You are on page 1/ 2

Netuork dioga

ANs) 3(2)

Cnhcal path : 35
Total duvahom n days
2() Duroton dsect
durect cat indixoct cot lotallot
Booori2h eio 6200
|2 80000 362o

Totglcost 8oo0o
Cost slope qNen Jndivot caut 2000/weck day
Denalty = (Oolday above lo days
slopa(costroduchon
the actwh with the least cost
Crachig
in cnhical pathie 3-5 at e 5o/dlag by 2 days
pe day

total cot
Durahon diroct cot indiroct cojt

ooo0+2s0 (3000x) + o
30000
8000

Cnhead þath
pat (3-5
302)
Total oluvaton (0 day
44)
2)
6cu)
Crahing (-3 by 2 day as it is the only chuh
in Cnhtal path that can be crashed

Duraton drect cost indirect cot totlcot


SoL00t 2x (0 3000x8 l0430o
2400o

Cnhca path -3-s


6[4) Totl durahon olay
(-4S
(2) Cnhcd path l-3S,
43 lotal dovghon

20)

the to tel
furthe crahina cill not veduce
durahon

Ophimm duvahon t day


\200o cost= (o4300
Opimum
Total coit

(oBoo0+
(060o
iO4000

doehon

Q0000

DC
t0000

60 000

40000
IC
3Oo

20000 clurahon (day)


(2