0% found this document useful (0 votes)
71 views

Visual Inspection JHA

Uploaded by

jerilmj98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views

Visual Inspection JHA

Uploaded by

jerilmj98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

To discuss with area authority to understand safe


Impact or obstruction P=2C(M), access and egress of work place P-1C (L), Work site supervisor / CLASSIFICATIO
1 Visual inspection and with objects or A=2C(M),  Label or post authority escape root map for in case of A-1C(L), HSE officer N: C
functional test for operation machineries due to E=2C(M), emergency and to understand assemble point. E-1C(L),JHA No.:
R=2C(M)
JHA/MO-01
improper access  Ensure proper housekeeping is maintained on the R-1C(L)
JOBworkHAZARD ANALYSIS
platform, remove unnecessary material from the
Rev.: 0
Date: 18.07.2024
work access and avoid unwanted accidents
Job Ref./Project No.: GC231068C0 Hazardous Area Classification MPB Job Location: MPB Non Hazardous
 All personnel should wear appropriate PPE including,
Job Description: Visual inspection and functional test Zone
hard hat, safety shoes, 0
eye glass, etc. Zone 1 Zone 2 Cold
Risk Rating
Residual Action Party/
S/N Activities (Job Steps) Potential Hazard before Mitigation Controls/ Mitigation Measures
 To ensure with area authority with regarding Risk/ Remarks
Impact or obstruction inspection and functional test area visibility if P-1C (L), Work site supervisor /
Rating
2 Visual inspection and with objects or P-4C (M), A-1C(L), HSE officer
functional test for operation A-3C(M),
PREVENTIVE MAINTENANCE
needs provide lights arrangements for adequate
machineries due to visibility. E-1C(L),
poor visibility or E-1C(M), R-1B(L)
R-3C (M)  Toolbox talk to be conduct and ensure team clearly
illumination and lack P=2C(M), understood the
Impact or obstruction  procedure, and associated
Find the details hazards
from authority about the P-1C (L),
of coordination
Visual inspection and functional with objects or A=2C(M), and controls and verify by asking question to and
knowsubject to A-1C(L), Work site supervisor /
equipment or machineries
1 test for operation machineries due to E=2C(M), their level of understanding
assessment. E-1C(L), HSE officer
improper access 
R=2C(M) Collect the details
 from inspection
Decide and coordinate
the appropriate access for safe R-1C(L)
with team for safe operations.
and easy operation
 Coordinate with team and bring
Inspection to required and under valid permit
be conducted
additional tools or equipment’s,
to work. for any emergency
 Use Required Personal protective equipment’s
 De-energize the live electrical system and follow
before the inspection.
Electrical hazards P- 3C (M), lockout/tagout procedure before conducting the P- 1C (L), Work site supervisor /
3 Visual inspection / functional including electrical A- 3C (M), inspection A- 1C (L), HSE officer
test and Planning for shock or electrocution E- 1C (L),  The testing should be performed by competent E- 1C(L),
operations from live electrical R- 3C (M) person.  To ensure with area authority with R- 1C (L)
components Impact or obstruction  The crane to be operate by trained operator with QE test
P-4C (M), regarding inspection and functional P-1C (L),
with objects or PTS approval.
2 Visual inspection and functional A-3C(M), area visibility if needs provide lights A-1C(L), Work site supervisor
machineries due to  Perform functional arrangements
test in a controlled environment
test for operation E-1C(M), for adequate visibility. E-1C(L),
poor visibility or with proper barriers to prevent unauthorized to the
illumination and lack of R-3C (M) testing area.  Place or hang safety reflector access sign R-1B(L)
coordination  boards.
The test to be perform under the supervision of a

competent person. Toolbox talk to be conduct and ensure
 Test emergency stopteambuttons and
clearly ensure their
understood thefull
procedure,
functionality. and associated hazards and controls

 Ensure lockout/tagout procedures to de


Impact or electric P-4C (M), P-1C (L), Work site supervisor /
energize the live electrical system before
Visual inspection / functional test hazards with live A-3C(M), A-1C(L), HSE officer
3 and Planning for operations conducting the inspection.
electrical equipment’s E-1C(M), E-1C(L),
R-3C (M)  Visual inspection of the machineries should R-1C(L)
or machineries
be conducted by competent person who
have the ability to identify damages and
malfunction.
 The work area to be barricaded and post
safety signboards to avoid unauthorized
entry.
 Use Required Personal protective equipment’s
before the inspection.

CORRECTIVE MAINTENANCE
TEAM MEMBERS AND ENDORSEMENT:
S/N Name Position/ Ref. Sign S/ Name Position/ Ref. Sign
N Indicator
1
2

JHA Team Leader Authorization: Ref. Indicator: Sign:


JHA approval ( Permit Authority/ asset Holder): Ref. Indicator Sign: