S4HANA Configuration Using GBI Phase II Slides en v4.1
S4HANA Configuration Using GBI Phase II Slides en v4.1
Phase II - Procurement
Teaching material - Information
▪ Software used
• SAP S/4HANA 2020
• GUI 7.70
▪ Model
• Global Bike
▪ Prerequisites
• None
Authors
▪ Simha Magal
▪ Stefan Weidner
Target Audience
▪ Advanced
Learning Objectives
▪ Introduction
▪ Scenario
▪ Enterprise structure
▪ Process configuration
▪ Master data
▪ Process execution
▪ Introduction
▪ Scenario
▪ Enterprise structure
▪ Process configuration
▪ Master data
▪ Process execution
▪ In a preparation project (phase 0), the scope of the implementation project was defined.
▪ In project phase I, Bianca Cavarini (Chief Information Officer) and her team successfully configured basic
Financial Accounting processes in the S/4HANA system.
▪ In phase II, before starting to configure the procurement process, they are observing the work of the following
GBI employees:
• Silvia Cassano (Accountant Payable Specialist GBI US)
• Stephanie Bernard (Billing Clerk Accounts Receivable GBI US)
• Shuyuan Chen (Chief Accountant GBI US)
▪ Task Read the scenario and highlight the most important and relevant information.
▪ Task Revisit the reference symptoms/issues and condense them into problems specific to this case.
▪ Short Description You (in the role Mona Falco) need to come to a clear understanding of the most relevant
symptoms in Purchasing in order to identify the causes and underlying problems including the issue of invoice
discrepancy.
▪ Task Revisit the reference problems and identify possible solutions for Global Bike.
▪ Short Description In the role of Mona Falco (System Design and Dev Manager) and Sarah Garcia (Business
Analyst 2), analyze all relevant problems in Purchasing and Accounting and find possible solutions.
▪ Introduction
▪ Scenario
▪ Enterprise structure
▪ Process configuration
▪ Master data
▪ Process execution
e.g.
• Global enterprises
• Consolidated concern
• Corporation
• Holding
▪ In this context: Global Bike Inc. (US), Global Bike Germany GmbH
(DE)
• Areas designated for different types of material (raw material, work-in-process, finished Dallas Miami S. Diego Heidelb. Hamburg
DL## MI## SD## HD## HH##
▪ Negotiate general conditions of purchase and contracts for one or more plants or
DL## MI## SD## HD## HH##
CC US## CC DE##
companies.
CC US## CC DE##
• Decide to purchase land, but use a realtor (external purchasing group) to execute the
purchase
MI## MI##
▪ Define Plants
• Dallas: DL##
• Miami: MI##
• San Diego: SD##
▪ Define Plants
▪ Introduction
▪ Scenario
▪ Enterprise structure
▪ Process configuration
▪ Master data
▪ Process execution
▪ Assign Material Ledger Types to Valuation Area ▪ Set Tolerance Limits for Purchase Orders
▪ Activate Material Ledger Types for Valuation Areas ▪ Set Tolerance Limits for Goods Receipts
▪ Maintain Default Values for Tax Codes ▪ Define Attributes of Material Types
▪ Introduction
▪ Scenario
▪ Enterprise structure
▪ Process configuration
▪ Master data
▪ Process execution
▪ Example:
• SHRT1000 + MI00+ TG00
• SHRT1000 + SD00+ TG00
• SHRT1000 + US00 + Wholesale channel
• SHRT1000 + US00 + Internet channel
▪ One info record per combination of vendor and material (or material group)
• General data
• Conditions: pricing, discounts, free goods (current and future)
• Vendor data
• Texts (notes)
▪ Pricing conditions
• Gross price
• Discounts and surcharges
• Freight / shipping
▪ Create Vendor
• Vendor – Olympic Protective Gear
▪ Introduction
▪ Scenario
▪ Enterprise structure
▪ Process configuration
▪ Master data
▪ Process execution