Contents
Foreword.........................................................................................................................................................................................................................v
Disclaimer.................................................................................................................................................................................................................... vi
1. BACKGROUND........................................................................................................................................................................................... 1
1.4.3. The National Building (Standards for Electrical Installations in Buildings) Code, 2019............... 4
1.4.4. The National Building (Accessibility Standards for Persons with Disabilities) Code, 2019......... 5
1.4.5. The National Building (Standards for Mechanical Installations in Buildings) Code, 2019.......... 5
1.5.1. Constitution...................................................................................................................................................................................... 5
1.5.8. Occupational Health and Safety Act, 2006, Act No. 9 of 2006....................................................................... 6
1.5.9. The Public Procurement and Disposal of Assets Act, 2003, Act No.1 of 2003..................................... 6
ii
Implementation Guide
3.4. Transition.........................................................................................................................................................................................19
iii
Implementation Guide
iv
Implementation Guide
Foreword
The National Building Review Board (NBRB), a semi-autonomous body, under the Ministry
of Works and Transport, was established under section 3 of the Building Control Act, 2013
(the Act) to, monitor building developments in the country and to oversee, inspect and
monitor the operations of Building Committees among others.
The Minister of Works and Transport issued the National Building Code, 2019 (the Code)
and the Building Control Regulations, 2020 (the Regulations) under sections 46 and 52
of the Act, respectively. The complexity of the Code and Regulations makes it critical for
the membership of the Building Committees to have an in-depth understanding of the
legal and institutional framework in the implementation of the Act. The guide has been
developed to ease the implementation of the building control legal framework. It is my
hope that the material contained herein will ease implementation of the Act, Regulations,
the Code, as well as the use of building control standard documents, manuals and forms.
Finally, I wish to confer my profound gratitude to Arch. Verna Mbabazi and Arch. Mark
Bwambale (Uganda Society of Architects); Eng. Caleb Tugumisirize, Eng. Dr. Abraham
Judah Bumalirivu Muwanguzi and Eng Edward Kasule Musisi (Uganda Institution of
Professional Engineers); Ms Juliet Komugisa (Ministry of Justice and Constitutional Affairs)
and Arch. Jerome Olowo Stowell (NBRB Secretariat) for the credible input and eventual
preparation of this implementation guide. I similarly thank their parent institutions for
seconding to us such a dedicated team of true technocrats.
EXECUTIVE SECRETARY
v
Implementation Guide
Disclaimer
The material and information contained in this Implementation Guide is for general
information and ease of reference only. The information in the Guide is not intended
to substitute the laws, Regulations and Code cited in this Guide. Users of the Guide are
encouraged to refer to the detailed text of the relevant law in order to make any business,
legal or any other decisions.
vi
Implementation Guide
1. BACKGROUND
Prior to enactment of the Building Control Act, 2013, building operations were regulated
by the Public Health Act Cap. 269 and regulations made thereunder. However, the
Public Health Act did not comprehensively address the concerns of the construction of
buildings and related installations in Uganda, thus the need for a specific law to regulate
the construction of buildings.
The construction of buildings and installations have been carried out in cities, urban
centres and rural areas without adequate supervision and monitoring by Government.
This has greatly compromised public safety due to failure to ensure structural integrity of
buildings, failure to observe building standards and adherence to the law.
(a) Deficiencies in the law. The Public Health Act, Cap. 269 was inadequate to regulate
the building sector due to the following-
ii. fines, fees and penalties that do not reflect the current social and economic
trends;
iii. reference to some materials that are no longer in use and some which are
considered a health hazard;
iv. exclusion of some materials and construction methods that have evolved with
change in technology; and
The Building Control Act, 2013 was enacted to address the above challenges and to
ensure safety and orderly developments on the limited and highly competitive land
available in the country.
The purpose of the Building Control Act, 2013 (Act) is to consolidate, harmonise and
amend the law relating to the erection of buildings, to provide for building standards, to
establish a National Building Review Board and Building Committees, to promote and
ensure planned, decent and safe building structure that are developed in harmony with
the environment.
1
Implementation Guide
The Building Control Act, 2013, has seven Parts and 3 Schedules as highlighted below-
1. Part I provides for preliminary matters of the Act such as commencement and
interpretation of important phrases used in the Act.
2. Part II- establishes the National Building Review Board as a body corporate
composed of 16 members representing various institutions such as the Ministry
of Works and Transport, Ministry of Lands Housing and Urban Development,
Ministry of Health, professional bodies regulating Engineers, Architects, Lawyers,
Surveyors and Physical Planners, interalia, as elaborated further under institutional
arrangement for implementation of the Act.
The Board is supported by the Secretariat that is headed by the Executive Secretary
assisted by other staff. The Executive Secretary is the Chief Executive Officer of the
Board and is responsible for the day to day operations of the Board. (s.16).
The Board has powers to recruit staff under s.17 to assist it in the performance of its
functions and also to hire consultants under s.18.
4. Part IV –deals with Finances of the Board in sections 20-27 of the Act.
The Board is a self-accounting body whose source of funds is monies appropriated
by Parliament, fees for services rendered or from grants and donations from well-
wishers.
6. Part VI- deals with Control of Buildings Operations including powers of the Building
Committee to stop building operation under section 40 and power to order
remedial action on defective buildings under section 41. Further, under this Part,
the Minister has power to prohibit unsafe building methods and materials under
section 42. The Building Control Officer is empowered to enter any premises to
inspect or carry out tests under s.43. This Part also regulates the grant of occupation
permits (s.44) and liability for causing accidents on building construction site (s.45).
2
Implementation Guide
7. Part VII- deals with Miscellaneous matters such as powers of the Minister to issue
the National Building Code under section 46 of the Act, reports required under the
Act (s.47), power of the Minister to give directions (s.48), delegation of Minister’s
powers and the extent of delegation (s.49), note however that the Minister cannot
delegate his or her powers to prohibit use of a building method or material,
power to issue the National Building Code and Regulations and power to amend
the Schedules to the Act. All other powers may be delegated by instrument of
delegation. Part VII also deals with service of notices, power of the Minister to issue
regulations (s.52), amendment of Schedules, transition and effect of the Act on
existing applicable laws. It should be noted that the Building Control Act, 2013
takes precedence over existing laws that are inconsistent with it.
8. Schedule 1 provides for the value of a currency point which is equivalent to twenty
thousand shillings.
9. Seclude 2 provides for meetings and procedure of the Board, including, calling
meetings, quorum, disclosure of interest of members and validity of proceedings
not affect by vacancy, among other matters.
In the case of the Building Control Act, 2013, section 52 empowers the Minister,
on the advice of the Board, to make regulations generally for better carrying into
effect of the provisions of the Act.
Under that provision, the BCR, 2020 were issued by the Minister and prescribe the
following procedural matters -
ii. the procedure and the costs to be paid in respect of any appeal lodged with
the Board;
3
Implementation Guide
Section 46 of the Act empowers the Minister to issue the National Building Code
(NBC). The NBC provides for matters relating to -
Building Standards
Structural Design
Plumbing
Electrical installations
Mechanical installations
It should be noted that the Act does not define the word ‘Code’. However,
according to Blacks Law Dictionary 8th Ed, “a code is a complete system of
positive law, carefully arranged and officially promulgated; a systematic
collection or revision of laws, rules or regulations. A Code is a compilation not
just of existing statutes, but also much of the unwritten law on a subject, which
is newly enacted as a complete system of law.”
On basis of that construction of the term Code, the NBC has been issued by the
Minister compiling existing written standards (such as Public Health Building
Rules) and unwritten standards relating to building operations.
This provides standards for both private and public buildings in aspects of site
laying, building design, building materials, building services, environmental
protection and energy efficiency in buildings.
This provides the basis of design, standards for loads, the characteristics of
strength of structural materials, geotechnical investigations to ensure that
buildings perform satisfactorily during the intended life, sustain all loads and
deformations of normal construction and use and afford adequate durability
and resistance to the effects of nature; to ensure due regard is given to economy
in design, structural safety, serviceability and durability.
