0% found this document useful (0 votes)
10 views116 pages

V1 Chap4 4 Runoff Conveyance

Uploaded by

Ahmadshah Mosavi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views116 pages

V1 Chap4 4 Runoff Conveyance

Uploaded by

Ahmadshah Mosavi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 116

Runoff Conveyance

Check Dam (CD)

Practice Description
A check dam is a small barrier or dam constructed across a swale, drainage ditch or other
area of concentrated flow for the purpose of reducing channel erosion. Channel erosion is
reduced because check dams flatten the gradient of the flow channel and slow the
velocity of channel flow. Most check dams are constructed of rock, but hay bales, logs
and other materials may be acceptable. Contrary to popular opinion, most check dams
trap an insignificant volume of sediment.

This practice applies in small open channels and drainageways, including temporary and
permanent swales. It is not to be used in a live stream. Situations of use include areas in
need of protection during establishment of grass and areas that cannot receive a
temporary or permanent non-erodible lining for an extended period of time.

Planning Considerations
Check dams are used in concentrated flow areas to provide temporary channel
stabilization during the intense runoff periods associated with construction disturbances.
Check dams may be constructed of rock, logs, hay bales or other suitable material,
including manufactured products. MDOT Drawing ECD-4 at the end of this practice
shows the typical application of check dam structures. Most check dams are constructed
of rock. Rock may not be acceptable in some installations because of aesthetics;
therefore, alternative types of check dams need to be considered.

Rock check dams


Rock check dams (Figures CD-1 and CD-2) are usually installed with backhoes or other
suitable equipment, but hand labor is likely needed to complete most installations to the
quality needed. The rock is usually purchased, and some locations in the state may not
have rock readily available. The use of rock should be considered carefully in areas to be

4-117
Runoff Conveyance

mowed. Some rock may be washed away during heavy rain events and should be
removed before each mowing operation. Additional installation drawings are provided at
the end of this practice as MDOT Drawings ECD-8 and ECD-9.

Log check dams


Log check dams (Figure CD-3) are more economical from a materials cost standpoint
since logs can usually be salvaged from clearing operations. The time and labor required
would be greater for log check dams. Increased labor costs would offset the reduced
material costs. Log check dams would not be permanent but may last long enough to get
grass linings established.

Hay bale check dams


Check dams constructed of hay bales (Figure CD-4) have the shortest life of the materials
discussed and are only used as a temporary means to help establish a channel to
vegetation. MDOT Drawing ECD-5 is provided at the end of this practice and shows
more specifics for hay bale check dams. MDOT Drawing ECD-6 shows typical details
for a straw wattle ditch check as an alternative to hay bale check dams. Hay bale check
dams should not be used where permanent watercourse protection is needed and should
be used only in concentrated-flow areas where only minimal runoff occurs.

Without proper installation, which is rarely done, hay bale check dams always fail.

Figure CD-1 Profile of Typical Rock Check Dams

Check dams should be planned to be compatible with the other features such as streets,
walks, trails, sediment basins and rights-of-way or property lines. Check dams are
normally constructed in series, and the dams should be located at a normal interval from
other grade controls such as culverts or sediment basins.

4-118
Runoff Conveyance

Figure CD-2 Cross Section of Typical Rock Check Dam

Figure CD-3 Typical Log Check Dam

4-119
Runoff Conveyance

Figure CD-4 Typical Hay Bale Check Dam


(NOTE: Without proper installation, which is rarely done, hay bale check dams always fail.)

Design Criteria and Installation


Formal design is not required. The following limiting factors should be adhered to when
designing check dams.

Drainage Area
Ten acres or less (rock or logs).

Maximum Height
Two feet when drainage area is less than 5 acres.

Three feet when drainage area is 5 to 10 acres.

Depth of Flow
Six inches when drainage area is less than 5 acres.

Twelve inches when drainage area is 5 to 10 acres.

The top of dam, perpendicular to flow, should be parabolic. The center of the dam should
be constructed lower than the ends. The elevation of the center of the dam should be
lower than the ends by the depth of flow listed above.

Side Slopes
2:1 or flatter.

Spacing
Elevation of the toe of the upstream dam is at or below elevation of the crest of the
downstream dam.

4-120
Runoff Conveyance

Keyway
The rock or log check dam should be keyed into the channel bottom and abutments to a
depth of 12 to 24″. The keyway width should be at least 12″. The keyway is to prevent
erosion around the end of and beneath the dam. Hay bale check dams should be
embedded into the soil at least 3″.

