1. The taped distance of a line is [(Bday “Day”+2.25(Bday
Month)) x 123.325] m using a 30 m steel tape weighing 2.4
kg with a cross sectional area of 0.036 cm2 at 34°C with a
pull of 10 N is applied, supported at 20 m intervals
during the measurement. The angle of the tape during
measurement is 11°20′30”. The tape is exactly 50 m at a
temperature of 28°C at a standard pull of 6 N, find the
following:
Formula: 𝐶𝑡 =𝐾𝐿(𝑇−𝑇𝑠)
Solution:
𝐶𝑡=0.0000116(30) (34−28)
𝑪𝒕=+𝟎.𝟎𝟎2088 𝑚
• For the total correction due to change in temperature:
Solution:
Lm= (11 + 2.25(12) x 123.325)
Lm= 3340.775m
Formula:
𝐶𝑡𝑡 = 𝐶𝑡 (𝐿𝑚𝐿)
Solution :
3340.775
𝐶𝑡𝑡 = (0.002088)( )
30
𝐶𝑡𝑡 = +0.232m
For the total correction per tape length: due to sag
Formula:
3
−𝑤 2 𝑙
𝑪𝒔𝟏 = 24𝑃3
Given:
2.4
w =( 30 ) = 0.08 Kg/m
L = 20m
P = 10 N
Solution:
3
− 0.08𝑥9.81 2 (20)
𝑪𝒔𝟏 =
24(10)3
𝑪𝒔𝟏 = −𝟎. 𝟐𝟎𝟓m
For the total correction per tape length: due to sag
Formula:
3
−𝑤 2 𝑙
𝑪𝒔𝟏 = 24𝑃3
Given:
2.4
w =( 30 ) = 0.08 Kg/m
L = 15m
P = 10 N
Solution:
3
− 0.08𝑥9.81 2 (15)
𝑪𝒔𝟏 =
24(10)3
𝑪𝒔𝟏 = −𝟎. 𝟐𝟎𝟓m
For the total correction per tape length: due to sag
Formula:
3
−𝑤 2 𝑙
𝑪𝒔2 = 24𝑃3
Given:
2.4
w =( 30 ) = 0.08 Kg/m
L = 15m
P = 10 N
Solution:
3
− 0.08𝑥9.81 2 (15)
𝑪𝒔2 =
24(10)3
𝑪𝒔2 = −𝟎. 087m
For the total correction per tape length: due to sag
Formula:
𝐶𝑠𝑡 = (42) 𝐶𝑠1 + 𝐶𝑠2
Solution:
𝐶𝑠𝑡 = (42) (−𝟎. 𝟐𝟎𝟓) + (−𝟎. 087)
𝐶𝑠𝑡 = -8.697 m
For the error of the tape due to tension
Formula
𝑃 − 𝑃𝑠 𝐿
𝐶𝑝 =
𝐴𝐸
Given:
P = 10 N Ps = 6N
L = 30 m
A = 0.036 cm2
E = 2.1 𝑥 106
Solution:
10 − 6 (30)
𝐶𝑝 =
(0.036)(2.1 𝑥 106)
𝑪𝒑 = −𝟐. 𝟐𝟒 𝒙 𝟏𝟎−𝟔
Combined correction of the tape:
𝐶 = ±𝐶𝑡𝑡 + 𝐶𝑝 − 𝐶𝑠𝑡
Given:
𝐶𝑡𝑡 = +0.595m
𝐶𝑠𝑡 = −8.705𝑚
𝐶𝑝 = −2.24 𝑥 10−6m
Solution:
𝐶 = 0.232m + (−2.24 𝑥 10−6) − 8.697𝑚
𝑪 =-8.465m
b.) Correction due to slope
Formula:
ℎ2
𝐶𝑠 =
2𝑆
Given Formula:
L = S = 855.444 m ℎ2
θ = 11°20′30” 𝐶𝑠 =
2𝑆
h =?
