6.1. Project Integration Management
6.1. Project Integration Management
Project Integration
Management
Getting the job done
Case study
8 teachers’ trip starting from Asia and ending in
France
2 Organizers
form
teachers
took
responsibility
13/01/2019
Case study
Continued
Project
Manager
(Travel
agent) see
into this
project
Case study
Continued
• PM convinces the teachers to travel in June because of the great
savings on tickets.
• But PM not really planning for the results of that decision—and
neither are the teachers.
For a large project, you’ll often see this pattern repeated several times.
Each major chunk of deliverables is treated as its own subproject that
goes through all of the process groups and processes on its own.
13/01/2019
TO DOs FOR PM
First you get Then you plan out And once it’s
assigned to a all the work that finished, you close
project. will get done. out the project.
The Project
Management
plan is the
core of
Integration
Management.
It’s your main
tool for
running a
project.
PM Success Tip
Request Integrated
Change Control
• A change control system is
the set of procedures that lets
you make those changes in an
organized way.
• Change control is how you
deal with changes to your
Project Management plan
• You always have the authority
to make changes to your
project if they don’t affect
cost, schedule, or scope.
13/01/2019