4
Implementation Guide
1.4.4. The National Building (Accessibility Standards for Persons with Disabilities)
Code, 2019
This provides for standards that must be complied with by all buildings accessible
by PWDs. E.g. signage used should be international symbol of access- in terms
of direction, name of facility, height of lettering, reserved parking slots, number
of parking clots, marking, size of slots, location of the parking slots viz a vie
entrance of facility (50m) etc.
This deals with standards for plumbing works, drainage works, septic tanks,
cess pools and latrines.
1.5.1. Constitution
Is the Supreme Law of Uganda upon which all other laws must
conform.
This Act provides for the establishment of the National Physical Planning
Board, its composition, functions and procedure of the Board; it establishes
district and urban physical planning committees; provides for the making
and approval of physical development plans and for the applications for
development permission.
This Act provides for the law relating to environmental management in Uganda
and the management of the environment for sustainable development.
The Act also establishes the National Environment Management Authority
as a coordinating, monitoring, regulatory and supervisory body for all
activities relating to environment; provides for emerging environmental
issues including climate change, the management of hazardous chemicals
and biodiversity offsets. It provides for strategic environmental assessment;
how to address environmental concerns arising out of petroleum activities
and midstream operations, management of plastics and plastic products.
The Act further establishes the Environmental Protection Force; provides
for enhanced penalties for offences under the Act.
5
Implementation Guide
The Land Act provides for the tenure, ownership and management of land
and it amends and consolidates the law relating to tenure, ownership and
management of land in Uganda.
This Act regulates the transfer of land and registration of titles in Uganda.
This Act provides for the law relating to local governments in line with the
Constitution and gives effect to the decentralisation and devolution of
functions, powers and services. It provides for decentralisation at all levels of
local governments to ensure good governance and democratic participation
in, and control of, decision making by the people; it further provides for
revenue and the political and administrative setup of local governments;
and election of local councils.
1.5.8. Occupational Health and Safety Act, 2006, Act No. 9 of 2006
1.5.9. The Public Procurement and Disposal of Assets Act, 2003, Act No.1 of 2003
This Act establishes the Public Procurement and Disposal of Public Assets
Authority to formulate policies and regulate practices in respect of public
procurement and disposal activities. This Act is particularly relevant to public
funded projects.
This Act provides for the establishment of the Engineers Registration Board,
its powers and functions and provides for the registration of engineers.
This Act provides for the establishment of the Surveyors Registration Board,
its powers and functions and provides for the registration of surveyors.
This Act provides for the establishment of the Architects Registration Board,
defines the powers and functions of the board and provides for the registration
of architects.
6
Implementation Guide
This Act provides for the structure, organisation and functions of the police
force, a police disciplinary code of conduct, a Police Welfare Fund, a police
tender board among others. Under section 4 of the Act, the police are
mandated to among others enforce the laws of Uganda and to prevent
and detect crime in the society. As such, the police is an important body
in as far as investigation of offences under the Building Control Act, 2013
is concerned. Once the police have investigated any criminal matter, the
record of investigation is submitted to the Office of the Director of Public
Prosecutions who, under article 120 of the Constitution, is mandate to
prosecute criminal matters in courts of law.
The Act establishes the following institutions responsible for its implementation-
The institutional framework established under the Act is intended to ensure that
construction of buildings from planning to completion and later on maintenance is
done in a safe way and in harmony with the environment.
(c) one representative of the ministry responsible for water and environment;
(i) engineers;
(ii) architects;
7
Implementation Guide
(iv) surveyors;
(v) lawyers;
(g) a public health officer from the Ministry responsible for health;
(l) one person from the private sector nominated for appointment by the
Private Sector Foundation.
(e) to hear and determine appeals from persons dissatisfied with the
decisions of a Building Committee;
8
Implementation Guide
xii. an officer from the police department responsible for fire prevention
i. Town Clerk
9
Implementation Guide
• S.31 and Schedule 3 provide for the procedure of the Building Committees
including calling of meetings, quorum and decisions, minutes of the
meeting, validity of proceedings not affected by vacancy, disclosure of
interest by member, interalia.
10
Implementation Guide
• It follows from the above paragraphs, the Building Committee need not
have all the members referred to under section 28 of the Act in order to
conduct its affairs, presence of two thirds of the members is sufficient.
Section 32 of the Act establishes the office of the Building Control Officer (BCO).
The BCO is required to be appointed by the District Service Commission.
(c) to ensure that any instructions given by a Building Committee are complied
with;
(d) to inspect—
(e) to carry out regular inspection of completed buildings and any duty
assigned by the Building Committee.
The qualifications of BCOs and Assistant BCOs are prescribed under the
11
Implementation Guide
The Building Control Regulations 2020, clearly guides the Building Control
Officer in case of minor building works, and the Building Committee in the
case of other classes of buildings regarding proof of land ownership, that is to
say, land ownership may be proved by-
The Constitution and the Land Act, provide for the different forms of land
12
Implementation Guide
The Constitution
Clause (1) provides that Land in Uganda belongs to the citizens of Uganda and
shall vest in them in accordance with the land tenure systems provided for in
the Constitution.
Clause (3) provides for the land tenure system and states that land in Uganda
shall be owned in accordance with the following land tenure systems-
(a) customary;
(b) freehold;
(d) leasehold.
Clause (8) of article 237 protects the security of occupancy on land of lawful or
bonafide occupants on mailo land, freehold or leasehold land.
The Land Act, under Part II reechoes the land tenure system under article 237
of the Constitution and provides for a certificate of customary occupancy and
a certificate of occupancy for lawful and bonafide occupants (see sections
2-38 of the Land Act).
(a) customary;
(b) freehold;
(c) mailo;
(d) leasehold;
13
Implementation Guide
Under section 146 of the Registration of Titles Act, a proprietor of land may
appoint any person to act for him or her in dealing with his or her land
by signing a power of attorney. In such a case, where an application for a
building permit is submitted to the Building Committee by another person
not being the registered proprietor of the land, the Committee should
request for a power of attorney. The power of attorney must be clear as to
the extent of authority granted (see copy of power of attorney in Annex
2).
(i) Agreement
14
Implementation Guide
15
Implementation Guide
i. A building permit gives the developer permission to carry out building operations
on their property as defined in the Act.
ii. A person who carries out a building operation without a permit commits an
offence [BCA, Section 34(2)]
iii. A building permit is evidence that a building has been designed according to
building standards enshrined in the National Building Code, 2019.
i. Building operations are interpreted in the Act and are classified in Schedule 2 of
the regulations.
ii. “Minor building works” are interpreted in Section 2 of the Act and Form 1 of
Schedule 3 shall apply.
iii. Form 2 of Schedule 3 of the Regulations shall apply for all other operations not
falling under (ii) above.
Sections 2, 35, 39; Reg. 8, 19-23, 26, 36 Schedule 2, Schedule 3 – Forms 1&2,
Schedule 4
16
Implementation Guide
i. BCs shall establish a building control records system to track their operations
and decisions for purposes of accountability. An application to a BC is usually
the first step establishing a relationship between an owner of a building
development and the BC.
ii. Specific attention shall be given to reporting requirements by the NBRB as
prescribed in Form 5 – Part II of the Regulations
iii. For uniformity, the NBRB recommends the following format for application
reference: Parish Postcode/Year/Application Number i.e BP/cccc/20--/nnn
i. Ensure all required documents contain all design and construction information
as is necessary to arrive at proper and informed decisions regarding a particular
application
ii. BCs are advised to establish a mechanism to ensure or confirm authenticity of
17
Implementation Guide
i. The Building Committee has thirty days to either issue a building permit to the
applicant or to defer or reject the application.
ii. The Building Committee shall notify the Building Control Officer of its decision
18
Implementation Guide
i. Minor building works are interpreted in section 2 of the Act and are classified
as category C buildings
ii. Applications for minor building works shall be made to the Building Control
Officer as prescribed in Regulation 19 and Form 1 of Schedule 3 of the Regulations
iii. Engagement of professionals for minor building works is optional.
3.4. Transition
S54
Any building or building operation commenced before the coming into force of this Act
and which does not conform to the standards prescribed by this Act shall be adjusted so
as to bring it in conformity with this Act within a period prescribed by the Minister.
19
Implementation Guide
It is the responsibility of the Building Committee to prescribe how site operations shall
be undertaken as prescribed in Reg. 29
i. A developer may with the approval of the Building Committee erect temporary
builders sheds as prescribed by Reg. 30.
ii. The sheds shall be maintained in good order and condition at all times during
the building operations.
20
Implementation Guide
A person shall not commence any building operations without installing sanitary facilities
for personnel at the building site or at a reasonably close location as approved by the
Building Committee as prescribed by Reg.31
It is the function of the Building Committee to ensure that excavations are undertaken
safely as prescribed by Reg. 32
21
Implementation Guide
i. For purposes of these guidelines, only permitted building operations that have
been fully inspected shall be considered. Illegal and non-compliant building
operations shall be considered under a separate procedure.
ii. Applications are to be made on Form 9 – Part I or II - in schedule 3 of the
regulations, depending on the nature of occupation permit being sought;
whether temporary, partial or full.
iii. The professionals whose services were retained for the purpose of supervising
the construction of the building shall certify the application.
iv. The officer receiving application should confirm appropriateness of form used
and presence of all required documentation for the particular Occupation
Permit being sought.
v. Ensure the professionals authoring any documents possess a current practicing
certificate. The BCO shall contact the relevant Professional Registration Boards
for updated list of practicing professionals.
vi. Incomplete or improper applications shall be returned to the applicant on
presentation.
22
Implementation Guide
i. The BCO shall ensure that the building was built in conformity to the approved
plans.
ii. The BCO needs inspect the building works, inspection book and “As Built
drawings” to ensure that they do not deviate significantly from the drawings
submitted at the Building Permit stage or, if they do, procedures (regarding
necessary approvals) and standards were followed.
iii. Ensure all required documents contain all information necessary to arrive at
proper and informed decisions regarding a particular application
iv. BCs are advised to establish a mechanism to ensure or confirm authenticity of
documents or clearances from other agencies that form part of an application
23
Implementation Guide
24
Implementation Guide
25
Implementation Guide
26
Implementation Guide
27
Implementation Guide
28
Implementation Guide
29
Implementation Guide
30
Implementation Guide
A POWER OF ATTORNEY granted on the 10th day of October 2015 by …… of P.o Box
7 Kampala (hereinafter called “the Land Owner”) to …….. of P.o Box 18 Kampala (hereinafter
called “the Attorney”).
WHEREAS :-
(a) The Land Owner is the registered proprietor of land comprised in Block 10
Plot 15, Nabutiiti, Wakiso District (hereinafter called “the Land”).
(b) By a Joint Venture Agreement dated the _______ day of __________
(hereinafter called “the Agreement”), the Attorney and the Land Owner have agreed to
pursue a joint venture to construct and complete a residential housing development on
the Land (hereinafter called “the Project”).
(c) Upon completion of the Project, the Attorney is entitled to certain strata
units therein (hereinafter called “the Units”).
(d) Under the terms of the Agreement, the Land Owner was entitled to and did
assign all his rights, title interest benefits advantages permits, licences and remedies in
under or arising out of the Agreement to the Attorney.
(e) Under the terms of the Agreement, the Land Owner has agreed to execute
such agreements or deeds as may be required to procure the development of the Project.
The Land Owner has also agreed to transfer the Units to the Attorney or such other
purchaser of the Units as the Attorney shall direct and pursuant thereto will enter into any
options, agreements, deeds or documents as shall be necessary to enable the Attorney to
market and sell all of the Units.
Now, the Land Owner HEREBY APPOINTS the Attorney and each of the authorised officers
of the Attorney for the time being to be the true and lawful attorney of the Land Owner
with full power to substitute, appoint and discharge from time to time one or more
attorneys in the name of the Land Owner and on the Land Owner’s behalf to execute or
do all or any of the following acts, deeds and things :-
31
Implementation Guide
the removal of any soil thereon or therefrom and generally for the construction or
earthworks affecting in connection with, related to or arising from the Project and
to collect, receive and retain such licences, approval, permits or exemptions and to
give a good receipt or acknowledgement therefor.
2. To enter upon and take possession of the Land and to develop the Land for the
Project and to carry out all necessary building, engineering and other operations
on the Land to construct and complete the Project Building in accordance with
the planning permission, building plan approval and any other licences, approvals
or permits issued by any relevant competent authorities.
3. To apply for, obtain or secure all necessary governmental approvals, permits or
licences for the subdivision (including subdivision) of the Project Building.
4. To apply to the Registrar of Titles for the issue of separate condominium Certificates
of Title to the Project Building and for this purpose to sign, execute and lodge the
necessary applications at the land office.
5. To take and accept delivery of the duplicate condominium Certificates of Title or
other documents of title as soon as the same are issued by the Registrar of Titles
and to give good receipts therefor.
6. To deal with all other relevant government authorities for the purpose of negotiating
and obtaining the approval of any sale and purchase agreements entered or to be
entered into by the Attorney with any sub-purchaser in respect of the sale of the
Units as may be required under the law.
7. To sign any Caveats and Withdrawal of Caveats relating to the Land or Project
Building as the Attorney shall think fit and to register the said Caveats and
Withdrawal of Caveats with the Land Office.
8. To warn off and prohibit and if necessary proceed against in due form of law all
trespassers on the Land or the Project Building or any part thereof and to take
appropriate steps whether by action or otherwise to abate all nuisances.
9. To receive and give effectual receipts and discharges for all or any moneys which
shall or may come to the hands of the Attorney by virtue of the powers herein
contained which receipts shall exonerate the person or persons or corporation
paying such moneys from seeing to the application thereof or being responsible
for the loss or misapplication thereof.
10. To enter into and to sign, seal, execute and perfect as the Land Owner’s act and deed
and to deliver any contract, option, Sale and Purchase Agreement, conveyance,
assignment, transfer, restriction, lease, deed, instrument or assurance whatsoever
in respect of the Units.
11. To appear before any Registrar or other official appointed under any Act and
register any deed, assurance, contract, transfer or other document relating to the
Project and sale of the Units and to pay such fees and to complete any forms and
make any declaration which may be necessary for the registration thereof.
12. For the Land Owner and in his name to accept service of any writ of summons,
summons plaint, motion, petition or other legal process of any kind in respect of
the Project and sale of the Units and to appear and on the Land Owner’s behalf to
represent in any court and before all judges, magistrates or other judicial quasi-
judicial or administrative officers whosoever as the Attorney shall think fit.
32
Implementation Guide
13. In connection with any of the foregoing to appoint and engage any Advocate to
act for the Land Owner on his behalf for any of the purposes of these presents.
AND THE LAND OWNER HEREBY RATIFIES AND CONFIRMS AND PROMISES at all times
to allow, ratify and confirm all and whatsoever the Attorney shall lawfully do or cause to
be done by virtue hereof including anything which shall be done before revocation of this
Deed and the Land Owner declares that as against him and persons claiming under him,
anything which the Attorney shall lawfully do or cause to be done in pursuance of this
Deed after such revocation as aforesaid shall be valid and effectual in favour of any person
claiming the benefit thereof and acting in good faith who before the doing thereof shall
not have had express notice of such revocation and the Land Owner hereby agrees to
indemnify the Attorney against costs, charges, expenses and losses which the Attorney
may incur in the lawful execution of the powers hereby conferred upon the Attorney.
IN WITNESS WHEREOF the parties have appended their signature this _____ day of
________________2015.
Witness my hand
________________________.
33
Implementation Guide
34
Implementation Guide
35
Implementation Guide
36
Implementation Guide
37
Implementation Guide
S29, 33, 35 Architect: The title block should include the name of the Architect, their
registration number, his/her firm (if applicable), valid practicing certifi-
cate number, telephone and email contacts, the architect’s green stamp
signed and dated. These should be verified with the Architects Registra-
tion Board.
Reg. 5,9
All work should be designed by the Architect. Any plan with information
to the contrary/contact information of any person other purporting to
have designed or drawn the work other than the Architect should be
rejected.
Land Owner: Incase the applicant is not the land owner, include the
name, physical and postal address of the land owner and a statement of
legal relationship between applicant and land owner
Scales: Check that scales and annotation used conform to the minimum
prescribed by the relevant regulation and that information is legible.
(a) Location Plan: (i) These shall provide adequate information to enable location of
the site without need for further directions. Longitude and Lat-
itudes as determined by Google Maps/ Google Earth are a rec-
ommended method of locating property.
(ii) The surveyor’s report required by the regulations shall include
coordinates of the plot/land based on a system prescribed by
the Commissioner Surveys and Mapping.
(iii) Where house numbers have been allocated by the local author-
ity, these maybe used to facilitate location of the property.
(iv) The North Arrow shall be clearly visible. Key landmarks should
be indicated.
(b) Context or Block Plan (i) Should reflect all spatial features within and around the site that
place constraints on the site and/or influence the design of the
P 21 building
(ii) Such features include, existing and neighbouring buildings, ex-
tents of road reserves and other utility easements affecting the
site, location of connection points for utilities, etc. as applicable
to the building site
(iii) BCO to check that the site does not possess any characteris-
tics that make it a prohibited site and in case there are factors
that make the site risky for erection of a building that these have
been adequately mitigated
P 104 (iv) BCO/BC to check that the site does not possess any character-
istics that make it a prohibited site and in case there are factors
that make the site risky for erection of a building that these have
been adequately mitigated
(c) Site Plan (i) Site plans illustrate how the space available for development
on the site is to be utilised to provide a building that meets the
P 4 - 21, 60 Design Requirements in the Code, taking into account existing
constraints, and opportunities. A site plan shall therefore be
based on the information in the context plan.
38
Implementation Guide
P19
P20
39
Implementation Guide
(d) Floor Plans (i) Floor plans shall show the dimensions and purpose of every room or
part of the building
NBC: Part III, (ii) It is recommended that the BC requires the applicant to declare the
design population for the entire building development for ease of
P22 - 117
assessing adequacy of capacity of utilities/services to support the
expected population – which should be commensurate with the
floor space provided in the plans to avoid overcrowding.
(iii) Floor plans shall show the location and width of wall openings and
provide adequate information as to the type/purpose of the opening
to facilitate assessment of its appropriateness
P61, P91, P93, P94, P96, P97, (i) All rooms including auxiliary facilities shall conform to the minimum
P99, P102, P103, P106, P107 acceptable dimensions and floor area according to the occupancy
and population
(ii) The maximum population that can be accommodated in the build-
ing (design population) shall be derived from the floor area and oc-
Schedule 1 Table 4
cupancy(s) of the building development.
(iii) This capacity shall be the basis for sizing of related services such as
number of sanitary fittings and capacity of sewage treatment in-
stallations.
(iv) Dimensions of steps and stairs shall be appropriate to the occupan-
cy and design population of the building
(v) Note that the provision of escalators in any building does not waive
the requirement for stairs
P41-42, P63, P68 (vi) Appropriate banisters and/or guarding shall be provided for safety
at stairs, balconies and other areas where there are changes in level
(vii) Large, multi-storey and multi-occupancy buildings shall be protect-
ed from fire and its effects, designed and divided in accordance with
P48 the Code to maximise fire safety and be provided with appropriate
alternative means of escape in case of emergencies.
(viii) There shall be an adequate number of alternative egress means for
P43-45 a given building.
(ix) The location and distribution of such egress means as well as the
width of exits shall be in accordance with Code to ensure maximum
opportunity for safe and timely egress in emergencies
P40,P49, P52, P62, P65-66, P69, (x) Similarly, an adequate number of staircases or alternative means of
P72-85, P105, egress shall be provided commensurate with the height and capac-
ity of multi-storey buildings taking into account the capacity and
size at each floor
(xi) These shall be rationally distributed and provided with adequate
safety apparatus to mitigate fire spread while allowing for swift
egress.
(xii) Lifts systems shall be particularly protected against fire and its ef-
fects on occupants
P50-51
Accessibility standards Ensure that floor plans conform with accessibility standards in circula-
tion areas and sanitary facilities
40
Implementation Guide
(e) Elevations (i) Elevations should be adequate in number to show all significant
sides of the building
(ii) Typical features shown in elevations are the walls, openings and
roof. Details of external finishes shall be indicated on the elevations
(f) Sections (i) Sections should be adequate in number and location to show all
the significant elements and limiting heights to facilitate judge-
ment of the appropriateness and performance of the design
(ii) Typical areas or features to be shown in sections include founda-
tions, walls, floors and beams, openings and the fixtures therein
staircases, ramps, atriums, etc.
(iii) Ensure that sections truly and accurately represent the area where
they are shown to have been cut on the floor plans.
P24, P28, P64, P70, P93(c), (iv) Check that heights of rooms meet the minimum standards for the
P103(2)(a)-(d) & (g) occupancy type
(v) Check headroom/clearances beneath beams, stairs and ramps to
P26, P39, P41, ensure adequacy as per code or for the purpose intended
(vi) Materials of the different building elements shall conform to Part
IV of the Code as applicable.
(vii) In case of second hand materials and scenarios were the suitability
of a material for purpose is unknown or in doubt, appropriate test
certificates shall be attached to the application
P119 - 120
P111 – P117
(i) Buildings shall be lighted and ventilated in accordance with P111-P117
of the Code as a minimum.
(ii) Use door and window schedules as well as information on the plans
to ascertain the adequacy of lighting and ventilation in various
spaces.
(iii) Ensure effective/net glazed area of minimum 10% floor area for win-
P113 (1) dows of habitable rooms and note the necessary 5% incremental
glazed area increment where overhangs greater than 900mm (e.g.
canopies and balconies) exist.
(iv) Ensure a total openable area (for ventilation) of minimum 5% floor
P113(2) area of the room served including the permanent ventilation open-
ings
(v) Look out for windows with space opposite them that does not meet
P114 effective lighting and ventilation requirements and ensure such ar-
eas are corrected on the plans
(vi) Check that all soil water fitment spaces are adequately lit and ven-
tilated
(vii) In addition, check that effective cross ventilation has been provided
P115 with the opening to room volume ratio as prescribed by Code
(viii) For public buildings, ensure the total unobstructed area of venti-
P116 lation openings divided by the occupancy capacity gives adequate
ventilation per occupant.
(ix) Ensure that the distribution of the openings in the walls and/or roof
will provide effective air flow for the occupants
P117(a)
P116(d), P117(2)(b)
41
Implementation Guide
(h) Drainage plans: Storm, (i) Drainage plans shall be prepared in conformity with the National
Foul and Waste Water Building (Standards for Mechanical Installations in Buildings) Code,
2019 and The Public Health (Drainage and Sanitation) Rules.
(ii) Typical drainage features to be shown in the site plan include man-
holes, soil and waste pipes, connection to sewer or septic tank and
soak pits
(iii) Drainage features to be shown on ground floor plans include man-
holes, gulley traps, soil pipes, soil vent pipes, rain water pipes
(i) Boundary Wall Plan and Boundary walls shall conform to Paragraphs 19 and 20 of the building
Details standards.
P 19, 20
Environmental Consider- (i) Where the BC has adopted sustainable design practices, various pro-
ations visions of Part V of the Code may be applied to buildings.
(ii) Attention is specifically drawn to mandatory provisions of this part
for application especially in assessing site plans, floor plans, sections
and other design information.
42
Implementation Guide
Material types
NBC, Part III, Sec 16(8) Natural stone, clay bricks, structural timber, structural steel,
concrete blocks and plain or reinforced concrete form the
main construction materials for the structures commonly re-
ferred to as permanent.
Material strengths Design strength characteristics should be provided as these
influence the components to be designed for as well as the
NBC, Part III, Sec 16(9) sizes and types of building structures involved.
Reinforced Concrete
Materials design values The partial factors of safety for the various reinforced con-
crete ingredients shall be as specified in Part II of Schedule 7.
NBC, Part V, Sec 22(9)
Design properties & strength classes The design properties and strength classes for concrete,
including characteristic compressive strength of concrete for
NBC, Part V, Sec 22(10) the various grades are prescribed in Schedule 8.
Control of deformation
Final deflection Final deflection of all horizontal members shall not, in gener-
al, exceed the value
Deflection=Le/200;
NBC, Part V, Sec 23(2)
where,
43
Implementation Guide
For roof or floor construction supporting The deflection which occurs after the attachment of the
or attached to non-structural elements non-structural elements shall not exceed the value
including partitions and finishes likely to
be damaged by a large deflection Deflection=Le/350. Which should also be less than or equal
to 20mm
NBC, Part V, Sec 23(3)
where,Le = the effective span
calculated sag of a beam, slab or cantilever Shall not exceed span/250
subjected to quasi-permanent loads
General: Depth
NBC, Part IV, Sec 17(2) Shall be at depths equal to or greater than 1.0 metre
General: Geotechnical engineering tests Geotechnical testing ensuring stability and safety of buildings
for; and a guide to the classification and bearing capacities of sub
soils is shown in Schedule 5.
