150 TO 200 BEDED - GROUND FLOOR ROOF BEAM SHUTTERING PLAN, SLAB & BEAM DESIGN - 23-08-2023-Model
150 TO 200 BEDED - GROUND FLOOR ROOF BEAM SHUTTERING PLAN, SLAB & BEAM DESIGN - 23-08-2023-Model
GENERAL NOTES:-
1. ALL DIMENSION AND LEVEL ARE IN MM & M.
2. DO NOT SCALE THIS DRAWING FOLLOW
WRITTEN DIMENSION ONLY.
3. THIS DRAWING SHOULD BE READ IN
CONJUNCTION WITH RELEVANT
ARCHITECTURAL AND SERVICE DRAWING ANY
DISCREPANCY SHOULD BE IMMEDIATELY
BROUGHT TO NOTICE.
4. ONLY LOAD BEARING WALLS ARE SHOWN IN
PLAN OTHERWISE WALLS SHALL BE STOPPED
1/2" BELOW SOFFIT OF BEAM/SLAB AND GAP
FILLED WITH LEAN CEMENT MORTAR UNLESS
OTHERWISE SHOWN IN ARCHITECTURAL
DRAWING.
S-8
REINFORCEMENT DETAILS
C-7 1. HIGH YIELD STRENGTH DEFORMED BARS
S-2
S-5 S-5 C/C UNLESS OTHERWISE MENTIONED.
S-5
5. LAP LENGTH FOR HIGH YIELD STRENGTH
S-5
S-2 DEFORMED
BARS SHALL BE AS FOLLOW.
C-22
S-5 S-5
M-20
M-30
S-5
S-5
S-5
CONCRETE DETAILS
S-9 S-5
4.43
S-4 S-6
SLAB 3/4"(20MM.) 2/3"(15MM.)
S-3 S-3 S-3 S-3 S-3
S-5
S-5
1 1/2"(40MM.)
S-5 S-5 S-5 S-5 S-5 S-5 S-5
S-5 S-5
RETAINING WALL 1"(25MM.) (EARTH SIDE)
3/4"(20MM.) (IN SIDE)
S-2
COLUMNS 1 1/2"(40MM.)
S-6 S-6 S-9 S-6
S-5 S-2
1"(25MM.) ON
C-7
WATER FACE 1
WALLS,FLOOR 1/2"(40MM.)
LB-1(230X600)
S-2
S-9
SLAB & ROOF 1 1/2"(40MM.) (ON
S-1 S-5 S-6
SLAB OF ERTH SIDE)
WATER TANK. WHERE
C-7
APPLICABLE
S-11 S-10 S-10
S-11 S-1
S-4
S-6
S-6 NOTE:- THE STRUCTURAL DESIGN FOR (G+3)
S-2 S-4 S-6
NOTE:- THE GRADE OF CONC. M-25
S-10
S-4 S-4
S-4 S-4 S-4 S-4 S-2
S-4 S-4 S-4
S-10 S-10 S-10 S-2
NOTE:- THE GRADE OF STEEL FE550
S-7 S-7
NOTE:- SBC 100
C-6
SBC REPORT.
CLIENT DETAILS:
S-5
S-4 S-5 S-4 S-5 S-5 S-10
S-4
S-2 S-10 S-11 S-10
S-11 S-11 S-11
S-7 S-7
C-7 C-7
MEDICAL & HEALTH, RAJASTHAN
C-15
S-2
S-2
S-10 S-10
S-10 S-10 S-10 S-10
S-10
S-7
S-4 S-4
S-4 S-9
S-4 B-153(230X450) S-2
PROJECTS:
S-10 S-10
S-10 S-10 S-10 S-10
S-2
S-4 S-5
S-2
S-9 S-5
S-4
C-8
LB-1(230X600)
S-10
CONSTRUCTION WORK 150 BEDDED
S-10 S-10 S-10
S-10
S-1
S-10 S-10
NEW DISTRICT HOSPITAL AT GANGAPUR
CITY, DISTRICT- SAWAI MADHOPUR
S-6 S-6 S-2
B-153(230X450) S-2
S-10
S-4 S-4 S-10 S-10 S-10 S-10
S-9 S-10 S-10
S-4
S-4
C-6
S-2
S-2
S-10 S-10
NO. DATE REVISIONS
DRG. NO:
C-7 SHOBHIT SONI
(STRUCTURAL ENGINEER) HOS/GAN/STR/009
DRAWN BY:
C-7
Er. RAJENDRA SAINI
PROJECT CONSULTANT:
S-6
Drawing Title: