0% found this document useful (0 votes)
74 views30 pages

GH PH1-PRESENTATION DECK KIOSKS - Rev1

Uploaded by

Mikee Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views30 pages

GH PH1-PRESENTATION DECK KIOSKS - Rev1

Uploaded by

Mikee Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

GH MALL Pre-Construction Meeting

Phase 1 – Mall and Office

Integrated
Regional Mall

Ultimate
Shopping District

• Diverse Shopping
+ 64K sqm Mall GLA Experience
+ 40K sqm Office GLA
• 3 Cinemas • Flagship Stores
• Hybrid – Traditional /
• 334 new tenants • Select Dining Options
BPO)
• 840 parking slots • Family Entertainment
• Connection with Mckinley • Enhanced Customer
Building – 1194 slots Experience
Phase 1 – Mall and Office

7th TO 21st FLOOR


OFFICE SPACE

LGF TO 6th FLOOR


MALL

BASEMENT
3 LEVELS PARKING

OFFICE SPACE

Floor Category
6F Premium Dining
5F Leisure Entertainment, Kids & Wellness
4F Digital & Lifestyle Hub
3F Active Lifestyle and Sports Zone
2F Fashion and Lifestyle
GF Affordable Luxury
LGF Daily Essentials COMMERCIAL

BASEMENT PARKING
TENANT MILESTONE

1. Acceptance of Lease Proposal & Award Notice


2. Payment of Security Deposit & Construction Bond
3. Pre-Construction Meeting
• Attendance Sheet
• Tenant's Authorized Signatories and Contact Numbers Form
• Greenhills Tenant Kit
• POS Requirements
4. Submission of Plans
• Concept Plans including board perspective with materials specification
- A3 Size only (concept Plans) - 3 sets
• Final Plans
- 20” x 30” Blueprint signed & sealed (Final Plans) – 4 sets
2. Payment of Security Deposit & Construction Bond

• Payment must be made within 7 CONTRACT


TRADE NAME days upon issuance of the initial NUMBER
SOA to avoid interest charges
• Present proof of payment to TRO
• Billing & Collection
Turn-over of Space
Ms. Ivy Bayrante
• Marked area. Coordinate with respective [email protected]
Mall Officer for site ocular. 0917-810-1963
CONSTRUCTION BOARD UP SAMPLE
Board-up Guidelines
➢ During the fit-out
• Include mall logo
• E-mail layout to Mall Officer for approval
• Tarpaulin must cover the entire board-up.
Artwork with emphasis with the storefront
• Must be installed 3 days prior to mobilization
• Lock must be installed to secure premises.
Proposed Storefront Perspective

• Colored perspective in A3 size *must be fully rendered


interior & exterior perspectives and signed by the
owner and designer
• Refer to the Design Guidelines for kiosks
Submission of 4 sets of Blueprint
➢ Architectural Plans including fully rendered
perspective, section views – complete
dimensions and material specifications as per
Design Guidelines
➢ Electrical Plan with complete general notes and
load schedule, conduit specifications, and
circuit diagram.

✓ 2 copies for Renovation Permit for LGU (see


next slide)
✓ 2 copies for Construction use
✓ Indicate the specification of materials used
✓ Must contain a legend of symbols
✓ All plans should be signed and sealed by
respective owners and duly- licensed
Architects/ Engineers
Building and other Municipal Permit (Repair Permit)
Requirements:
✓ 1 set each OCC stamped
blueprint sheet for
Architectural and
Electrical – “For Building
Permit Use Only” – with
reflected comments from
initial Mall approved A3
Plans.
✓ Duly accomplished
application forms, as
applicable.
▪ Unified Application Form
for Building Permit
▪ Electrical Permit
▪ Sanitary/ plumbing
Permit form
▪ Signage Permit
https://www.sanjuancity.gov.ph/SanJuanCity/Makabagong_SJ_DLForms ▪ Locational clearance
TENANT MILESTONE
5. Submission of Conditional Notice to Proceed Requirements
• Photocopy of payment of Security Deposit
• Photocopy of payment of Construction Cash Bond
• Submission of Contractor All Risk Insurance (CARI)
• Approved plans for construction
• Endorsement letter from Tenant (Contractor)
6. Issuance of (Conditional) Notice to Proceed
7. Start of Fit out/ Mobilization
• Work Permit, Gate Pass
• Construction House Rules
8. Tenant Fit-out Inspection
• Ensure to conduct utility test (Megger test, Gravity/flow test, Hydro test, Flood test, etc..) witnessed by
maintenance
• Final Inspection: Notify Admin if space is ready for inspection
9. Submission of Permit to Operate Requirements
10. Issuance of (Conditional) Permit to Operate
13. Store Opening
• Tenant staff orientation
• Issuance of Mall ID
Contractor’s All Risk Insurance

