0% found this document useful (0 votes)
76 views16 pages

Planned Maintenance Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views16 pages

Planned Maintenance Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Carestation 620/650/650c (A1/A2) TRM 2076163-001

Planned Maintenance Checklist


.

Customer Name:
Service Record Number: Serial Number:
Equipment ID: Software Version:
Performed by: Date:

□ 12-month check □ 24-month check □ 48-month check

Parts Replacement
.

Part Number Part Description 12-Month 24-Month 48-Month Replaced Comments


Yes/No
1102-3016-000 Vaporizer port O-rings kit X
2071067-001-S Breathing system check valve kit X
0211-1454-100 Free breathing flapper valve X
1503-3208-000 Free breathing valve O-ring X
1009-5800-000 Display battery X
M1801706-S System batteries X

Visual Inspection Procedures


.

Procedure Expected Results Actual Results Outcome / Comments


Pass-Fail-NA
Check filter in lower rear enclosure Filter is clean
□ Pass

□ Fail
Check condition and tightness of all All parts are in good
displays, frame, drawers, arm, and top condition and tightened □ Pass
shelf parts; Check screws with marks
□ Fail
Check the casters for proper operation Casters roll and lock as
and mounting needed. Casters are □ Pass
firmly mounted to
machine
□ Fail

1
Procedure Expected Results Actual Results Outcome / Comments
Pass-Fail-NA
Check labels All labels are in place and
clearly legible □ Pass

□ Fail
Check external tubing, silicone tubes, No visible deterioration
hoses, and pipeline hoses and securely attached □ Pass

□ Fail
Check external electrical cabling All are correctly
connected and not □ Pass
deteriorated
□ Fail
Verify proper display arm adjustment Display arm
counterbalance, side to □ Pass
side movement, and tilt
are adjusted
□ Fail

Verify Annunciators
.

Procedure Expected Results Actual Results Outcome / Comments


Pass-Fail-NA
Verify audible “beep” after system is An audible “beep” is
turned on heard after system is □ Pass
turned on.
□ Fail
Verify a second audible “beep” A second audible “beep”
is heard. □ Pass

□ Fail
Verify a third and fourth audible “beep” A third and fourth audible
“beep” are heard. □ Pass

□ Fail

Pipeline and cylinder tests


.

Procedure Expected Results Actual Results Outcome / Comments


Pass-Fail-NA
Disconnect the pipeline supplies and All pressure values read
close all cylinder valves zero □ Pass

□ Fail

2 2087476-001 C 05 2015
Procedure Expected Results Actual Results Outcome / Comments
Pass-Fail-NA
Connect pipeline supplies one at a time Corresponding reading
indicates facility pipeline □ Pass
pressure
□ Fail

□ NA
Test O2 cylinder for high pressure Initial reading
leaks After 1 minute
Pressure decay < 690
kPa (100 psi) □ Pass

□ Fail

□ NA
Test N2O cylinder for high pressure Initial reading
leaks After 1 minute
Pressure decay < 690
kPa (100 psi) □ Pass

□ Fail

□ NA
Test Air cylinder for high pressure Initial reading
leaks After 1 minute
Pressure decay < 690
kPa (100 psi) □ Pass

□ Fail

□ NA
Perform the “O2 supply alarm test” Low O2 supply alarm
occurs □ Pass

□ Fail
N2O and O2 flows stop
□ Pass

□ Fail
Air flow continues
□ Pass

□ Fail

□ NA

2087476-001 C 05 2015 3
AGSS Inspection and Testing
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Visual-Mechanical Inspection System in working order
□ Pass

□ Fail
Scavenger Positive Relief The pressure should not
Functional Check indicate a pressure rise of more □ Pass
than 10 cmH2O
□ Fail

□ NA

Breathing system inspection


.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Flow sensors and Sensor System inspected
Interface Board inspection □ Pass

□ Fail
O2 sensor inspection System inspected
□ Pass

□ Fail
Absorber canister inspection System inspected
□ Pass

□ Fail
Bellows assembly inspection Bellows does not fall within one
minute □ Pass

□ Fail
APL valve inspection System inspected
□ Pass

□ Fail
Bag to vent switch inspection System inspected
□ Pass

□ Fail

4 2087476-001 C 05 2015
Ventilator inspection
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Free breathing valve maintenance System inspected; parts
at 24 months replaced □ Pass

□ Fail

□ NA
Exhalation valve inspection Valve inspected; parts replaced
as necessary □ Pass

□ Fail

□ NA

Ventilator Tests
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
View or Copy Logs View or Copy Logs work
normally □ Pass

