7 Nos.) & LQ modules
(2 nos.) for M/s NPCC, for Saudi Aramco project.
 Coordinated for Engineering, Procurement assistance, Fabrication & installation/modification requirements
for the Derric Lay Barge (DLB) for Valentine Maritime Gulf Ltd, Abudhabi for the (Off-shore) subsea pipeline
construction of Adani port Project.
 Coordinated for the modifications of the Offshore supply base facilities for ADNOC, Abudhabi, including the

🞂 Page 7 | [email protected]
🞂 Resume: NAMALA SURENDER
preparation of shop drawings, procurement assistance & construction supervision.
ADCO projects:
 Involved in the detail engineering & construction supervision of modifications at ASAB Petrol Station.
 Coordinated for detail engineering services and construction supervision of foundation for compressor &
cooler for vapor recovery project for M/s Worley.
 Involved in the Terms Of Reference (TOR) dossier preparation for Bab field master drawings updation
project.
ADGAS Projects:
 Coordinated for detailed Engineering, procurement assistance and Construction supervision (EPCM) for
addition of 3rd MECO PUMP at Das Island including detailed survey, as-builting and retrofit involving all
disciplines, Civil / structural/ Rotating Equipment / Instruments and Controls / Electrical, QA/QC etc. The
pump has a capacity of 60 Cum/hr at discharge pressure of 72 barg and installed with stainless steel piping
system.
 Involved in the modification of LNG plant Access platforms, including site measurements, preparation &
checking of shop drawings, MTOs and coordination with the Client at Das Island. Underwent for safety
training at ADGAS, Das Island.
 All the works have been carried out in accordance with company’s QA/QC & HSE policies.

Takreer Project: Ruwais Refinery Expansion Project (General Utilities Plant)-Ruwais