he Bank

✓ Minimum Php 500,000.00 insurance coverage


✓ Present proof of payment
✓ Insurance Policy
Mall utility tapping

• Submit calibration certificate of electric & water meter.


• Utility consumption during the fit-out will be charged on
the first SOA
• Utility tapping permit shall be provided. Meter details.
• Megger test shall be done c/o Tenant contractor upon
ingress on or before tapping to mall supply; witnessed by
Mall Maintenance.
Work Permit, Gate pass, Hot work permit etc.

OCC Administration
• Must be submitted in 3 copies
• Submit to admin at least 3 days before the scheduled
works
• Working for 24 hrs. is allowed; stay in of workers is not
allowed
• Daily cut-off is 3:00 pm; release of approved permit
6:00 pm within 2-3 days after filing.
• Work permit is valid for 7 days
• Gate pass is valid for 3 days. Delivery of construction
materials shall only be allowed 11pm-8am only –
through Service Elevators.
• Hot work permit is valid for 1 day only
CONSTRUCTION GUIDELINES
1. Endorsement letter from Tenant
2. List of Tenant Workers
3. Location of Delivery of Construction Materials (Gate 5, Basement 1 or 2).
• Tenant workers access (FE 2 – Beside Unimart Tunnel)
4. Location of Tenant Merchandise: Food/Non-food (Gate 5, Basement 1)
• Tenant employee access (GH Mall G/F – beside Levi’s)
5. Garbage/ debris disposal must be done by tenant daily or weekly.
6. A fine of Php 20,000.00 shall be imposed to workers caught smoking inside the leased
space.

Note: Please refer to these delivery hours

6:00am – 3:00pm (Food, Perishable items, and Medical Supplies)


6:00am – 12:00pm (Non-food and any other store equipment)
11:00pm – 8:00am of the next day (Construction materials and equipment)
MANDATORY ORIENTATIONS
1. Tenant Workers Orientation
• Every Monday: 9:00am – 10:00am in Connecticut Arcade G/F: AKK Space

2. Tenant Employee Orientation (for Issuance of MALL ID)


• Every Wednesday: 9:00am – 10:00am in Connecticut Arcade G/F: AKK Space
• Get Mall Tenant ID Application at Admin Office 2/F Centermall
• Php 150.00 per Employee; 2-3 working days processing after payment.
2. Stamped and Approved Plans for construction OCC and

3. 1 unit 10-lb Fire Extinguisher

4. First Aid Kit

5. Calibrated electric and water meter: signed by Mall maintenance.


Utility Tapping Permit must be present on-site at all times.
GH MALL OPERATIONS

PANELBOARD COVER MUST HAVE CIRCUIT


NUMBER W/ DIRECTORY INDICATED ON
DEADFRONT COVER.

KIOSK SIGNAGES MUST HAVE TIMER SWITCH.

WITH LOCKNUT & BUSHING LINED


WITH MICA TUBE

• Tenant shall send electrical plan


with power riser diagram, load
schedule and computation – for
Approval.
• Submeter care of tenant. Provide
calibration certificate upon
purchase.
• Use IMC/Liquid-tight FMC only.
Use RSC or IMC conduit for current carrying wires (No EMT)
Fit-out Inspections:
Final inspection: before store opening, preferably 5 days before

Pre-opening Requirements: