Supply Chain Optimization Project

Project Charter― ERP System Upgrade

Uploaded by

Alex
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

1

Project Charter― ERP System Upgrade

Your Name

School

Class ID & Name

Professor

Date
2

Project Charter― ERP System Upgrade

1.0.Problem Statement

The organization's current ERP system is outdated and inefficient, leading to significant

operational challenges. These challenges manifest as bottlenecks that hinder productivity, resulting

in increased costs, reduced employee morale, and diminished customer satisfaction. Data

inaccuracies and limited visibility into supply chain processes further exacerbate these issues,

preventing the organization from effectively responding to market demands.

1.1. Project Summary/Purpose

To address these problems, the project aims to implement a modern ERP system that

enhances supply chain visibility and improves operational efficiency. This upgrade will facilitate

better data integration and streamline business processes, enabling strategic decision-making. By

leveraging advanced technology, the organization seeks to enhance overall operational efficiency,

aligning with its strategic objectives and ensuring sustainable growth in an increasingly

competitive environment. The successful implementation of this project is crucial for maintaining

competitiveness and fostering a responsive business environment.

1.2. Project Goals

The primary goals of this project include:

i). Improve Operational Efficiency: Achieve a 30% increase in operational efficiency by

optimizing workflows and reducing redundancies.

ii). Reduce Data Errors: Lower data entry errors by 50% through improved data validation and

integration processes.

1.3. Project Objectives

To meet the project goals, the following objectives have been established:
3

i). Complete Upgrade: Successfully complete the ERP upgrade within a six-month timeframe.

ii). Staff Training: Ensure that 100% of staff are trained on the new features and functionalities

of the upgraded system.

1.4. Expected Deliverables

The project will deliver two important accomplishments.

i). An updated ERP system that meets the defined specifications.

ii). Comprehensive training materials and user manuals to facilitate user adoption and

proficiency.

1.5. Project Scope

The project scope encompasses:

Included

i). System Upgrade― Implementation of the new ERP software.

ii). User Training― Training sessions for all staff to familiarize them with the new system.

iii). Data Migration― Transition of existing data to the new ERP system, ensuring data

integrity and accessibility.

Not Included

The following items are outside the project scope:

i). Hardware Upgrades― Any necessary upgrades to physical hardware will not be included

in this project.

ii). Third-Party Software Integration: Integration with external software systems is not part of

this project.

1.6. Milestones
4

Key milestones for the project include:

i). Project Kickoff: Initiating the project with all stakeholders.

ii). Completion of Data Migration: Successful transfer of data to the new system.

iii). User Training Sessions: Conducting training for all users on the new ERP features.

1.7. Project Cost Estimate

The estimated budget for the project is $200,000, broken down as follows:

Software Licenses for the new ERP software $100,000

Training sessions and materials. $50,000

External consulting services to assist with the upgrade process $50,000

1.8. Project Dependencies

According to Netinant et al. (2023), a critical dependency for the project is the completion

of data migration before user training can commence. This ensures that training is based on the

most current and accurate data, which is vital for effective learning and system utilization. If the

data is not migrated properly, users may be trained on outdated or incorrect information, leading

to errors and inefficiencies in the future (Netinant et al., 2023). Therefore, aligning the migration

timeline with the training schedule is essential to ensure that all training materials reflect the latest

data configurations and system functionalities.

1.9. Project Risks

Potential risk associated with the project is data loss during migration. There is a risk of

losing data during the migration process. To mitigate this, comprehensive data backups will be

performed prior to migration. This step is crucial to safeguard against unexpected failures or issues

that may arise during the transfer, ensuring that a reliable copy of the data is available for recovery
5

(FasterCapital, 2024). Additionally, thorough testing and validation processes will be implemented

post-migration to confirm data integrity and functionality in the new environment.