 Worked as Field/Engineering Coordinator for General utilities Plant (Ruwais Refinery expansion project)
coordinating with the Vendors, Main/sub-Contractors & with the Client for the preparation of redline mark-
ups & as-built drawings, handing-over of final dossier & close-out of the project for M/s ABB for M/s Takreer.
April 1999-May 2001:STEEL FAB (ISO 9002) Al Quoz, Dubai,
Steelfab is an ISO 9002 Company specialized in supply of Cut & Bend and fixing of Reinforcement Bars to the
Construction Industry on a large scale basis.
Position : Civil Engineer
Duties & Responsibilities:
 Assigned for the Technical/Contractual co-ordination & construction supervision.
 Coordination with the Production Department and also sorting out Technical & Contractual issues with the
Clients, Contractors & Consultants.
Some major projects:
Worked as a team member for the execution of following structures.
 The Tower (B+G+49+Service Roof) for M/s NASA Multiplex, Dubai.
 Residential / Commercial Complex (2B+G+26 storeyed) for M/s NEMR Emirates Contracting Co. at Al khan,
Sharjah.
 Expansion of Dubai International Air port (TD 196) for Skanska / Arabtec Construction Co.
 Residential / Commercial Complex (2B+G+11 storeyed) for M/s ASCON, at Port Saeed, Dubai.
 Expansion of Deira City Center (G+M+12 storeyed) Deira, Dubai.
 General Civil Aviation Building for M/s Dubai civil aviation authority, Dubai.
 Residential / Commercial Complex (G+M+11 storeyed) for M/s ASCON-NASA-Multiplex, Dubai.
Nov 1997- Mar1999: CONTECH ENGINEERING CO. LLC, Jebel Ali FZE, Dubai, UAE.
Contech Engineering is an ISO-9002 Company Specialized in Supply, Fabricate, transport & Erection of heavy
structures like Bridge/plate Girders, Conveyor structures, Silos, Crane girders etc, including Civil construction
activities, Workshops, Warehouses for Power stations.
Position: Site Engineer.
Duties & responsibilities
 Execution of R.C & Steel structures in coordination with the Consultants, sub-contractors & site personnel.
 Coordinate with Fabrication yard for the fabrication of structural steel, ensure that the transportation plans
are in place for heavy structural steel including the installation/erection of the same.
 Underwent for safety training in Dubal (Dubai aluminium company)
 All the works have been carried out in accordance with company’s QA/QC & HSE policies.
Some major Projects completed:
 Construction supervision for the Dubai Municipality staff club For M/s Ginco Contracting Est.
 Construction supervision for the JAFZA Port expansion (UAE)
 Construction supervision for the construction of access platforms, crossovers, foundations, workshops &
warehouses for M/s Besix at Aweer Power Station.
🞂 Page 8 | [email protected]
🞂 Resume: NAMALA SURENDER
 Coordinated for the supply & fabrication of superstructure assembly for aluminium smelter for m/s Dubal
(Dubai aluminium co.), Dubai.
 Underwent for safety training in Dubal (Dubai aluminium company)
 All the works have been carried out in accordance with company’s QA/QC & HSE policies.
Oct 1996-Oct 1997: DUTCO BALFOUR BEATTY LLC (ISO-9001)-DUBAI, UAE
Position: Construction Engineer
Duties & Responsibilities:
 Execution of assigned items under the scope of work for the prestigious Burj Al Arab project as per
Consultants requirements at Chicago Beach resorts Developments.
 Coordination with the Consultants, Sub-contractors and with the site personnel.
 Piling works for the Burj Al Arab tower, Sports area terraces, Tennis courts, kids club, Retaining walls, Beach
pergolas, Swimming pools, Adult pool bar, Boundary wall, Marina restaurant, Break waters, Palm court
terraces, Beach comber areas, Pub terraces, colonnades, Beach lobby drums, Services, Sports pergolas,
Sewerage systems, Landscaping, Gate houses and Gazebos.
Special Assignments:
 Detail engineering services &construction supervision of the fabrication / erection of bridge girders for the
access bridge to BURJ AL ARAB.
 Checking of Rebar/ shop drawings, Bar Bending schedules for access bridge to Burj Al Arab.
 Assisting the Quantity surveyor for the preparation of Bill Of Quantities for the access bridge girder of Burj al
Arab.
Mar 1995-Oct 1996: Contech Engineering Co.LLC (ISO-9002)-Dubai, UAE
Position: Site Engineer
Duties & responsibilities:
 Coordination with fabrication, transportation & installation of structural steel members.
 Estimation of works, Man power planning and preparation of construction schedules & projects Execution.
 Coordination with sub-contractors, Consultants, suppliers and with site personnel.
Some major Projects:
 Coordinate with Fabrication yard for the fabrication of structural steel, ensure that the transportation plans
are in place for heavy structural steel including the installation/erection of the same.
 Construction of Workshop and Office block for M/s Gasos Bin Hamoodah, JAFZA, Dubai.
 Construction of Warehouse and Office block for M/s Al Bawardialan dick, JAFZA, Dubai.
 Extension of Helium facility plant for M/s Air products (M.E), Jebel ali FZE, Dubai.
 Construction of Workshop for M/s Contech Engineering, JAFZA, Dubai.
 Erection of Structural Steel for Cargo building, Passenger terminal Building and Utilities Building at Ameri
Flight Facilities, Abu dhabi for M/s Al Wimpey, Abu dhabi.
 Construction of Quay & Inclined conveyor (36.0m high Silos) for M/s Gulf Imports & Exports Co. JAFZ, Dubai.
 Erection of Interchange Bridge Girders (Al Nahda Interchange-400.0 tonnes) for M/s Al Naboodah on Dubai-
Sharjah highway.
May 1993-Feb1995:S.PRABHAKAR CONSTRUCTION CO. Hyderabad, India.
Company Profile: Class-1 Contracting company undertaking Construction of Residential, Commercial buildings
(Multi storeyed), Construction of roads & Drainages.
Position: Site Engineer
Duties & responsibilities:
 Estimation of works, Manpower planning, construction schedules & projects Execution.
 Coordination with sub-contractors, Consultants, vendors/suppliers and with site personnel. Construction of
Residential (G+4) apartments including cellar Raj Bhavan Road, Hyderabad-India. Construction of Roads and
Drainages for Jubilee Hills Co-operative Society, Jubilee Hills, Hyderabad, India.