(168.231)2
𝐶𝑠 =
Formula: 2(855.444)
𝑠𝑖𝑛 𝜃 =
ℎ 𝑪𝒔 = 𝟏𝟔. 𝟓𝟒𝟐𝒎
𝐿
Solution:
ℎ
𝑠𝑖𝑛 11°20′30” = 855.444
𝒉 = 𝟏𝟔𝟖. 𝟐𝟑𝟏𝒎
c) The correct horizontal distance of the
line.
Formula:
𝐿 𝑚 𝑐𝑜𝑟𝑟 = 𝐿 𝑚 ± 𝐶𝑡𝑡 − 𝐶𝑠𝑡 ± 𝐶𝑝 − 𝐶𝑠
Given:
𝐿 𝑚 = 3340.775𝑚
𝐶𝑡𝑡 = +0.595𝑚
𝐶𝑠𝑡 = −8.705𝑚
𝐶𝑝 = −2.24 𝑥 10−6m
𝐶𝑠 = 16.542𝑚
Formula:
𝐿𝑚 −6
𝑐 𝑜 𝑟𝑟 = 3340.775 + 0.595 − 8.705 − 2.24 𝑥 10 − 16.542
𝑳𝒎𝒄𝒐𝒓𝒓 = 3316.123m
2. Compute and plot the profile of the given data and determine the difference in
elevation between points.
3. Compute the true bearings and true azimuth from north and south
of the following lines of dodecagon if line AB magnetic angle is
(11°12'20.02") and the angle of declination of Luneta in February 2022
is applied.
A B
v
L v C
K D
J E
I F
H G
AB TRUE BEARING AB
= 11°12′20.02" − 2°4′ 2°4′
AZIMUTH
TRUE NORTH
𝑵 3°12′ 𝟐𝟎. 𝟎2"𝑬
3°12′𝟐𝟎. 𝟎2“
TRUE SOUTH
= 180° + 3°12′𝟐𝟎. 𝟎2"
= 111°12′𝟐𝟎. 𝟎2"
BC TRUE BEARING BC
= 30° − 3°12′𝟐𝟎. 𝟎2“
=S 26°47′39.98“ E
S 333°12′𝟐𝟎. 𝟎2" E
AZIMUTH
TRUE NORTH
= 180° − 26°47′39.98“
= 153°12′𝟐𝟎. 𝟎2"
TRUE SOUTH
= 360° − 26°47′39.98“
= 333°12′𝟐𝟎. 𝟎2"
CD TRUE BEARING CD
= 30° + 26°47′39.98“
= 𝑺 56°47′𝟑𝟗. 𝟗8" 𝑬
AZIMUTH
TRUE NORTH
= 180° − 56°47′𝟑𝟗. 𝟗8" 𝑺 𝟑03°12′𝟐𝟎. 𝟎2" 𝑬
= 𝟏23°12′𝟐𝟎. 𝟎2“
TRUE SOUTH
= 360° − 56°47′𝟑𝟗. 𝟗8"
= 𝟑03°12′𝟐𝟎. 𝟎2"
DE TRUE BEARING DE
= 30° + 56°47′𝟑𝟗. 𝟗8"
= 𝑺 86°47′𝟑𝟗. 𝟗8" 𝑬
AZIMUTH
TRUE NORTH
= 180° − 86°47′𝟑𝟗. 𝟗8" 𝑺 273°12′𝟐𝟎. 𝟎2" 𝑬
= 93°12′𝟐𝟎. 𝟎2"
TRUE SOUTH
= 360° − 86°47′𝟑𝟗. 𝟗8"
= 273°12′𝟐𝟎. 𝟎2"
EF TRUE BEARING EF
= 30° − 86°47′𝟑𝟗. 𝟗8"
= 𝑺 56°47′𝟑𝟗. 𝟗8" 𝑾
TRUE NORTH
= 180° + 56°47′𝟑𝟗. 𝟗8"
= 236°47′𝟑𝟗. 𝟗8"
TRUE SOUTH
= 236°47′𝟑𝟗. 𝟗8"
FG TRUE BEARING FG
= 56°47′𝟑𝟗. 𝟗8" − 30°
= 𝑺 26°47′𝟑𝟗. 𝟗8" 𝑾
TRUE SOUTH
= 26°47′𝟑𝟗. 𝟗8"
GH TRUE BEARING GH
= 30° + 26°47′𝟑𝟗. 𝟗8"
