0% found this document useful (0 votes)
7 views2 pages

4400017313-April 8,,2024

Ttt

Uploaded by

nawaf alshaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views2 pages

4400017313-April 8,,2024

Ttt

Uploaded by

nawaf alshaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PLANT AND FACILITY SAFETY

DAILY SAFETY OBSERVATION

Operating Area: WOA Department: PDC


Project Name: CONSTRUCTION OF HENAKIYAH (HNK) PV 380/110KV BSP
SUBSTATION
Contractor Name: ALFANAR CONSTRUCTION Project Type: Contract No.: 4400017313

Number: 166 Contractor: Alfanar


OBSERVATION CORRECTION
Date: 8-April-2024 Date: 8-April-2024
REPORT REPORT
Inspected by: Muhammad Shakeel / Allen Prowel Corrected by: Abdur Rahman/ Nouaf Alshaikh

No Photo before Comments Risk matrix Photo after Action taken

Observed scaffolding jack √ Wooden pieces have been


1
was on wooden pieces on removed.
380kv building.

Observed improper access √


2 Access have been closed.
to (Basement #2) in 110kv
building #2.

OHS Forms Procedure Reference Revision Number Revision Date Approved By


Daily Safety Observation OHS-PR-09-09-F00 (I) 0 MAY 2021 OHSMS
PLANT AND FACILITY SAFETY
DAILY SAFETY OBSERVATION

Operating Area: WOA Department: PDC


Project Name: CONSTRUCTION OF HENAKIYAH (HNK) PV 380/110KV BSP
SUBSTATION
Contractor Name: ALFANAR CONSTRUCTION Project Type: Contract No.: 4400017313

No Photo before Comments Risk matrix Photo after Action taken

Inform the concerned person


Observed Unnecessary
to remove the unnecessary
3 materials that are stack
materials from
improperly in site beside
observed location.
gantry area.
√ It has been removed.

Observed unwanted waste Inform the concerned person


4 material near tunnel 3. to remove the waste.
It has been removed.

OHS Forms Procedure Reference Revision Number Revision Date Approved By


Daily Safety Observation OHS-PR-09-09-F00 (I) 0 MAY 2021 OHSMS