Rock Check Dams


Rock check dams should be constructed of durable rock riprap. Rock material diameter
should be 2″ to 15″.

In soils where failure by piping of soils into the rock is likely, a geotextile will be used as
a filter to separate the soils from the rock. Geotextile should conform to the requirements
of type I geotextile in Table CD-1.

Table CD-1 Requirements for Nonwoven Geotextile

Property Test Class I Class II Class III Class IV 1


method
2
Tensile strength (lb) ASTM D 4632 180 minimum 120 minimum 90 minimum 115 minimum
grab test

2
Elongation at failure (%) ASTM D 4632 ≥ 50 ≥ 50 ≥ 50 ≥ 50

Puncture (pounds) ASTM D 4833 80 minimum 60 minimum 40 minimum 40 minimum

Ultraviolet light ASTM D 4355 70 minimum 70 minimum 70 minimum 70 minimum


(% residual tensile strength) 150-hr exposure

Apparent opening size ASTM D 4751 As specified As specified As specified As specified


3 3 3 3
(AOS) max. no.40 max. no.40 max. no.40 max. no.40

Permittivity sec–1 ASTM D 4491 0.70 minimum 0.70 minimum 0.70 minimum 0.10 minimum

Table copied from NRCS Material Specification 592.

1 Heat-bonded or resin-bonded geotextile may be used for Classes III and IV. They
are particularly well suited to Class IV. Needle-punched geotextile is required for all
other classes.
2 Minimum average roll value (weakest principal direction).
3 U.S. standard sieve size.

4-121
Runoff Conveyance

Site Preparation
Determine location of any underground utilities.

Locate and mark the site for each check dam in strategic locations (to avoid utilities and
optimize effectiveness of each structure in flattening channel grade).

Remove debris and other unsuitable material that would interfere with proper placement
of the check dam materials.

Excavate a shallow keyway (12″-24″ deep and at least 12″ wide) across the channel and
into each abutment for each check dam.

Materials Installation
As specified, install a non-woven geotextile fabric in the keyway in sandy or silty soils.
This may not be required in clayey soils.

Construct the dam with a minimum 2:1 side slope over the keyway and securely embed
the dam into the channel banks. Position rock to form a parabolic top, perpendicular to
channel flow, with the center portion at the elevation shown in the design so that the flow
goes over the structure and not around the structure.

Erosion and Sediment Control


Install vegetation (temporary or permanent seeding) or mulching to stabilize other areas
disturbed during the construction activities.

Construction Verification
Check finished size, grade and shape for compliance with standard drawings and
materials list (check for compliance with specifications if included in contract
specifications).

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate check dam will not function as


intended. Change in plan will be needed.

Materials specified in the plan are not available.

Maintenance
Inspect the check dam for rock displacement and abutments for erosion around the ends
of the dam after each significant rainfall event. If the rock appears too small, add
additional stone and use a larger size.

Inspect the channel after each significant rainfall event. If channel erosion exceeds
expectations, consult with the design professional and consider adding another check dam
to reduce channel flow grade.

4-122
Runoff Conveyance

Sediment should be removed if it reaches a depth of ½ the original dam height. If the area
behind the dam fills with sediment, there is a greater likelihood that water will flow
around the end of the check dam and cause the practice to fail.

Check dams may be removed when their useful life has been completed. The area where
check dams are removed should be seeded and mulched immediately unless a different
treatment is prescribed. In some instances check dams should be left as a permanent
measure to support channel stability.

References

BMPs from Volume 1

Chapter 4
Temporary Seeding (TS) 4-103

MDOT Drawing ECD-4

Ditch Check Structures, Typical Applications and Details 4-124

MDOT Drawing ECD-5

Temporary Erosion, Sediment and Water Pollution Control 4-125


Measures, Silt Fence and Hay Bale Ditch Check

MDOT Drawing ECD-6

Details of Erosion Control Wattle Ditch Check 4-126

MDOT Drawing ECD-7

Details of Erosion Control Silt Dike Ditch Check 4-127

MDOT Drawing ECD-8

Rock Ditch Check 4-128

MDOT Drawing ECD-9

Rock Ditch Check with Sump Excavation 4-129

MDOT Drawing ECD-20

Details of Erosion Control Sandbag Ditch Check 4-130

4-123
Runoff Conveyance

4-124
Runoff Conveyance

4-125
Runoff Conveyance

4-126
Runoff Conveyance

4-127
Runoff Conveyance

4-128
Runoff Conveyance

4-129
Runoff Conveyance

4-130
Runoff Conveyance

Diversion (DV)

Practice Description
A diversion is a watercourse constructed across a slope consisting of an excavated
channel, a compacted ridge, or a combination of both. Most diversions are constructed by
excavating a channel and using the excavated material to construct a ridge on the
downslope side of the channel. Right-of-way diversions and temporary diversions are
sometimes constructed by making a ridge, often called a berm, from fill material.