= 𝑺 56°47′𝟑𝟗. 𝟗8" 𝑾
𝑺 56°47′𝟑𝟗. 𝟗8" 𝑾
AZIMUTH
TRUE NORTH
= 180° + 56°47′𝟑𝟗. 𝟗8"
= 236°47′𝟑𝟗. 𝟗8"
TRUE SOUTH
= 56°47′𝟑𝟗. 𝟗8"
HI TRUE BEARING HI
= 56°47′𝟑𝟗. 𝟗8" − 30°
= 𝑵 26°47′𝟑𝟗. 𝟗8" 𝑾 𝑺 153°12′𝟐𝟎. 𝟎2" 𝑾
AZIMUTH
TRUE NORTH
= 360° − 26°47′𝟑𝟗. 𝟗8"
= 333°12′𝟐𝟎. 𝟎2"
TRUE SOUTH
= 180 ° − 26°47′𝟑𝟗. 𝟗8"
= 153°12′𝟐𝟎. 𝟎2"
IJ TRUE BEARING IJ
= 30° + 26°47′𝟑𝟗. 𝟗8"
= 𝑵 56°47′𝟑𝟗. 𝟗8" 𝑾 𝑺 303°12′𝟐𝟎. 𝟎2" 𝑾
AZIMUTH
TRUE NORTH
= 180° − 56°47′𝟑𝟗. 𝟗8"
= 123°12′𝟐𝟎. 𝟎2"
TRUE SOUTH
= 360° − 56°47′𝟑𝟗. 𝟗8"
= 303°12′𝟐𝟎. 𝟎2"
JK TRUE BEARING JK
= 30° − 56°47′𝟑𝟗. 𝟗8"
= 𝑵 26°47′𝟑𝟗. 𝟗8" 𝑾 𝑺 333°12′𝟐𝟎. 𝟎2" 𝑾
AZIMUTH
TRUE NORTH
= 180° − 26°47′𝟑𝟗. 𝟗8"
= 153°12′𝟐𝟎. 𝟎2"
TRUE SOUTH
= 360° − 26°47′𝟑𝟗. 𝟗8"
= 333°12′𝟐𝟎. 𝟎2"
KL TRUE BEARING KL
= 30° − 26°47′𝟑𝟗. 𝟗8"
= 𝑵 3°12′20. 02" 𝑾
AZIMUTH
TRUE NORTH
3°12′20. 02“ 𝑺 32°47′39. 98" 𝑾
TRUE SOUTH
= 360 − 3°12′20. 02“
= 32°47′39. 98"
LA TRUE BEARING LA
= 𝟑𝟎° − 3°12′20. 02"
= 𝑵 26°47′𝟑𝟗. 𝟗8" 𝑬
AZIMUTH
TRUE NORTH
𝑺 𝟑𝟓𝟎°𝟓𝟗′𝟐𝟎. 𝟎2" 𝑾
= 26°47′𝟑𝟗. 𝟗8"
TRUE SOUTH
= 360° − 26°47′𝟑𝟗. 𝟗8"
= 𝟑𝟓𝟎°𝟓𝟗′𝟐𝟎. 𝟎2"
4. From the following observations ABCD were taken with a
stadia interval factor of 100 and an instrument constant of
0.30 using an optical instrument fitted with an anallactic
lens. Instrument Station Vertical Staff Reading
HI Remarks
Station of Staff Angle a b c
Elev. of A
Your 25(2DD+4MM+Y.YYY)
Your +0.745 -0.745
B C +8°15’30” eye Elev. of A
height from c from c
level 25(211+411+2.002)
=15600.05 m
Your
Your +0.635 -0.635
C D -14°34’30” from c from c eye
height level
Station A:
𝑠 = 1.585 − 0.825 = 0.760
Horizontal Distances AB
𝐷 = 𝐾𝑠𝑐𝑜𝑠2𝜃 + 𝐶(𝑐𝑜𝑠𝜃)
𝐷 = (100)(0.760)(cos 22°14°30”)2 + 0.30(cos
22°14°30”)
𝐷1 = 65.111 + 0.278
𝑫𝟏 = 𝟔𝟓. 𝟑𝟖𝟗 𝒎
Vertical distance AB
1