□ Fail
Flow and Pressure calibration ‘Pass’ is displayed
□ Pass

□ Fail
Weekly O2 Cell calibration ‘Pass’ is displayed
□ Pass

□ Fail

□ NA
Monthly O2 Cell calibration ‘Pass’ is displayed
□ Pass

□ Fail

□ NA
Airway Gas calibration ‘Pass’ is displayed
□ Pass

□ Fail

□ NA

2087476-001 C 05 2015 5
Procedure Expected Results Actual Outcome / Comments
Results Pass-Fail-NA
Manifold P Span calibration ‘Pass’ is displayed
□ Pass

□ Fail
Inspiratory flow valve calibration ‘Pass’ is displayed
□ Pass

□ Fail
Bleed Resistor calibration ‘Pass’ is displayed
□ Pass

□ Fail
Paw Span calibration ‘Pass’ is displayed
□ Pass

□ Fail

□ NA
Paw and ACGO Span calibration ‘Pass’ is displayed
□ Pass

□ Fail

□ NA
Zero Gas Transducers ‘Pass’ is displayed
□ Pass

□ Fail
Mixer Flow Sensor Zero ‘Pass’ is displayed
□ Pass

□ Fail
Zero ACGO / Zero AGSS / Zero ‘Pass’ is displayed
ACGO and AGSS □ Pass

□ Fail

□ NA
Pressure limit circuit test Gas flow stops as airway
pressure reaches □ Pass
approximately 109 cmH2O
□ Fail
MOPV pressure relief valve test Pressure relief weight relieving
and popping off □ Pass

□ Fail

6 2087476-001 C 05 2015
Display Diagnostics
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Test LEDs LEDs flash 5 times
□ Pass

□ Fail
Test speaker Speaker sounds for 2 seconds
□ Pass

□ Fail
Test battery ‘Pass’ is displayed for battery
test □ Pass

□ Fail
Test hard keys Speaker sounds when each
key is pressed □ Pass

□ Fail
Test LCD Display sequences through the
color screens □ Pass

□ Fail
Calibrate touch Touch targets calibrated
□ Pass

□ Fail

Flow control tests


.

Procedure Expected Results Actual Results Outcome / Comments


Pass-Fail-NA
Check the Link proportioning system concentration
Set the N2O flow (l/min) Measured O2
0.2 21% minimum
□ Pass

□ Fail
1.6 21% to 34%
□ Pass

□ Fail
5.0 21% to 34%
□ Pass

□ Fail

2087476-001 C 05 2015 7
Procedure Expected Results Actual Results Outcome / Comments
Pass-Fail-NA
9.0 21% to 34%
□ Pass

□ Fail
Check the proportioning system concentration
Set the O2 flow (l/min) Measured O2
2.5 21% to 34%
□ Pass

□ Fail
1.0 21% to 34%
□ Pass

□ Fail
0.4 21% to 34%
□ Pass

□ Fail
Check the linearity of the Air flow control
Setting Measured O2
O2 set to 4.0 l/min, Air set to 61% to 71%
3.0 l/min □ Pass

□ Fail

□ NA
O2 set to 3.5 l/min, Air set to 45% to 55%
6.0 l/min □ Pass

□ Fail

□ NA
O2 set to 1.5 l/min, Air set to 28% to 38%
8.0 l/min □ Pass

□ Fail

□ NA

Flow sensing test


.

Procedure Expected Results Actual Results Outcome / Comments


Pass-Fail-NA
Perform the flow sensing test
Set Flow on the flow test Flow Sensor Reading
device

8 2087476-001 C 05 2015
Procedure Expected Results Actual Results Outcome / Comments
Pass-Fail-NA
100% O2 at 1.5 l/min Flow sensor reading reads
between 1.3 l/min and 1.7 □ Pass
l/min
□ Fail
100% O2 at 12 l/min Flow sensor reading reads
between 10.8 l/min and 13.2 □ Pass
l/min
□ Fail
100% Air at 1.5 l/min Flow sensor reading reads
between 1.3 l/min and 1.7 □ Pass
l/min
□ Fail
100% Air at 12 l/min Flow sensor reading reads
between 10.8 l/min and 13.2 □ Pass
l/min
□ Fail
100% N2O at 1.2 l/min Flow sensor reading reads
between 1.1 l/min and 1.3 □ Pass
l/min
□ Fail
100% N2O at 10 l/min Flow sensor reading reads
between 9.0 l/min and 11.0 □ Pass
l/min
□ Fail

ACGO pressure relief valve test


.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
ACGO pressure relief valve test Pressure relief weight relieving
and popping off □ Pass

□ Fail

□ NA

2087476-001 C 05 2015 9
Auxiliary O2 flowmeter tests
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Shut off the flow Ball rests at bottom
□ Pass