This practice applies to sites where stormwater runoff can be redirected to permanently
protect structures or areas downslope from erosion, sediment, and excessive wetness or
localized flooding. Diversions may be used to temporarily divert stormwater runoff to
protect disturbed areas and slopes or to retain sediment on-site during construction.

Perimeter protection is sometimes used to describe both permanent and temporary


diversions used at either the upslope Water Bar
or downslope side of a construction
area.

Right-of-way diversions, sometimes


referred to as water bars, are used to
shorten the flow length on a sloping
right-of-way and reduce the erosion
potential of the stormwater runoff.

4-131
Runoff Conveyance

Planning Considerations
Diversions are designed to intercept and carry excess water to a stable outlet.

Diversions can be useful tools for managing surface water flows and preventing soil
erosion. On moderately sloping areas, they may be placed at intervals to trap and divert
sheet flow before it has a chance to concentrate and cause rill and gully erosion. Simple
water bars illustrate this concept (Figure DV-1).

Diversions may be placed at the top of cut or fill slopes to keep runoff from upgradient
drainage areas off the slope. Diversions are also typically built at the base of steeper
slopes to protect flatter developed areas that cannot withstand runoff water from outside
areas. They can also be used to protect structures, parking lots, adjacent properties, and
other special areas from flooding.

Diversions are preferable to other types of man-made stormwater conveyance systems


because they more closely simulate natural flow patterns and characteristics. Flow
velocities are generally kept to a minimum. When properly coordinated into the
landscape design of a site, diversions can he visually pleasing as well as functional.

As with any earthen structure, it is very important to establish adequate vegetation as


soon as possible after installation. It is usually important to stabilize the drainage area
above the diversion so that sediment will not enter and accumulate in the diversion
channel.

Figure DV-1 Water Bar

4-132
Runoff Conveyance

Design Considerations
Location
The location of the diversion should be determined by considering outlet conditions,
topography, land use, soil type, length of slope, seepage (where seepage is a problem)
and the development layout. Outlets must be stable after the diversion empties
stormwater flow into it; therefore, care should be exercised in the location selection of the
diversion and its outlet.

Capacity
The diversion channel must have a minimum capacity to carry the runoff expected from a
storm frequency meeting the requirements of Table DV-l with a freeboard of at least
0.3 foot (Figure DV-2).

The storm frequency should be used to determine the required channel capacity, Q (peak
rate of runoff). The peak rate of runoff should be determined using the Natural Resources
Conservation Service runoff curve number (RCN) method or other equivalent methods.

Table DV-1 Design Frequency


Diversion Type Typical Area of Protection 24-Hour Design Storm
Frequency
Construction Areas 2-year
Temporary
Building Sites 5-year
Agricultural Land 10-year
Mined Reclamation Area 10-year
Recreation Areas 10-year
Permanent
Isolated Buildings 25-year
Urban areas, Residential, School,
50-year
Industrial Areas, etc.

Diversions designed to protect homes, schools, industrial buildings, roads, parking lots,
and comparable high-risk areas, and those designed to function in connection with other
structures, should have sufficient capacity to carry peak runoff expected from a storm
frequency consistent with the hazard involved.

Velocities
Diversions should be designed so that the design velocities are as high as will be safe for
the planned type of protective vegetation and the expected maintenance, to minimize
sediment deposition in the channel. Maximum permissible velocities are dependent upon
the erosion resistance of the soil (Table DV-2) and the quality of the vegetation
maintained.

4-133
Runoff Conveyance

Table DV-2 Permissible Velocities


Velocity in Feet/Second
Soil Texture Conditions of Vegetation
Poor Fair Good

Sand, Silt, Sandy Loam,


1.5 2.0 3.0
Silt Loam

Silty Clay Loam, Sandy


2.5 3.0 4.0
Clay Loam

Clay 3.0 4.0 5.0

Channel Design
The diversion channel may be parabolic, trapezoidal or v-shaped, as shown in Figure
DV-2 and should be designed in accordance with the procedure shown at the end of this
practice. Land slope must be considered when choosing channel dimensions. On steeper
slopes, narrow and deep channels may be required. On more gentle slopes, broad,
shallow channels can be used to facilitate maintenance.

Ridge Design
The supporting ridge cross section should meet the configuration and requirements of
Figure DV-2.

