ISRINA RESOURCES SDN BHD(438624-U)

No. 20 Tingkat 1, Jalan Bukit Mahkota 2/1, Seksyen 2, Bandar Bukit Mahkota, 43000 Kajang, Selangor.
Telephone: 03-89120999
Email: [email protected]

S/N Checklist Items YES NO N/A Remarks / Comments

1 Materials used are as per the approved delivery inspection (MIR) /


Check installation of air temination network which composed of but not limited to
the following: Air Terminal, Copper Tape, Down Conductor, etc. is carried-out as
2 per the approved shop drawing and methodology /

3 Check air terminals and copper tapes are securely anchored and clamped at proper
intervals /
4 Check tightness of bonding between the roof & down conductors and test link
/
5 Check all exposed equipments and metal /steel works in the roof are securely
bonded to the air termination network /
Check installation of earth temination network which composed of but not limited
to the following: Test Link, Earth Rod, Earth Pit, Main Earth Loop, etc. is carried-
6 out as per the approved shop drawing and methodology /

Check test link location is in accessible position for isolation/ disconnection of the
air termination network and enable testing of the earth termination network
7 /

Check èarth rods are driven in the approved location and are provided with earth
8 pit to allow access for bonding of main earth loop and LPS earth lead to the earth /
rod

9 Check tightness of bonding between the earth rod, main earth loop, LPS earth
lead and test link /
10 Check earth pit is provided with appropriate label, engraved "LPS Earth Below"
/
11 Lightning Protection System installation is complete as per project requirements
and is ready for testing and commissioning /

Prepared by: Endorsed by:

Name: Name:
Date: Date:
Designation: SUPERVISOR ELECTRICAL Designation:
Company: ISRINA RESOURCES SDN BHD Company: KLCC URUSHARTA SDN BHD