1.10. Assumptions

The project assumes that stakeholder engagement will remain consistent throughout the

project lifecycle, facilitating timely decision-making and support. Continuous communication

with stakeholders is imperative to address concerns and gather feedback, which can significantly

influence the project's success. Regular updates and collaborative discussions will help maintain

alignment on objectives and expectations, ultimately contributing to a smoother migration process

and effective user adoption of the new system.

1.11. Constraints

The project faces constraints related to limited budget and tight timeline.

i). Limited Budget― The budget is capped at $200,000, necessitating careful resource

allocation.

ii). Tight Timeline― The six-month completion timeline requires efficient planning and

execution.

1.12. Key Stakeholders

Key stakeholders involved in the project include:

i). Project Manager― Responsible for overall project oversight and coordination.

ii). IT Team― Tasked with the technical aspects of the upgrade and data migration.

iii). Department Heads― Provide input on departmental needs and ensure staff participation in

training.

iv). Executive management

v). IT department
6

vi). Supply chain department

vii). Finance department

viii). End-users

1.13. Communication Plan

To maintain effective communication throughout the project, the following plan will be

implemented:

i). Weekly Updates. Project status updates will be communicated via email to all stakeholders.

ii). Bi-Weekly Meetings. Regular meetings will be held to discuss progress, address concerns,

and adjust plans as necessary.

iii). Regular project status updates

iv). Stakeholder meetings

v). Project website or portal

vi). Email communication

1.14. Resource Allocation

Resources will be allocated as follows:

i). IT Staff― Assigned to handle technical tasks related to the upgrade and data migration.

ii). External Consultants―Engaged to provide training and expertise during the

implementation phase.
7

1.15. Work Breakdown Structure (WBS)

The project will be divided into four main phases:

1. Planning: Define project scope, objectives, and requirements.

2. Execution: Implement the ERP upgrade and migrate data.

3. Training: Conduct training sessions for staff on the new system.

4. Closure: Finalize project deliverables and conduct a post-project review.

Schedule

1.16. Duration and Cost

Each phase of the project is estimated to last 1.5 months, with a budget allocation of

$50,000 per phase. This structured approach allows for systematic progress tracking and resource

management.

1.17. Budget

The budget breakdown is as follows:

Software Licenses for the new ERP software $100,000

Training sessions and materials. $50,000

External consulting services to assist with the upgrade process $50,000

1.18. Monitoring and Controlling

To ensure the project stays on track, the following methods will be employed:

i). Gantt Chart: A Gantt chart will be used to visualize project timelines and dependencies.

ii). Key Performance Indicators (KPIs): KPIs will be established to measure operational

efficiency and data accuracy post-implementation.

1.19. Project Closure


8

At the conclusion of the project, several important steps will be undertaken to ensure a smooth

transition and continuous improvement:

Handover Deliverables

All project deliverables will be formally handed over to the organization. This includes the

updated ERP system, which will be thoroughly tested and validated, as well as comprehensive

training materials designed to equip staff with the necessary skills to utilize the new system

effectively. This handover process is crucial for ensuring that the organization can seamlessly

integrate the new tools into its operations.

Post-Project Review

Following the handover, a detailed post-project review will be conducted. This review will

evaluate the project outcomes against the original objectives, allowing the team to assess what was

achieved and where improvements can be made. It will also focus on identifying lessons learned

throughout the project, which will be invaluable for enhancing processes in future projects.

This structured approach to the ERP upgrade project not only ensures that all aspects are

carefully planned and executed but also maximizes the potential for success. By delivering

significant operational improvements, the organization will be better positioned to achieve its

strategic goals.
9

References

FasterCapital. (2024, 15). Data migration: Safeguarding data during migration: Preventing

loss. https://fastercapital.com/content/Data-Migration--Safeguarding-Data-during-

Migration--Preventing-Loss.html

Netinant, P., Saengsuwan, N., Rukhiran, M., & Pukdesree, S. (2023). Enhancing data

management strategies with a hybrid layering framework in assessing data validation

and high availability sustainability. Sustainability, 15(20),

15034. https://doi.org/10.3390/su152015034