The side slopes should be no steeper than 2:1. Side slopes should be flatter, 5:1 to 10:1,
when the diversion is to be permanent with mowing and other maintenance activities
performed on or around it.

The width of the ridge at the design water elevation should be a minimum of 4 feet. The
minimum freeboard should be 0.3 foot.

The design should include a 10% settlement factor.

Outlet
Diversions should have adequate outlets that will convey concentrated runoff without
erosion. Acceptable outlets include practices such as Grass Swale, Lined Swale, Drop
Structure, Sediment Basin, and Stormwater Detention Basins.

Stabilization
Unless otherwise stabilized, the ridge and channel should be seeded within 13 days of
installation in accordance with the applicable seeding practice, Permanent Seeding or
Temporary Seeding.

Disturbed areas draining into the diversion should be seeded and mulched prior to or at
the time the diversion is constructed in accordance with the Permanent Seeding,
Temporary Seeding, or Mulching Practices (whichever is applicable).

4-134
Runoff Conveyance

Figure DV-2 Typical Diversions Detail

4-135
Runoff Conveyance

Figure DV-3 Water Bar Detail

Design Criteria
Tables DV-l through DV-16 may be used to facilitate the design of grass-lined diversions
with parabolic cross sections. These tables are based on a retardance of “D” (vegetation
newly cut) to determine V1 for stability considerations. To determine channel capacity,
choose a retardance of “C” when proper maintenance is expected; otherwise, design
channel capacity based on retardance “B.” Refer to Table DV-2 for maximum
permissible velocities. The permissible velocities guide the selection of V1 and should not
be exceeded. It is good practice to use a value for V1 that is significantly less than the
maximum allowable when choosing a design cross section. When velocities approach the

4-136
Runoff Conveyance

maximum allowable, flatter grades should be evaluated or a more erosion-resistant liner


such as erosion control blanket or riprap should be considered. After the diversion
dimensions are selected in the design tables, the top width should be increased by 4 feet
and the depth by 0.3 foot for freeboard.

Example Problem

Given
Q: 30 cfs
Grade: 1%
Soil: Sandy clay loam
Condition of vegetation expected: fair
Maintenance: low; will be cut only twice a year.
Site will allow a top width of 26 feet.

Find
Diversion top width and depth that will be stable and fit site conditions.

Solution
From Table DV-2, use maximum permissible velocity of 3.0 ft/sec.

Since maintenance will be low, use “B” retardance for capacity.

From Table DV-4, use retardance “D” and “B”;


Grade 1.00 Percent Top width = 21.0 feet + 4 feet = 25.0 feet.

Depth = 1.6 feet + 0.3 foot = 1.9 feet.

V2 = 1.3 ft/sec.

Note: V1 < 3.0 ft/sec.; Top width < 26 feet, design O.K.

Note: It is good practice to select a cross section that will give a velocity, V1, well
below the maximum allowable whenever site conditions permit. Wide, shallow cross
sections are more stable and require less maintenance. It is always prudent to
evaluate flatter design grades in order to best fit diversions to the site and keep
velocities well below maximum allowable.

4-137
Runoff Conveyance

Table DV-3 Parabolic Diversion Design Chart (Retardance “D” and “B,” Grade 0.50%)

4-138
Runoff Conveyance

Table DV-4 Parabolic Diversion Design Char (Retardance “D” and “B,” Grade 1.00%)

4-139
Runoff Conveyance

Table DV-5 Parabolic Diversion Design Chart (Retardance “D” and “B,” Grade 2.00%)

4-140
Runoff Conveyance

Table DV-6 Parabolic Diversion Design Chart (Retardance “D” and “B,” Grade 4.00%)

4-141
Runoff Conveyance

Table DV-7 Parabolic Diversion Design Chart (Retardance “D” and “B,” Grade 6.00%)

4-142
Runoff Conveyance

Table DV-8 Parabolic Diversion Design Chart (Retardance “D” and “B,” Grade 8.00%)

4-143
Runoff Conveyance

Table DV-9 Parabolic Diversion Design Chart (Retardance “D” and “B,” Grade 10.00%)

4-144
Runoff Conveyance

Table DV-10 Parabolic Diversion Design Chart (Retardance “D” and “C,” Grade .50%)

4-145
Runoff Conveyance

Table DV-11 Parabolic Diversion Design Chart (Retardance “D” and “C,” Grade 1.00%)

4-146
Runoff Conveyance

Table DV-12 Parabolic Diversion Design Chart (Retardance “D” and “C,” Grade 2.00%)