1) 2-3 stories, in low lying areas.
44
Implementation Guide
Raft foundation design The design of raft foundations shall be analogous to that of
inverted flat slabs, with the column loads known.
NBC, Part IV, Sec 20(2-8)
Pile foundation design (i) Based on static load tests, empirical or analytical calcula-
tion methods, the results of dynamic load tests
NBC, Part IV, Sec 21(1-7) (ii) Designed as either friction or end bearing piles.
(c) Columns details
45
Implementation Guide
Floor types Floors shall be reinforced concrete solid, ribbed (one way and
two way spanning e.g. waffle slabs) or hollow core block slabs
NBC, Part V, Sec 24(1)
Effective depth Shall not exceed the limits specified in Schedule 10.
NBC, Part V, Sec 24(2) Shall be considered as floor slabs subjected to imposed loads
applicable to the various occupancy classes as shown in
Schedule 2.
(h) Lift wells
46
Implementation Guide
Retaining
NBC, Part V, Sec 29(6) (b) stability of the wall (bearing resistance and resistance
against rotation and sliding);
(d) safety;
47
Implementation Guide
NBC, Part VI, Sec 31(2) (a) length/180, for cantilever beams,
48
Implementation Guide
NBC, Part VI, Sec 33(3) (a) for resistance of bolted connections gMb = 1.25
49
Implementation Guide
(h) Lift wells Void provisions in the slabs should be made to allow provision of
a lift –
Size of void to be recommended by specialist lift suppliers and
installers.
Framed columns and beams at every level strong enough to
withstand stresses induced from the lift movements up and
down the structure.
(i) Roof details
Forms shall be constituted by any or combination of among others;
trusses, girders, rafters,
NBC, Part VI, Sec60(1)
Loading considered designed to sustain the dead loads, imposed loads and wind
loads.
NBC, Part VI, Sec60(2)
recommended minimum roof specified in Part V of Schedule 15.
slopes for the various structures and
cladding materials
50
Implementation Guide
NBC, Part VII, Sec 66(4) (b) 1.80 metres: for roofs with concrete/clay tiles, incorporating
common rafters spaced at 0.60 metres, centre to centre; and
(c) 2.10 metres: for roofs with metal tiles, incorporating common
rafters spaced at 0.70 metres, centre to centre.
Connetions shall be firmly secured with either nails, screws, bolts and/or
timber connectors.
NBC, Part VII, Sec 66(3)
Purlins provision shall have a minimum dimension of 75 x 50 mm and shall be
spaced at distances not exceeding 1.20 metres centre to centre.
NBC, Part VII, Sec 66(5)
51
Implementation Guide
52
Implementation Guide
P14, Schedule 3
Description of Electrical Loads For buildings in Category A, the electrical engineer shall submit
a “Description of Electrical Loads” This shall include
• Luminance requirements
• Utility power connection for single phase load, three
phase load, 11KV load
• Heating, Ventilation and Air Conditioning (HVAC) re-
quirements
• Electrically operated accessories (gates, pumps etc)
• Fire Protection Provisions
• Provision of ICT (PABX, LADN, CCTV)
(a) mains and standby power sup- This shall form part of the electrical circuit drawing
ply;
Evaluate aspects such as extending utility power to site, over-
4,5, 14, 34, 35, 39-49, Schedule 3 head utility line clearances, space for transformers and related
switchgear, citing of standby power equipment, green standby
electrical power (e.g. photovoltaic systems)
(b) power reticulation; This shall complete the electrical circuit drawing
look out for electrical ducts, lift power supplies, power rooms(
sizes and locations) ,transformer room, generator houses or
canopies ( taking into account noise pollution), earthing and
lighting protection,
(d) small power layout; This shall be shown on the architectural drawing and shall show
the position of
- power socket outlets, distribution board, hot water
cylinders
- Communication sockets
- Security elements e.g. alarm keypad and intercom hand
sets
(e) fire protection; Power requirements shall be shown on the electrical circuit
drawing.
53
Implementation Guide
(f) private automatic branch ex- Power requirements shall be shown on the electrical circuit
change system (PABX); drawing.
P68 Positioning of the data sockets will be shown on the small pow-
er layout drawing
(h) closed circuit television (CCTV). Power requirements shall be shown on the electrical circuit
drawing.
54
Implementation Guide
General requirements The drawings shall contain the following where applicable:
stairways, ramps, guards & lifts (esp. for raised buildings); light-
ing, ventilation (all types); heating, fire safety (esp. for public
buildings), plumbing, sanitary fitments & drainage works
R 12
(those with piped water), firefighting, water supply, reticula-
tion and storage
- Water closets, showers, urinals & la- • Septic tanks and cesspools should be properly situated on
trine fitments the premises, well-constructed with approvals from NWSC
(proof should be availed).
NBC, Part III, Sec 24-26 • Their capacity should be in line with the planned building
usage
Part I, Table 1 (Schedule 2)
55
Implementation Guide
Lifts; Lift drawings shall show the lift shaft, lift control room, ma-
chine and pulley rooms
NBC, Part III, Sec145-151, 155-158
• All buildings 15 m or more above the ground shall have
lifts; lift installation and selection shall follow ISO 4190
parts 1 to 6. The lift construction shall comply with section
69 of the OSH Act, 2006
• Machine & pulley rooms for lifts - should be easily accessi-
ble, have adequate size and the door should be clear from
any obstacles
56
Implementation Guide
June 2020
57
Implementation Guide
TABLE OF CONTENTS
1.0 PROJECT DETAILS...................................................................................................................................4
2.0 DESCRIPTION OF WORKS.................................................................................................................4
3.0 PROJECT TEAM..........................................................................................................................................4
3.1 DEVELOPERS TEAM...........................................................................................................................4
3.2 CONSULTANTS TEAM........................................................................................................................ 5
3.3 CONTRACTORS TEAM......................................................................................................................6
4.0 BUILDING ARCHITECTURE................................................................................................................ 7
4.1 BUILDING ARCHITECTURE FOR CLASS A AND B BUILDINGS........................... 7
4.2 BUILDING ARCHITECTURE FOR CLASS C BUILDINGS.......................................... 18
5.0 CIVIL AND STRUCTURAL WORKS.............................................................................................. 19
5.1 CODES OF PRACTICE AND STANDARDS......................................................................... 19
5.2 BUILDING ELEMENTS..................................................................................................................... 19
5.3 DESIGN REPORT................................................................................................................................. 19
5.4 CIVIL AND STRUCTURAL WORKS IN CLASS A, B AND C BUILDINGS....... 20
6.0 BUILDING SERVICES........................................................................................................................... 26
6.1 MECHANICAL INSTALLATIONS.............................................................................................. 26
6.1.1 MECHANICAL INSTALLATIONS IN CLASS A AND B BUILDINGS.............. 26
6.1.2 MECHANICAL INSTALLATIONS IN CLASS C BUILDINGS................................ 29
6.2 ELECTRICAL INSTALLATIONS.................................................................................................. 30
6.2.1 ELECTRICAL INSTALLATIONS IN CLASS A, B AND C BUILDINGS....... 30
6.3 ICT INSTALLATIONS IN CLASS A AND B BUILDINGS............................................. 39
ANNEX 1: CLASSES OF BUILDINGS......................................................................................................... 42
58
Implementation Guide
1.2 Developer
1.4 Contractor
Class C
Renovations
Alterations
a) Contract Manager
b) Project Manager
c) Owners Engineer
d) Clerk of Works
_____________________________
59
Implementation Guide
a) Project Manager
b) Architect
d) Mechanical Engineer
e) Electrical Engineer
f) ICT Specialist
g) Quantity Surveyor
h) Resident Engineer
___________________________
___________________________
___________________________
___________________________
60
Implementation Guide
a) Contract Manager
___________________________
___________________________
___________________________
___________________________
61
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
a) Approved Plans
b) Building Permit
c) Demolition Permit
d) Hoarding Permit
e) Land Survey Report
f) Construction Drawings and Specifications
g) Supervision Agreements
h) NEMA Certificate
i) Traffic Impact Assessment
j) OSH Approval
k) ARB Project License Plate
l) Inspection Job Card
m) Site Instruction Book
n) Copies of relevant building codes
o) Contractor’s work programme
p) Relevant Insurance cover
q) Site Health and Safety Policy
r) Excavation Plan
s) Materials Test Certificates
t) Supervision Progress Reports
u) Site Meeting and Inspection Reports
v) Contractor’s Method Statement of Work
w) Unpriced Bills of Quantities
a) BC approval.
b) Health and safety.
c) Public convenience.
d) Public safety.
e) Building conditions during demolition.
f) Demolition method suitability.
a) Builders shed.
b) Location approved by BC.
c) Condition of sheds.
d) Notification by BC.
e) Security personnel accommodation compliance with public health, and
neighbours consent.