□ Fail

□ NA
Increase flow Ball rises and maintains steady
as flow increases □ Pass

□ Fail

□ NA
Flowmeter set to 1 l/min Flow tester reads 0.5 to 1.5
l/min □ Pass

□ Fail

□ NA
Flowmeter set to 3 l/min Flow tester reads 2.5 to 3.5
l/min □ Pass

□ Fail

□ NA
Flowmeter set to 5 l/min Flow tester reads 4.5 to 5.5
l/min □ Pass

□ Fail

□ NA
Flowmeter set to 10 l/min Flow tester reads 9.0 to 11.0
l/min □ Pass

□ Fail

□ NA
Flowmeter set to Maximum (fully Flow tester reads >=12.0 l/min
open) □ Pass

□ Fail

□ NA

10 2087476-001 C 05 2015
Integrated suction regulator tests (if equipped)
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Test vacuum gauge accuracy at following points:
Suction regulator in Off position The suction vacuum gauge
needle should come to rest □ Pass
within the zero range bracket
□ Fail

□ NA
Suction vacuum set to 100 mmHg Test gauge reads 62 - 138
(13.3 kPa) mmHg (8.3 - 18.4 kPa) □ Pass

□ Fail

□ NA
Suction vacuum set to 300 mmHg Test gauge reads 262 - 338
(40 kPa) mmHg (35 - 45 kPa) □ Pass

□ Fail

□ NA
Suction vacuum set to 500 mmHg Test gauge reads 462 - 538
(66.7 kPa) mmHg (61.6 - 71.7 kPa) □ Pass

□ Fail

□ NA
Flow test - suction control knob Test flowmeter reads at least
fully clockwise 20 l/min □ Pass

□ Fail

□ NA
Regulation test Vacuum gauge returns to 100
mmHg/13kPa within a tolerance □ Pass
of ± 10 mmHg/1.3 kPa
□ Fail

□ NA
Vacuum bleed test Gauge needle returns to zero
range within 10 seconds □ Pass

□ Fail

□ NA
Vacuum leak test Gauge reading does not
increase when regulator is off □ Pass

□ Fail

□ NA

2087476-001 C 05 2015 11
Flush flow test
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Flush flow test The bellows fills in 1.3 to 3
seconds □ Pass

□ Fail

Vaporizer back pressure and interlock test


.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Vaporizer back pressure test O2 flow does not decrease
more than 1 L/min through the □ Pass
full range
□ Fail
Vaporizer interlock test Can not turn on more than one
vaporizer at the same time □ Pass

□ Fail

12 2087476-001 C 05 2015
Calibrating the airway module
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Perform Airway Module Displayed CO2 value is
calibration calibrated to 5.0% □ Pass

□ Fail

□ NA
Displayed O2 value is
calibrated to 54.5% □ Pass

□ Fail

□ NA
Displayed N2O value is
calibrated to 36.0% □ Pass

□ Fail

□ NA
Displayed AA/DES value is
calibrated to 2.0% □ Pass

□ Fail

□ NA

System checkout
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Full Test Full Test passes
□ Pass

□ Fail
Low pressure leak test Bulb inflation time greater than
30 seconds □ Pass

□ Fail

2087476-001 C 05 2015 13
Alarm tests
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Perform Alarm tests ‘FiO2 Low’ alarm occurs
□ Pass

□ Fail
‘FiO2 High’ alarm occurs
□ Pass

□ Fail
‘MVexp low’ alarm occurs
□ Pass

□ Fail
‘Ppeak high’ alarm occurs
□ Pass

□ Fail
‘PEEP high. Blockage?’ alarm
occurs □ Pass

□ Fail
‘Ppeak low. Leak?’ alarm
occurs □ Pass

□ Fail

Power failure test


.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
With power cord connected to The mains indicator comes on
mains outlet □ Pass

□ Fail
With system turned on, start case: The power failure alarm comes
unplug power cord on □ Pass

□ Fail
Plug in power cord Alarm cancels
□ Pass

□ Fail

14 2087476-001 C 05 2015
Electrical safety checks
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Measure the ground resistance Less than or qual to 0.20 Ω
□ Pass

□ Fail
Measure the leakage current 100/120 Vac: <300 μAmps
□ Pass

□ Fail

□ NA
220/240 Vac: <500 μAmps
□ Pass

□ Fail

□ NA

2087476-001 C 05 2015 15
Final machine checks
.

Procedure Expected Results Actual Outcome / Comments


Results Pass-Fail-NA
Verify the following: Pipeline hoses connected
□ Pass

□ Fail
Work lights operate correctly
□ Pass

□ Fail
All vaporizers are off
□ Pass

□ Fail
Panels and tray tops are
attached □ Pass

□ Fail
Cylinders off
□ Pass

□ Fail
AC mains connected
□ Pass

□ Fail

16 2087476-001 C 05 2015