Proposed by
Tvl. Gem Granites,
FORM I
(I) BASIC INFORMATION
S.No Item Details
1 Name of the project/s Karandapalli Black Granite Quarry project
2 S. No. in the schedule 1(a)
3 Proposed capacity/area/length/tonnage The proposed quantity is about 1202m3 of Black Granite
to be handled/command area/lease for during this scheme period.
area/number of wells to be drilled Area = 4.80.0 Ha.
It is New proposal Black Granite Quarry Project (the area
4 New/ Expansion/ Modernization has been quarrying operation earlier) in Karandapalli
Village.
Existing capacity/Area etc. The proposed quantity (5%) is about 1202m3 (or) 212
Lorry Loads of Black Granite for a during this scheme
period of four years.
Per year for lorry loads = 212 lorry loads/4 years =53 lorry
loads per years.
Total number of effective working days = 280days per
year
Per months for lorry loads = 53 lorry loads /12 months
(280days)= Maximum 4 lorry loads per months
The applicant proposed Black Granite up to a depth of
18m (13m above ground level + 5m below ground level)
5 during remaining scheme period of four years.
waste
Reserves Top soil
Description ROM 95%
5%(m3) m3
(m3) (m3)
Geological
847013 42351 804662 158960
reserves
Mineable
281754 14088 267666 107795
Reserves
Remaining
four years
24040 1202 22838 26230
Scheme of
mining plan
6 Category of project i.e. `A’ or ‘B’ Category - B2
Does it attract the general condition? If
7.5m and 10m safety distance maintained from the all
7
yes, please specify. along the boundary barrier.
Does it attract the specify condition? If
The project does not attract the any specify condition in
8
yes, please specify. the lease area.
Location Topo sheet No: 57 -H/11
9 Latitude: 12°28’29’’N to 12°28’34’’N
Longitude: 77°42’38’’ E to 77°42’56’’E
Plot/ Survey/ Khasra No. 139/5 (Part)
Village Karandapalli
Taluk Denkanikottai
District Krishnagiri
State Tamilnadu
Nearest railway station/ airport along Hosur Railway station - 40km – NE
10
with distance in kms Bangalore Airport - 100km - N
Nearest Town, city, District Town – Denkanikottai - 12km- NE
11 Headquarters along with distance in Nearest City – Krishnagiri - 55km - NE
kms District – Krishnagiri - 55km - NE
Village Panchayats, ZilaParishad, Village - Karandapalli
Municipal Corporation, Local body Panchyat Union - Denkanikottai
12
(complete postal addresses with Taluk - Denkanikottai
telephone nos. to be given) District - Krishnagiri
Name of the applicant Tvl. Gem Granites,
13
S.R. Asaithambi, (Partner)
Tvl. Gem Granites,
14 Registered Address 58, Cathedral Road,
Chennai.
Address for correspondence:
Name Tvl. Gem Granites,
Designation (Owner/Partner/CEO) Partner
Address Tvl. Gem Granites,
58, Cathedral Road,
15 Chennai.
Pin Code 600086
E-mail [email protected]
Telephone No. 8012588827
Fax No. -
Details of Alternative Sites examined, There is no alternative sites are examined. The project is
16 if any. Location of these sites should site specific.
be shown on a Topo sheet.
17 Interlinked Projects There is no interlinked project.
Whether separate application of This project is site specific to win the Black Granite blocks
18 interlinked project has been from the parent sheet mass; hence separate application for
submitted? interlinked project has not submitted.
This project is site specific to win the Black Granite blocks
19 If yes, date of submission from the parent sheet mass; hence separate application for
interlinked project has not submitted.
This site specific project involves Black Granite Quarry
20 If no, reason
only.
Whether the proposal involves
approval/ clearance under: if yes, (a) The project does not attract the Forest
details of the same and their status to (Conservation) Act 1980.
be given.
(a) The Forest (Conservation) Act, (b) There is no wild life in the project site area under
21
1980? the Wildlife (protection) Act 1972.
(b) The Wildlife (Protection) Act,
1972? (c) The project area does not fall the C.R.Z
(c) The C. R. Z. Notification, 1991? Notification, 1991.
The Mining lease was granted in G.O. (3D) No: 50,
Industries (E-2) Department Dated: 30.04.1998.
Whether there is any Government
22 Order/ Policy relevant/ relating to the The Mining Plan was Approved by the Commissioner of
site? Geology and Mining, Chennai vide Letter No:
19749/MM2/2002 Dated: 30.12.2002 (Enclosed as
Annexure – I).
23 Forest land involved (hectares) There is no forest land involved in the lease area.
Whether there is any litigation pending
against the project and/ or land in
which the project is propose to be set
up?
(a) Name of the Court There is no court case pending, litigations relating to the
24
(b) Case No. project directly and indirectly.
(c) Orders/ directions of the Court, if
any and its relevance with the
proposed project.
(II) Activity
1. Construction operation or decommissioning of the project involving actions, which will cause
physical changes in the locality (topography, land use changes in water bodies, etc.)
Information/Checklist Yes/ Details thereof (with approximate quantities/rates,
S. No
confirmation No wherever possible) with sources of information data
The topography will be changed after the
quarrying of Black Granite as per the Mining plan,
Open cast Semi Mechanized Mining with 5.0
meter vertical bench with a bench width of 5.0 meter is
being proposed.
Topography will change in respect to overburden
excavation. However, measures will be implemented
as per mining Plan. As the area of the quarry remains
the same, there will not be any increase in intensity of
local land use. After the end of the life of the quarry
Permanent or temporary change the waste material will be backfilled in the mined work
in land use, land cover or out area.
1.1 topography including increase in Yes Area to be Area to be
intensity of land use (with Present Required at required at
respect to local land use plan) Description Area the present the End of
(Ha.) scheme the lease
period(Ha) period(ha)
Area under
1.44.5 0.57.6 2.02.1
quarry
Waste dump Nil 0.13.0 0.13.0
Infrastructure Nil 0.01.0 0.01.0
Roads 0.01.0 0.01.0 0.02.0
Green Belt Nil 0.10.0 0.10.0
Stocking Blocks 3.34.5 2.51.9 2.51.9
Grand Total 4.80.0 3.34.5 4.80.0
Clearance of existing land, There is no vegetation and building in this project
1.2 vegetation and building? No lease area.
The total quarrying activity is proposed to carry out
within the quarry lease applied area. Hence, there is no
proposal for creating of new land uses. Temporary
approach road within the area will be form for the easy
1.3 Creation of new land uses? No access of men and machinery which will be well
maintained.
The Trailers/ trucks will transport the Black Granite to
the needy customer by existing road.
The fresh Black Granite is clearly visible, hence pre-
Pre-construction investigations construction investigation and soil testing is not
1.4 No
e.g. bore houses, soil testing?
proposed before quarrying operation.
There will be no major civil works, Other than the
following: Office building, storeroom, toilet and first
1.5 Construction works? No aid room which will be provided as permanent
structures within the quarry lease applied area, after
the grant of quarry lease.
There are no existing building within the lease applied
1.6 Demolition works? No
area hence no demolition work is involved.
Underground works including Open cast semi mechanized quarrying will be adopted.
1.9 No
mining or tunneling? No underground mining or tunneling is proposed.
New road, rail, air waterborne or There is no such type of activities involved in this
other transport infrastructure project.
1.18 No
including new or altered routes Existing road will be utilized for the transportation of
and stations, ports, airports etc.? Granite to the needy customer.
1.22 Stream crossings? No There is no Stream crossing in the lease applied area.
The proposed quarrying does not require any
Abstraction or transfers of water abstraction or transfer of water from the Ground or
1.23 No
from ground or surface waters? surface water bodies.
The quarry operation is restricted up to a depth of 18m
for during this scheme period. Quarry operation will
not affect the drainage pattern of the lease applied
Changes in water bodies or the area. There is no change in water bodies or the land
1.24 land surface affecting drainage No surface affected during run off. The seepage water
or run-off? during rainy season will be drained by 5HP Pumps and
will be used for green belt development and dust
suppression on haul roads.
7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface water, ground water, coastal water or the sea:
Details thereof (with approximate
Yes/
S. No Information/Checklist confirmation quantities/rates, wherever possible) with
No
sources of information data
No hazardous materials will be used in the
process.
From handling, Storage, use or Oiling and lubrication of hauling vehicles will be
7.1 No
spillage of hazardous materials done by using oil tray to prevent spillage of oil.
Vehicles and machinery will be well maintained to
prevent leakage of oil.
The discharge of sewage will be
Septic tank will be cleaned periodically and the
collected on soap pits will be
7.2 No sludge generated will be used as manure in the
discharge to a place authorized by
green belt.
municipal authorizes as per guidelines
There is likely hood of increase of Particulate
By deposition of pollutants emitted to No Matter due to quarrying operations. Regular
7.3 sprinkling of water will suppress dust at
air into the land or into water
points/places of generation.
An efficient and effective management plan is
proposed for the project; hence it may not have
7.4 From any other sources No
any significant impact on the surrounding
environment.
Is there a risk of long term buildup of
7.5 pollutants in the environment from No No such type of activities is not involved in this
these sources? quarry operation
8. Risk of accidents during construction or operation of the project, which could affect human
health or the environment
Details thereof (with approximate
Information/Checklist Yes/
S. No quantities/rates, wherever possible) with
confirmation No
sources of information data
The blasting and drillings are involved in the
project for liberation and splitting of Granite.
Diamond wire saw cutting is mostly practiced to
From explosions, spillages, fires etc., liberate the Dimensional Granite block from the
8.1 form storage, handling, use or No
parent sheet. The minimum explosive materials
production of hazardous substances
will be brought from explosive vendors during
blasting. The blasting will be carried out under the
supervision of experienced blaster.
The risks of accidents are envisaged in quarry
operations, failure of quarry pit slopes, excavators,
truck movement, etc. However, all safety measures
shall be taken to prevent any accidents. The
quarrying activities will be monitored under the
8.2 From any other causes Yes supervision of experienced and qualified
competent Mines foreman. The mine foreman
will be in-charge of first aid. The quarrying
operation is carried out only in the stabilized
strata.
There is no earthquake, floods, Landslides, cloud
burst recorded or anticipated in the lease applied
Could the project be affected by
natural disasters causing area.
8.3 environmental damage (e.g. floods, No It’s an opencast quarrying, hence this project
earthquakes, landslides, cloudburst could not affect severely due to the natural
etc.)? disasters. The quarry operation is proposed to
carry out in the stable strata.
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects to environmental effects or the potential for cumulative impacts with other
existing or planned activities in the locality
Details thereof (with approximate
Yes/
S. No Information/Checklist confirmation quantities/rates, wherever possible) with
No
sources of information data
Date: 04.12.2015
Place: Krishnagiri
S.R. Asaithambi
(Partner)
No: 58, Cathedral Road,
Chennai -86.
Mobile No: 8012588827