62
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
4.1.4 SUBSTRUCTURE
63
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
• masonry
• steel reinforcement
• aaggregate
• cement
• sand
• DPM
• anti-termite treatment
• backfill material
d) Site safety
e) Basements:
• lighting
• ventilation
• drainage
• accessibility
• fire protection
• surface finishes
• site safety
4.1.5 SUPERSTRUCTURE
• External Walls
• Internal walls
c) Room sizes
d) Natural lighting
e) Ventilation
f) Roofing
g) Flat roofs
h) Site safety
i. Canopy height
ii. Pavement width beneath canopy
iii. Materials of pavement
iv. Canopy width
v. Canopy condition
vi. Conformity with existing canopies
vii. Canopy drainage
viii. Water discharge to pavement
ix. Canopy soffit sealing
x. Canopy loading
xi. Canopy fireproofing
4.1.5.4 Balconies and Bay Windows Overhanging Streets (P38-P39, NBC Building
Standards)
a) Doors and windows not to open outwards.
64
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
k) Winders
• Width
• Rise
• Tread
• Headroom
• Winders
• Width
• Rise
• Tread
• Headroom
• Winders
• Width
• Rise
• Tread
• Headroom
• Winders
h) Balustrade strength
i) Provision of central handrail where stairway exceeds 2.4 m width
j) Stairway ventilation
k) Stairway lighting
l) Stairway materials fire safety compliance
65
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
• Gradient
• Width
• Distance from street boundary
b) Pedestrian ramp
• Gradient
• Width
• Walkway width
• Walkway kerb height
4.1.5.10 Staircases in Buildings Intended for Separate Occupation (P47, NBC Build-
ing Standards)
Means of escape:
a) Height of building (storeys /m)
4.1.5.12 Enclosure and Position of Lifts and Motor Rooms (P50, NBC Building Stan-
dards)
a) Motor room conditions.
b) Lift shaft smoke outlet position, area and fitting materials.
c) Motor room ventilation.
d) Domestic and public buildings lift enclosure materials.
66
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
a) Floors
b) Walls
c) Stairs
d) Ceilings
e) Doors
f) Windows
a) entrance halls,
b) passages,
c) staircases,
d) gangways and
e) other means of approach to public room or building.
67
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
a) Internal wall lining adequately resists fire spread over its surface(Fire Rat-
ing).
b) If ignited internal lining has reasonable fire growth rate or heat release
rate.
4.1.8.22 Owner to cover costs of alterations or additions required by notice issued un-
der the Building Code P88, NBS NBC Building Standards.
a) Lighting for shop part used as office to be according to Code 111 & 117.
b) Exemptions by Building Committee.
a) Provided more than 20 persons work in shops and offices at any one
time, provisions for public buildings and assembly buildings design ap-
ply as stated in Codes 59, 60 and 63-66 to the shops and office buildings.
68
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
4.1.11.1 Size of Rooms Intended to be Used as Dwellings (P102, NBC Building Stan-
dards)
69
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
4.1.11.2 Provision of Kitchens, Stores and Bathrooms for each Dwelling (P103, NBC
Building Standards)
4.1.11.3 Position of Blocks of Flats and Hotels (P104, NBC Building Standards)
4.1.11.4 Construction of Buildings of More than Two Storeys (P105, NBC Building
Standards NBS)
4.1.11.6 Facilities to be Provided for all Residential Rental Premises Tenants (P107,
NBC Building Standards)
4.1.12.7 Warehouse Lighting and Ventilation (P112, NBC Building Standards NBS)
70
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
a) Quality
b) Size
c) Material source
a) Quality
b) Size
a) Hardness
b) Durability
c) Combustibility
d) Maturity
e) Crushing Resistance
f) Size, Shape and Surface
4.1.13.10 Stresses in Brick and Block Walling (P127, NBC Building Standards)
a) Bearing Pressure
b) Special materials test results
a) Mix ratio.
b) Variational mix ratio authorised by competent person and approved by
Building Committee.
a) Component materials.
b) Mix ratios.
c) Presence of ash, slag, clinker or similar material in concrete.
d) Coke breeze not authorised as ingredient.
e) Results of Bearing Pressures on load bearing concrete.
4.1.13.14 Stresses in Wrought and Cast Iron (P131, NBC Building Standards)
a) Quality
b) Strength
c) Free from defects
d) Well seasoned
e) Protection from insects and vermin
f) Stress Test Results
g) Stress Test Results on timber columns
h) Special timber Stress Test Results
i) Timber column lengths not to exceed thirty times its diameter
a) Durability
b) Impervious to moisture
c) Ability to withstand wall loads and prevent wall movement
d) DPM Material
e) DPM thickness
71
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
b) Signed BC Notifications
c) Approved drawings copy on site
d) Building Permit copy
e) Request for inspection (Form 7)
f) Inspection notice by BC
b) Sustainability
• Environmental issues
• Resilience to natural disasters
c) Economy
d) Performance Requirements
• Energy efficiency
• Durability
• Life-cycle performance
• Occupant comfort
• Occupant safety
e) Safety
• Risk foresight
• Risk protection
• Health measures
• Safety measures
• Security measures
Fire protection
72
Implementation Guide
OUTCOMES
QUERY
(Use codes above. Pro-
ITEM No. DESCRIPTION RECTIFIED
vide comment where
(Y/N)
appropriate)
• As built drawings
• Certificates of service installations fitness
73
Implementation Guide
OUTCOMES
(Use codes above. Pro- QUERY REC-
ITEM No. DESCRIPTION
vide comment where TIFIED (Y/N)
appropriate)
Notes:
BCR - Building Control Regulations
NBC - National Building Code
Reg. - Regulation
74
Implementation Guide
In the design and supervision of the buildings, it is incumbent on the professional to state
the approved codes of practice and standards he used. For purpose of this booklet, he is
expected to use:
• The National Building Code 2019,
• Building Control Regulations 2020,
• The Standards by the Uganda National Bureau of Standards marked as US or US-
ISO and other marks and
• any approved and relevant documents in practice, such as the British Standards.
It is incumbent on the professional to specify the elements designed for, such as rein-
forced concrete; steel and other metals; masonry and clay products; timbers, composite
materials, plastics and any others.
The design and supervision must include all structural elements which must be added in
case they are not indicated in this booklet.
It is incumbent on the professional to prepare a design report which must include desir-
able aspects of professional structural design that ensures strength, safety and econo-
my as below.