𝑉 = 𝐾𝑠(𝑠𝑖𝑛2𝜃) + 𝑐(𝑠𝑖𝑛𝜃)
2
1
𝑉 = (100)(0.760)(sin 2 × 22°14°30”) + 0.30(sin 22°14°30”)
2
𝑉1 = 26.626 + 0.114
𝑽𝟏 = 𝟐𝟔. 𝟕𝟒𝟎 𝒎
Station C:
𝑠 = 1.585 − 0.745 = 0.840
Horizontal Distances BC
𝐷 = 𝐾𝑠𝑐𝑜𝑠2𝜃 + 𝐶(𝑐𝑜𝑠𝜃)
𝐷 = (100)(0.840)(cos 8°15’30” )2 +
0.30(cos 8°15’30”)
𝐷2 = 82.267 + 0.297
𝑫𝟐 = 𝟖𝟐. 𝟓𝟔𝟒 𝒎
Vertical Distance BC
1
𝑉 = 𝐾𝑠(𝑠𝑖𝑛2𝜃) + 𝑐(𝑠𝑖𝑛𝜃)
2
1
𝑉 = (100)(0.840)(sin 2 × 8°15’30” ) + 0.30(sin 8°15’30”)
2
𝑉2 = 11.940 + 0.043
𝑽𝟐 = 𝟏𝟏. 𝟗𝟖𝟑 𝒎
Station D:
𝑠 = 1.585 − 0.635 = 0.950
a) Determine the length of distance BC using Compass Rule and Transit Rule
b) Determine the azimuth from north of the line EAusing Compass Rule and Transit Rule
c) Determine the area of the lot using DMD and DPD.
d) If a line is drawn from point B divide the lot in half.
e) Compute the length of the line BZ.
f) Compute the length of the line DZ.
g) Compute the bearing of line ZB.
First solve the Latitude and Departure
Latitude
𝐿𝑎𝑡𝐴𝐵 = 529.651 cos 48°20’00” = 𝟑𝟓𝟐. 𝟏𝟏𝟎
𝐿𝑎𝑡𝐶𝐷 = 563.647 cos 7°59’00” = 𝟓𝟓𝟖. 𝟏𝟖𝟒
𝐿𝑎𝑡𝐷𝐸 = 753.423 cos 80°00’00” = 𝟏𝟑𝟎. 𝟖𝟑𝟏
Departure
𝐷𝑒𝑝𝐴𝐵 = 529.651 sin 48°20’00” = 𝟑𝟗𝟓. 𝟔𝟔𝟑
𝐷𝑒𝑝𝐶𝐷 = 563.647 sin 7°59’00” = 𝟕𝟖. 𝟐𝟖𝟐
𝐷𝑒𝑝𝐷𝐸 = 753.423 sin 80°00’00” = 𝟕𝟒𝟏. 𝟗𝟕𝟕
Now we need to solve the latitude and departure correction
Latitude Correction: Departure Correction:
𝐶𝑙 = 𝑁𝐿 + 𝑆𝐿 𝐶𝑑 = 𝐸𝐷 + 𝑊𝐷
𝒂 = 𝟓𝟒°𝟓𝟓’𝟓. 𝟔𝟖”
𝒃 = 𝟓𝟎𝟖. 𝟎𝟎𝟕𝒎
COURSE DISTANCE BEARING
AB 529.651 N 48°20’00” E
BC 508.007 N 87°00’00” E
CD 563.647 S 7°59’00” E
DE 753.423 S 80°00’00” E
EA 428.289 38°04’54.32”
B N 87°00’00”E C
508.007
753.423
D
S 80°00’00”E
E
Compass rule:
For the latitudes
𝐿𝑎𝑡𝐴𝐵 = 529.651 cos 48°20’00” = 𝟑𝟓𝟐. 𝟏𝟏𝟎
𝐿𝑎𝑡𝐵𝑐 = 508.007 cos 87°00’00” = 𝟐𝟔. 𝟓𝟖𝟕
𝐿𝑎𝑡𝐶𝐷 = 563.647 cos 7°59’00” = 𝟓𝟓𝟖. 𝟏𝟖𝟒
𝐿𝑎𝑡𝐷𝐸 = 753.423 cos 80°00’00” = 𝟏𝟑𝟎. 𝟖𝟑𝟏
𝐿𝑎𝑡𝐸𝐴 = 428.289 cos 38°04’54.32” = 𝟑𝟑𝟕. 𝟏𝟐𝟎
Departure
𝐷𝑒𝑝𝐴𝐵 = 529.651 sin 48°20’00” = 𝟑𝟗𝟓. 𝟔𝟔𝟑
𝐷𝑒𝑝𝐵𝑐 = 508.007 sin 87°00’00” = 𝟓𝟎𝟕. 𝟑𝟏𝟏
𝐷𝑒𝑝𝐶𝐷 = 563.647 sin 7°59’00” = 𝟕𝟖. 𝟐𝟖𝟐
𝐷𝑒𝑝𝐷𝐸 = 753.423 sin 80°00’00” = 𝟕𝟒𝟏. 𝟗𝟕𝟕
𝐷𝑒𝑝𝐸𝐴 = 428.289 sin 38°04’54.32” = 𝟐𝟔𝟒. 𝟏𝟔𝟐
Now we need to solve the latitude and departure correction
529.651
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐴𝐵 = 26.802 = 𝟓. 𝟏𝟎𝟏
2783.017
508.007
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐵𝐶 = 26.802 = 𝟒. 𝟖𝟗𝟐
2783.017
563.647
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐶𝐷 = 26.802 = 𝟓. 𝟒𝟐𝟖
2783.017
753.423
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐷𝐸 = 26.802 = 𝟕. 𝟐𝟓𝟔
2783.017
428.289
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐸𝐴 = 26.802 = 𝟒. 𝟏𝟐𝟓
2783.017
529.651
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐴𝐵 = −24.883 = −𝟒. 𝟕𝟑𝟔
2783.017
508.007
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐵𝐶 = −24.883 = −𝟒. 𝟓𝟒𝟐
2783.017
563.647
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐶𝐷 = −24.883 = −𝟓. 𝟎𝟒𝟎
2783.017
753.423
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐷𝐸 = −24.883 = −𝟔. 𝟕𝟑𝟔
2783.017
428.289
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐸𝐴 = −24.883 = −𝟑. 𝟖𝟐𝟗
2783.017
Adjustment in departure:
395.663 + 4.736 = 𝟒𝟎𝟎. 𝟑𝟗𝟗
507.311 + 4.542 = 𝟓𝟏𝟏. 𝟖𝟓𝟑
78.282 + 5.040 = 𝟖𝟑. 𝟑𝟐𝟐
−741.977 + 6.736 = −𝟕𝟑𝟓. 𝟐𝟒𝟏
−264.164 + 3.829 = − 𝟐𝟔𝟎. 𝟑𝟑𝟑
+N -S +E -W Corrlat corrdep +N -S +E -W
𝟕𝟏𝟓. 𝟖𝟏𝟕 −𝟔𝟖𝟗. 𝟎𝟏𝟓 981.256 1006.139 𝟕𝟎𝟏. 𝟔𝟗𝟗 −𝟕𝟎𝟏. 𝟔𝟗𝟗 995.574 −𝟗𝟗𝟓. 𝟓𝟕𝟒
DPD
𝐴𝐵 = +𝟑𝟒𝟕. 𝟑𝟗𝟗
𝐵𝐶 = +347.009 + 347.009 + 21.695 = 𝟕𝟏𝟓. 𝟕𝟏𝟑
𝐶𝐷 = +715.713 + 21.695 − 563.612 = 𝟏𝟕𝟑. 𝟕𝟗𝟔
𝐷𝐸 = +173.796 − 563.612 − 138.087 = −𝟓𝟐𝟕. 𝟗𝟎𝟑
𝐸𝐴 = −527.903 − 138.087 + 332.995 = −𝟑𝟑𝟐. 𝟗𝟗𝟓
DA: NDA AND SDA
𝐴𝐵 = +347.009 +400.339 = 𝟏𝟑𝟖𝟗𝟒𝟐. 𝟎𝟓𝟕
𝐵𝐶 = +21.695 +1312.651 = 𝟐𝟖𝟒𝟕𝟕. 𝟗𝟔𝟑
𝐶𝐷 = −563.612 +1907.826 = −𝟏𝟎𝟕𝟓𝟐𝟕𝟑. 𝟔𝟐𝟖
𝐷𝐸 = −138.087 +1255.907 = −𝟏𝟕𝟑𝟒𝟐𝟒, 𝟒𝟑𝟎
𝐸𝐴 = +332.995 +260.333 = 𝟖𝟔𝟔𝟖𝟗. 𝟓𝟖𝟕
Area DMD
𝟏
𝑨= ( 𝑵𝑫𝑨 + 𝑺𝑫𝑨)
𝟐
1
𝐴= [254,109.607 + −1,248,698.058 ]
2
𝑨 = 𝟒𝟗𝟕, 𝟐𝟗𝟒. 𝟐𝟐𝟔 𝒔𝒒. 𝒖𝒏𝒊𝒕𝒔
DA: EDA AND WDA
𝐴𝐵 = +400.399 +347.099 = 𝟏𝟑𝟖𝟗𝟕𝟖. 𝟎𝟗𝟑
𝐵𝐶 = +511.853 +715.13 = 𝟑𝟔𝟔𝟑𝟑𝟗. 𝟖𝟒𝟔
𝐶𝐷 = +83.322 +173.796 = 𝟏𝟒𝟒𝟖𝟏. 𝟎𝟑𝟎
𝐷𝐸 = −735.241 −527.903 = 𝟖𝟔𝟔𝟖𝟗. 𝟓𝟖𝟕
𝐸𝐴 = −260.333 −332.995 = 𝟗𝟗𝟒𝟔𝟐𝟒. 𝟒𝟖𝟔
AREA DPD
𝟏
𝑨= ( 𝑬𝑫𝑨 + 𝑾𝑫𝑨)
𝟐
𝟏
𝑨= (𝟗𝟗𝟒𝟔𝟐𝟒. 𝟒𝟖𝟔 + 𝟎)
𝟐
𝑨 = 𝟒𝟗𝟕, 𝟑𝟏𝟐. 𝟐𝟒𝟑 𝒔𝒒. 𝒖𝒏𝒊𝒕𝒔
DMD +NDA +SDA DPD +EDA +WDA
26.802
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐴𝐵 = 352.110 = 𝟔. 𝟕𝟏𝟖
1404.832
26.802
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐵𝐶 = 26.587 = 𝟎. 𝟓𝟎𝟕
1404.832
26.802
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐶𝐷 = −558.184 = 𝟏𝟎. 𝟔𝟒𝟗
1404.832
26.802
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐷𝐸 = −130.831 = 𝟐. 𝟒𝟗𝟔
1404.832
26.802
𝐶𝑜𝑟𝑟𝑙𝑎𝑡𝐸𝐴 = 337.120 = 𝟔. 𝟒𝟑𝟐
1404.832
𝜮𝑬𝑫 + 𝜮𝑾𝑫
𝑪𝒐𝒓𝒓𝒍𝒂𝒕𝒙𝒚 = 𝑫𝒆𝒑𝒙𝒚
𝜮𝑬𝑫 − 𝜮𝑾𝑫
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐴𝐵 = 395.663 = −𝟒. 𝟗𝟓𝟒
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐵𝐶 = 507.311 = −𝟔. 𝟑𝟓𝟐
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐶𝐷 = 78.282 = −𝟎. 𝟗𝟖𝟎
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐷𝐸 = −741.977 = −𝟗. 𝟐𝟗𝟎
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐸𝐴 = −264.162 = −𝟑. 𝟑𝟎𝟕
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐴𝐵 = 395.663 = −𝟒. 𝟗𝟓𝟒
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐵𝐶 = 507.311 = −𝟔. 𝟑𝟓𝟐
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐶𝐷 = 78.282 = −𝟎. 𝟗𝟖𝟎
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐷𝐸 = −741.977 = −𝟗. 𝟐𝟗𝟎
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐸𝐴 = −264.162 = −𝟑. 𝟑𝟎𝟕
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐴𝐵 = 395.663 = −𝟒. 𝟗𝟓𝟒
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐵𝐶 = 507.311 = −𝟔. 𝟑𝟓𝟐
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐶𝐷 = 78.282 = −𝟎. 𝟗𝟖𝟎
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐷𝐸 = −741.977 = −𝟗. 𝟐𝟗𝟎
1987.395
−24.883
𝐶𝑜𝑟𝑟𝑑𝑒𝑝𝐸𝐴 = −264.162 = −𝟑. 𝟑𝟎𝟕
1987.395
715.829 𝟔𝟖𝟗. 𝟎𝟏𝟓 𝟏𝟕𝟐𝟑. 𝟎𝟐𝟓 𝟐𝟔𝟒. 𝟏𝟑𝟐 702,160 −702,160 993.542 −993.542
DPD
𝐴𝐵 = 𝟑𝟒𝟓. 𝟑𝟗𝟐
𝐵𝐶 = 345.392 + 345.392 + 26.080 = 𝟕𝟏𝟔. 𝟖𝟒𝟔
𝐶𝐷 = 716.846 + 26.080 − 568.833 = 𝟏𝟕𝟒. 𝟏𝟏𝟏
𝐷𝐸 = 174.111 − 568.833 − 133.327 = −528.049
𝐸𝐴 = −528.049 − 133.327 + 330.688 = −𝟑𝟑𝟎. 𝟔𝟖𝟖
DA: NDA AND SDA
𝐴𝐵 = 345.392 400.617 = 138369.907
𝐵𝐶 = 26.069 1314.897 = 34292.514
𝐶𝐷 = −568.833 1907.822 = −1085232.112
𝐷𝐸 = −133.327 1254.397 = −167244.989
𝐸𝐴 = 330.688 260.855 = 86261.618
Area DMD
𝟏
𝑨= ( 𝑵𝑫𝑨 + 𝑺𝑫𝑨)
𝟐
𝟏
𝑨= (𝟐𝟓𝟖𝟗𝟐𝟒. 𝟎𝟑𝟗 − 𝟏𝟐𝟓𝟐𝟒𝟕𝟕. 𝟏𝟎𝟏)
𝟐
𝑨 = 𝟒𝟗𝟔, 𝟕𝟕𝟔. 𝟓𝟑𝟏 𝒔𝒒. 𝒖𝒏𝒊𝒕𝒔
DA: EDA AND WDA
𝐴𝐵 = 400.617 345.389 = 138369.907
𝐵𝐶 = 513.663 716.847 = 368217.267
𝐶𝐷 = 79.262 174.111 = 13800.386
𝐷𝐸 = −732.687 −528.049 = 386967.906
𝐸𝐴 = −260.855 −330.688 = 86261.618
AREA DPD
1
𝐴= ( 𝐸𝐷𝐴 + 𝑊𝐷𝐴)
2
𝟏
𝑨= (𝟗𝟗𝟑, 𝟔𝟏𝟕. 𝟎𝟖𝟒 − 𝟎)
𝟐
𝑨 = 𝟒𝟗𝟔, 𝟖𝟎𝟖. 𝟓𝟒𝟐 𝒔𝒒. 𝒖𝒏𝒊𝒕𝒔
DMD +NDA +SDA DPD +EDA +WDA
BC 26.587 507.311
CD
-558.184 78.282
𝐵𝐷 = (−531.597)2+(585.593)2
𝐵𝐷 = 790.895 𝑚
−1 585.593
𝜃= tan
531.597
𝜃 = 47°46′1.43"
78.282
𝜃𝐷𝑍 = tan−1
558.184
𝜃𝐷𝑍 = 7°58′59.97"
𝜃𝐷𝑍 = tan−1 78.282
558.184
𝜃𝐷𝑍 = 7°58′59.97"
47°46′1.43"+7°58′59.97" = 55°45′1.4"
𝐵𝑍 790.895
=
cos 55°45′1.4" cos 7°58′ 59.97"
𝑩𝒁 = 𝟒𝟒𝟗. 𝟒𝟕𝟏 𝒎