MIDC has around 300 acres of land immediately behind the available waterfront,
on top of hill which is 80m above the sea level. This shall be used for setting up
industries and the proposed Port shall serve for these industries.
Please
lease note that MIDC reserves the right to accept or reject any EOI at any stage
without providing any reasons.
3
3. Guidelines for EOI
3.1 Introduction to EOI
EOI:
MIDC invites proposal from reputed Consultants for preparation of DPR, detailed
scope of consultant defined in Annexure I.
3.4 Amendments
At any time prior to the deadline for submission of EOI, MIDC may, for any
reason, whether at its own initiative or in response to clarifications requested
by any Interested Party, modify the REOI document by the issuance of
addendum/ corrigendum. Any addendum / corrigendum thus issued shall be
part of the REOI and shall be posted on the MIDC
website:www.midcindia.org
www.midcindia.org.
4
3.5 Important Timelines for EoI
S. Milestones Envisaged Schedule
No.
1 Start date for downloading the REOI 01/03/2024
2 Pre- EOI Meeting 16/03/2024
3 Last date for receiving Queries/clarifications 31/03/2024
4 MIDC responses on queries 15/04/2024
5 Last Date for submission of EOI along with 01/05/2024
detailed techno commercial proposal
In order to enable MIDC meet the target dates, Interested Parties are requested
to respond expeditiously to clarifications, if any, requested during the process.
MIDC will adhere to the above schedule to the extent possible. MIDC, however,
reserves the right
ht to modify the same. Intimation to this effect will be posted on
the Official Website:www.midcindia.org
www.midcindia.org
5
4. Project Information
4.1 Project location and Area details
Connectivity Distance
Railway Station 16 Kilometers
Road NH66 (Mumbai-Goa Highway)- 25 Kilometers
Coastal Highway – 5 Kilometers
Airport Ratnagiri Airport – 25 Kilometers
Inland Container Depot Mumbai- 350 km
Port Mumbai - 350 Kms (Major Port)
Mirya Port- 2Kilometer
State Highway SH 4 – 2 Kilometers (Ratnagiri – Dapoli- Alibaug)
6
5. Annexure-II: Detailed Scope of Work of Consultant
Stage 1: Inception
This stage shall comprise initial data collection and review, site visit and
associated meetings, initial risk assessment. Consultant shall prepare and
submit Inception Report.
Stage 5: Studies
Based on agreed layout at stage 4, Consultant shall carry out Numerical
modeling studies comprising tidal stream modeling, wave modeling and
sediment transport modeling
modeling,, shoreline changes, dredging and disposal to
assess the impacts of proposed dredging works and assess the ma maintenance
intenance
dredging requirements and fast time navigation simulation studies. Consultant
shall prepare and submit detailed report for each of the studies indicated
above.
Consultant shall prepare detailed project report which shall include agreed
traffic study, hinterland study, site investigation reports, layout, model
7
studies,, site data, design findings, bill of quantities and tentative costing for
the proposed port development.
Stage 8: Approvals
Any approvals required for Port development from Authorities like MMB,
Electricity Board,, municipality, water department etc shall be taken care by
MIDC.
6. Annexure-II: Timelines