75
Implementation Guide
jected,
ii) selecting a structural form which has low sensitivity to hazards considered,
iii) selecting a structural form and design that can survive adequately the acciden-
tal removal of an individual member or a limited part of the structure, or the
occurrence of acceptable localised damage,
iv) avoiding, as far as possible, structural systems that can collapse without warning
and
v) tying the structural members together.
f) The design report shall show that the structural design is/was based on the most
critical limit state (either the ultimate limit state or the serviceability limit state)
and a check should be included to show that the other limit state was not exceeded.
g) The ultimate limit states used shall show how the following have been achieved:
i) safety of the people and
ii) safety of the structure and its contents.
h) The ultimate limit state design shall show how the building/structure will
withstand:
i) loss of equilibrium of the structure or any part of it, considered as a rigid body,
ii) failure by excessive deformation, transformation of the structure or any part of it,
including supports and foundations,
iii) failure caused by fatigue and other time dependent effects and
iv) failure caused by the effect of earthquakes, segmental and overall robustness of
the structure.
i) The serviceability limit states shall show how the building/structure will as-
sure:
i) the functioning of the structure or structural members under normal use,
ii) the comfort of people and
iii) the appearance of the construction works.
j) The serviceability limit states shall show how the building/structure will
withstand/resist:
i) deformation and displacements which affect the appearance or effective use of
the structure or cause damage to finishes or non-structural elements,
ii) vibrations which cause discomfort to people, damage to the structure or to the
materials it supports, or which limit its functional effectiveness,
iii) damage, including cracking, which is likely to affect appearance, durability or
the function of the structure adversely,
iv) observable damage caused by fatigue and other time dependent effects and
v) damage caused by earthquakes.
k) The design report shall show the design philosophy that includes or fulfills:
i) idealisation of the structural elements or the structure, their connectivity and
their load path,
ii) boundary conditions that are to be imposed onto the structure and to the indi-
vidual structural elements,
iii) material properties,
iv) weather conditions,
76
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
5.4.1.1 a) Approved civil and structural engineering plans, drawings and dia-
grams Geotechnical Survey Report
b) Topological Survey Report
c) Structural design report with calculations to prove adequate
strength, safety and economy in all the structural elements
d) Excavation Plan where applicable
e) Detailed methodology for temporary support, where needed
f) Specifications covering all civil and structural works
5.4.2.1 Civil or Structural engineering plans, drawings and diagrams shall contain
the following, where applicable
a) Excavation details
b) Foundation details
c) Column details
d) Beam details
e) Beam-Column connections
f) Slab details
g) Staircases
h) Ramps
i) Lift wells
j) Roof details
k) Retaining structural details
5.4.2.2 Civil or Structural engineering plans, drawings and diagrams shall be drawn
to suitable scales but not smaller than 1:100, 1:50, 1:20, 1:5, 1:2 or 1:1
5.4.2.4 Works executed in accordance with the designed and approved plans
77
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
5.4.3.1 Appropriate structural forms, systems and materials used in different parts
of the building e.g. reinforced concrete, pre-stressed concrete, steel, masonry
and timber etc
78
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
• placement of reinforcement
• inspection date
• concreting date
• placement of reinforcement
• inspection date
• concreting date
iii) Columns
• placement of reinforcement
• inspection date
• concreting date
• placement of reinforcement
• inspection date
• concreting date
• Erection date
• Inspection date
• Cladding date
• Erection date
• Inspection date
• Cladding date
79
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
5.4.13.1 Foundations
a) Appropriate foundation designed and provided
b) The approved foundation design is in agreement with the precise
soil conditions
c) The approved foundation design is not practicable and therefore
there is need to review the design. The amendments made on site
are satisfactory or they require approval of the BC. Where BC ap-
proval it required, it has been obtained prior to continuation of the
works.
d) Adequate foundation to sustain both combine dead and imposed
loads and transmit the loads without causing failure or impairing
the structure.
e) Foundation is safe from the aggressive environment such as
chemicals
f) Foundation at a depth equal or greater than 1m to protect the
building against swelling, shrinking and erosion of the sub-soil.
g) Setting out of foundation of the works properly executed
h) Foundations excavated and level pegs for concreting.
i) Foundations concreted, erecting or otherwise, depending on type
and material used (concrete, steel, etc).
5.4.13.4 Staircases
a) Staircase constructed in accordance with approved plans
b) Adequate reinforcement provided
c) Adequate formwork provided
d) Quality of materials examined through material testing and ap-
proval
e) Identified defects corrected and their impact on the building as-
certained
80
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
5.4.13.7 Roof
a) Roof structure constructed in accordance with approved plans
b) Roof plates are properly bolted to the ring beam and that the raf-
ters are connected to the plate by bolts or acceptable connectors.
c) Appropriate roofing sheets used
d) Quality of materials examined through material testing and ap-
proval
e) Identified defects corrected and their impact on the building as-
certained
f) Appropriate gutters, drop pipes and roof drainage installed
g) Erection, connection, jointing or otherwise, depending on material
and type used (steel, timber, etc) properly executed
h) Waterproofing valleys and any other surfaces provided
81
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.1.1.2 WATER SUPPLY AND DISTRIBUTION (P4-P23, NBC Standards for Mechan-
ical Installations)
6.1.1.3.3.1 Submission to NWSC the disposal plan from septic tank, dip pipes. Examina-
tion of tank ventilation.
82
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.1.1.3.4.1 Cesspool not situated within 2m of any spring, well stream of water.
6.1.1.3.4.3 Cesspool capacity determined by Building Committee to store soil for one
month at 135 litres per day.
6.1.1.4.3 SMOKE DETECTOR CONTROL (P95, NBC Standards for Mechanical Instal-
lations)
6.1.1.4.3.1 Air handling system to incorporate smoke detector control when required.
6.1.1.4.4 EXHAUST DUCTS AND OUTLETS (P96, NBC Standards for Mechanical In-
stallations)
6.1.1.4.5.1 In residential occupancy, air from one suite not to circulate in any other suite.
6.1.1.4.5.3 Public corridor should not be part of supply return or exhaust air system serv-
ing adjuring areas.
83
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.1.1.4.6.5 Hose reels for firefighting installed in all building of more than 250 m2.
6.1.1.4.6.6 Hydrant bonnet colour coded Green orange and red to show discharge rate.
6.1.1.4.6.8 Hydrant to provide at least 300m hose 16mm internal diameter nozzle.
84
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.1.2.2 WATER SUPPLY AND DISTRIBUTION (P4-P23, NBC Standards for Mechan-
ical Installations)
6.1.2.3.3.1 Submission to NWSC the disposal plan from septic tank, dip pipes. Examina-
tion of tank ventilation.
Notes:
NBC - National Building Code
85
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.2.1.2.1 SUB-STATION AND SWITCH ROOM (P4, NBC Standards for Electrical In-
stallations)
Floor level of sub-station is above the highest flood level of the locality.
86
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.2.1.2.4 DUCTS FOR UNDERGROUND CABLES (P26 and P27, NBC Standards for
Electrical Installations)
• Switchboards for the control of equipment rated at 240 V/415 V are stand-
ing, of uniform height, flush mounted and totally enclosed with a rigid
frame.
• Each switchboard is controlled by a suitable isolating switch or circuit
breaker.
• The arrangement of the switchboard is such that:
i) all parts which may have to be adjusted or handled are readily ac-
cessible,
iii) conductors that are not arranged for connection to the same sys-
tem are kept well apart and can readily be distinguished and
iv) all bare conductors are placed and protected to prevent accidental
short circuits.
87
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
• Switchboard with exposed bare conductors not located in an area set apart
for the purpose, is suitably enclosed.
• A clear passageway has been provided for exposed bare conductors.
• Insulating stands or screens have been provided.
6.2.1.3.7 EXCAVATION FOR UNDERGROUND CABLES (P32, NBC Standards for Elec-
trical Installations)
88
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.2.1.3.8 LAYING UNDERGROUND CABLES (P24, P25, P27, P28, P29 and P31, NBC
Standards for Electrical Installations)
• The feeder pillar is a “dwarf type” tailless unit, that is weatherproof, of ro-
bust construction, with hinged lockable doors, mounted on a firm base
and protected from ingress of rainwater, vermin or termites or other
danger within the enclosure.
• The fuse ways are clearly identified.
6.2.1.4.1 DISTRIBUTION BOARDS AND CONSUMERS UNITS (P5, NBC Standards for
Electrical Installations)
6.2.1.4.2 LIGHTS
89
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
• Single phase socket outlets are 3 pin rectangular, shuttered, unless oth-
erwise approved, with the third pin effectively earthed.
• Three phase socket outlets are of 4 pin scraping earth pattern.
• Three phase with neutral outlets are of 5 pin scraping earth pattern.
• Socket outlets are switched type unless otherwise approved.
• RCD protected socket outlets are installed in wet areas.
• The water heater is the only equipment connected to the circuit, for wa-
ter heaters with a capacity of 15 litres or more.
• The flexible cord of the water heater is heat resistant.
• The water heater has a 20 A Double Pole switch and an overheat protec-
tion cut-out.
The tests below were carried out on the complete installation and on each
circuit.
vi) Polarity
• The photovoltaic panels are installed at a point lower than the highest
point of the building.
• The support frame of the PV panels has a short lightning rod which is the
highest point of the building.
• The photovoltaic panels support structure is durable and weather and cor-
rosion resistant.
• The photovoltaic panels structure is securely fixed.
90
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.2.1.6.4 ROOF MOUNTING OF PV PANELS (P44, NBC Standards for Electrical In-
stallations)
• Ground mounted PV panels are well supported, fenced and not mount-
ed closer than 800 mm from the ground.
• A controller is installed.
• The rated capacity of the controller can handle the maximum short cir-
cuit current from the PV array, and the maximum load.
• The controller and circuit breakers or fuses bear the manufacturer’s PV
quality mark.
• The controller has a warning and remote alarm (if installed in a room that
is not used).
6.2.1.6.8 INVERTER
6.2.1.6.9 CIRCUITS OF SOLAR PV SYSTEMS (P48, NBC Standards for Electrical In-
stallations)
• The correct type of cables are used for the DC and AC installation and
they are correctly labelled and colour coded.
• The rated current carrying capacity at 35°C is not exceeded.
• Minimum cross section area of the conductors is 2.5 mm2.
• The cables from the solar PV panels are tied to the array frame, for a roof
mounted installation.
• The cables are installed appropriately.
91
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
• The voltage across any system component is not less than 5% of the bat-
tery terminal voltage, and not less than 10.5 V.
• The voltage drop between the PV panels and batteries does not exceed
1.0 V or 5%, measured at maximum charging current.
6.2.1.6.14 UNDERGROUND CABLES AND CONDUITS (P63, NBC Standards for Electri-
cal Installations)
• Underground cables are at least 600 mm below the surface and are
clearly marked.
• Underground cables are used across all areas with vehicular traffic
• The underground cables and conduits can withstand vertical loads.
• Suspended cables are mounted so that the lowest point is at least 2700
mm above ground level.
• Cables are suitably held in position.
• Ultra violet resistant cables are used outdoors.
• Attachments of cables or conduit are made with appropriate fasteners.
• Cable holes through the roof are drilled at the top of corrugations, sealed
and waterproofed with ultra violet-resistant silicon sealant or its equiv-
alent.
• Cables passed through roofs are contained in roof-entry boxes.
• Cables fixed through or passing through flammable are shielded in
non-flammable conduits.
• Fittings are fastened to suitable supports.
• Standard switches for 240 VAC are not used as an alternative to special
switches for 12 VDC, 24 VDC and 48 VDC, except as approved.
• All switches are rated at twice their expected load current.
• All switches include a clear visual indication of their state.
• dual supply, indicating the isolation point for the solar PV system and the
mains power supply,
• live DC cable,
• PV junction boxes and
• battery enclosure.
92
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
6.2.1.6.20 TESTING OF SOLAR PV SYSTEM (P55, NBC Standards for Electrical Instal-
lations)
The tests below have been carried out on the DC side of the solar PV instal-
lation.
d) Solar irradiance.
e) Insulation resistance.
b) Batteries, 1 year.
c) PV modules, 5 years.
e) Controller, 3 years.
f) Inverter, 3 years.
v) in lieu of vision between an inner room and its associated access room
or
• The fire detection and alarm system includes manual call points and
point detectors.
• There is a fire alarm control and indicating panel.
• There is a zone plan next to the fire alarm control and indicating panel.
• The fire detection and alarm system has been tested.
93
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
Notes:
NBC - National Building Code
94
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
d) Access Control.
• Major buildings with essential ICT rooms have diesel generators providing
standby power with an output of at least 1½ to 2 times the calculated load.
• If the generator is to supply other loads, this is allowed for.
• The generator has an outdoor diesel tank with at least 72 hours capacity.
• UPS installations of greater than 50 kVA and with long discharge time are
located in a dedicated UPS and battery room.
• The UPS and battery room has a cooling system.
• The UPS and battery room with a high load level of up to 1500 kg/m2 is
located in the basement of the building.
• The battery room is ventilated.
95
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
• ICT rooms and conduit paths for IT cables are located at a safe distance
from installations which emit electric fields.
• All cable penetrations for EMC cables are limited to a small area of the wall.
• Separate conduit paths or racks are installed for electric power supply, ge-
neric cabling and patch cords in server rooms, Equipment Rooms (ERs)
and Telecommunication Rooms (TRs).
• In larger server rooms, telephony/data cables are laid on racks beneath the
ceiling and power cables are laid on racks beneath a raised floor.
• Cable installations beneath raised floors do not block circulation of cooling
air.
• The height of the raised floor is a minimum of 400 mm.
• The sub-floor of the raised floor was lowered so that the raised floor is at the
same height as the floors in adjacent rooms.
• The raised floor can withstand the weight of the ICT equipment.
• If a raised floor could not be installed because of limited ceiling height,
cooling racks and chambers have been installed.
• All operating computer equipment cables, distribution networks cables
and backbone cables are installed on racks accessed from the front.
• The smallest clearance at all surfaces on racks and cabinets where access
is required is 1200 mm.
• Telephone cables are high conductivity copper conductors of 3 kg or 9 kg
per mile weight and are polythene insulated PVC sheathed overall.
• Telecommunication cables have surge protection installed and are
earthed.
• Outdoor cables are laid in conduit. If more than one cable is installed in a
conduit, these are pulled simultaneously.
• Manholes are provided for accessing the cables. Distances between man-
holes are short.
• The bottom of the trench in which the conduit is laid is free from stones
and sharp edges.
• The foundation of the trench in which the conduit is laid is at least 100 mm
deep and is composed of appropriate fill material.
• The area where the conduit lies is appropriately backfilled.
• Cable entry is through rooms that are a safe distance from power cables
or transformers, have easy access to the pathway to the ICT room and have
floor drains.
• All cabling that penetrates fire barriers is fireproofed.
• All cables are labelled.
• Trunking or conduit containing signal cables and power cables cross each
other at right angles.
• There is a free space of 1200 mm between all rack surfaces to which access
is required.
• ICT rooms containing active equipment are not used as store rooms.
• Store rooms containing inflammable materials are not located adjacent
to ICT rooms.
• Water pipes running through ICT rooms are for supply of cooling installa-
tions only.
• Floor drains in ICT rooms are fitted with non-return valves.
• Humidity sensors are installed in floors close to cooling units and near wa-
ter pipes running through the ICT room and drains in ICT rooms.
• Water pipes running through ICT rooms and pipes serving cooling units in
ICT rooms are insulated. The pipes are at the same earth potential as the
ICT installations.
• ICT rooms are air tight.
• An early detection fire detection system is installed in ICT rooms.
• Fire extinguisher systems are installed in ICT rooms.
• The minimum ceiling height in ICT rooms is 2600 mm from the floor to the
underside of cable racks and light fittings.
• There is at least 400 mm clearance from the tops of cable racks for patch
cables, to the underside of any ceiling mounted installation in ICT rooms.
• Lights are installed to illuminate the outsides, insides and between racks.
• Emergency lighting is installed.
• The light intensity on the horizontal plane is 500 – 800 lux, and on the ver-
tical plane is 200 lux.
96
Implementation Guide
OUTCOMES
(Use codes
QUERY RECTIFIED
ITEM No. DESCRIPTION above. Pro-
(Y/N)
vide com-
ment where
appropriate)
• Floor coverings in ICT rooms are earthed. The resistance between any point
in the floor covering and earth is between 1 and 10 MΩ.
• Racks, cabinets, chassis, ventilation installations, room cooling units, pipes,
cable racks and floors of ICT rooms have the same earth potential.
• All ICT rooms have their own earth rail for connecting the conductive struc-
tural and equipment surfaces.
• There is a dedicated mesh earth bonding network in essential ICT rooms.
• In small ICT rooms where no mesh earth bonding network is installed, an
insulated earth cable is provided.
• Patch panels are earthed appropriately.
6.3.13 CCTV
Notes:
NBC - National Building Code
97
Implementation Guide
Class A Building: Buildings with high social impact or located in sensitive ecosystem.
Class B Buildings
Class C Buildings