• Cement Bricks

3
• Cement Hollow Blocks

4
• Cement Solid Blocks

5
• Light weight Blocks

6
• Clay bricks

7
• Cavity wall

8
• BOQ item whether in m2 or m3

Below 20 cm
M2
thickness

Above 20 cm
M3
thickness

Cavity wall M2

9
• For m2 QTO : Length of wall*Height – opening area more than 1m2 (depends on MOM)
• For m3 QTO : (Length of wall*Height – opening area more than 1m2 (depends on
MOM))*wall thickness

10
• Length for 12 cm wall = 3.86+ 7.9 + 2.4 m = 8.16
• Height for 12 cm wall = 3.52-0-0.22 = 3.3 m
• Gross area=8.16*3.3=26.93 m2
• Openings for 12 cm wall = 0.8*2+0.9*2=3.4 m2
• Net area=26.93-3.4=23.53 m2
11
• Length for 25 cm wall = 4.7 m
• Height for 25 cm wall = 3.52-0-0.22-.55 = 2.75 m
• Gross area=12.925 m2
• Openings area= 1.5*1.5+0.9*2=4.05 m2
• Net area= 12.925-4.05=8.875 m2
• Net Volume=8.875*.25=2.219 m3 12
• If the external wall is a cavity wall – how do you think we will make a QTO for it ?

13
14
• Net area for 12 cm wall =23.53 m2
• Net area for 25 cm wall=8.875 m2
• Total wall Plaster area =8.875+23.53=32.4 m2
• Total Ceiling plaster area = 17 m2
15
• The last calculations is in case of not removing skirting height.
• In case of removing skirting we deduct 10 cm from height and recalculate

16
• In case of Gypsum board or gypsum tiles, the height of plaster will reach just 10 cm above
Gypsum height level, not to the ceiling

17
• Every floor finish as per finish schedule to be measured by m2.
• This area for example can be :
• Ceramic/Porcelain
• Stone 2 or 4 cm thickness ( as described )
• Rubber flooring
• Vinyl
• Terrazzo
• Cement tiles
• HPL
• HDF

18
• Every Ceiling finish as per finish schedule to be measured by m2.
• This area for example can be :
• Plaster
• Gypsum board
• Gypsum tiles
• Paint

19
• Skirting as per finish schedule to be measured by m.
• This area for example can be :
• Ceramic
• Vinyl
• Plaster skirting
• Stone

• Skirting length here = 17.9-0.8-0.9-0.9


= 15.3 m

20
21
22
• Stone stairs

23
• Handrail

24
• Handrail

25
• Ladder

26
• Ladder

27
• Insulation
• Cold applied bitumen

28
• Insulation
• Cold applied bitumen

29
• Insulation
• Cold applied bitumen

Shuttering area + top


PC area by M2

Shuttering area + top


RC area by M2

Shuttering area by
Walls M2

30
• Insulation
• Membrane

31
• Insulation
• Membrane
• Vertical

32
• Insulation
• Membrane
• Vertical

33
• Insulation
• Membrane
• Horizontal

34
• Insulation
• Thermal insulation

35
36
37
• Landscape
• Soft scape

38
• Landscape
• Soft scape

39
• Landscape
• Soft scape

40
• Landscape
• Soft scape

41
• Landscape
• Hardscape
• Interlock

42
• Landscape
• Hardscape
• Curb

43
• Curtain Wall

44
• External stone skirting and cladding

45
46
Total
Item Description Qty Unit Rate
(EGP)
SECTION 220523 - VALVES

1 WATER METER

1.1 Supplying and installing water meter inside water meter No. 1 0
cabinet complete with gate valves, check valve, strainer,
pipes, fittings and all accessories (40mm).

Total

47
48
• 40 mm pipe Qty?
• 2 Gate valves
• 1 Strainer
• 1 Check valve
• 1 water meter
• What else???

49
Total
Item Description Qty Unit Rate
(EGP)
SECTION lighting outlets

1 Outlets

1.1 Supplying and installing outlet including conduits, wires , No. 136 0
accessories and outlet frame

Total

50
51

51
 Length of conduit = 24 + 1.5 + 1.5 + 1.5 + 3 = 31.5 m
= in ceiling + point 1 + point 2 down + point 2 up + panel 52
 Length of wire = 31.5* 3 = 94.5 m
53
 Length of conduit = 31.5 m
 Length of wire = 31.5*3 = 94.5 m

 Outlet cost =( length of conduit* conduit cost/m* 1.5”for


accessories” +length of wire*wire cost/m+ workmanship )/3