4-147
Runoff Conveyance

Table DV-13 Parabolic Diversion Design Chart (Retardance “D” and “C,” Grade 4.00%)

4-148
Runoff Conveyance

Table DV-14 Parabolic Diversion Design Chart (Retardance “D” and “C,” Grade 6.00%)

4-149
Runoff Conveyance

Table DV-15 Parabolic Diversion Design Chart (Retardance “D” and “C,” Grade 8.00%)

4-150
Runoff Conveyance

Table DV-16 Parabolic Diversion Design Chart (Retardance “D” and “C,” Grade 10.00%)

4-151
Runoff Conveyance

Construction
Prior to start of construction, diversions should be designed by a qualified design
professional. Plans and specifications should be referred to by field personnel throughout
the construction process. A diversion should be built according to planned alignment,
grade and cross section. Typically, a diversion is constructed with the following
activities.

Site Preparation
Determine exact location of any underground utilities (see Appendix C: MS One-Call and
811 Color Coding).

Locate and mark the alignment of the diversion as shown on the plans. Minor
adjustments to the grade and alignment may be required to meet site conditions. The
alignment should maintain a positive grade toward the outlet and end in a stable outlet or
an area that can be stabilized.

Clear the construction area of trees, stumps, brush, sod and other unsuitable material
which would interfere with compaction of the ridge.

Disk or scarify the area where the ridge is to be installed before placing the fill.

Clean out and refill with compacted earth fill all ditches, swales or gullies to be crossed.

Apply gravel or hard surface protection at vehicle crossings to prevent rutting.

Install stable outlets prior to construction. Adequate vegetation should be established in


the outlet channel. If vegetation cannot be established, use Erosion Control Blankets
and/or Rock Outlets or Outlet Protection.

Grading
Excavate, fill and shape the diversion to planned alignment, grade and cross section. The
channel should have a positive grade toward the outlet to avoid ponding. Where possible,
blend diversion into the surrounding landscape.

Overfill and compact the ridge, allowing for 10% settlement. Fill should be placed in lifts
of no more than 6″ to 8″ in depth. Compaction may be achieved by driving wheeled
equipment along the ridge as lifts are added. The settled ridge top must be at or above
design elevation at all points.

All earth removed and not needed for the practice should be spread or disposed of so that
it will not interfere with the functioning of the diversion.

Erosion and Sediment Control


Control sediment along grading limits with sediment control measures.

Leave sufficient area adjacent to the diversion to permit clean-out and regrading.

Immediately after installation, install vegetation treatment or other means to stabilize the
diversion in accordance with plans.

Install gravel or hard surface protection at vehicle crossings.

4-152
Runoff Conveyance

Stabilize diversion outlets in accordance with plans.

Construction Verification
Check finished grades and cross section of diversions to eliminate constrictions to flow.
Check all ridges for low spots and stability.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate diversion will not function as intended.


Changes in plans will be needed.

Design specifications for seed variety or seeding cannot be met. Substitutions not
approved by the design professional could result in erosion and lead to diversion
failure.

Seepage is encountered during construction. It may be necessary to install drains.

Maintenance
Inspect weekly and following each storm event for erosion until the diversion is
vegetated.

Remove debris and sediment from the channel, and rebuild the ridge to design elevation
where needed.

Check diversion outlet for erosion and repair if area becomes unstable. Maintain
vegetation with periodic fertilization and mowing to keep vegetation in a vigorous,
healthy condition. Mow for weed and brush control during the first year and as needed to
prevent brush and tree seedlings from becoming established after the first year of
installation.

When the work area has been stabilized, remove temporary diversions, sediment barriers
and traps, and repair bare or damaged areas in the vegetation by planting and mulching or
sodding.

Stabilize all eroded, rutted or disturbed areas as soon as possible with vegetation or
synthetic erosion control measures as specified in the design.

4-153
Runoff Conveyance

References

BMPs from Volume 1

Chapter 4
Permanent Seeding (PS) 4-53
Temporary Seeding (TS) 4-103
Drop Structure (DS) 4-156
Grass Swale (GS) 4-162
Lined Swale (LS) 4-190
Sediment Basin (SBN) 4-298

MDOT Drawing TEC-2

Typical Temporary Erosion Control Measures 4-155


(Temporary Shoulder Berm)

4-154
Runoff Conveyance

4-155
Runoff Conveyance

Drop Structure (DS)

Practice Description
A drop structure is an erosion-control structure created by constructing a barrier across a
drainageway or installing a permanent manufactured product down a slope. The purpose
of a drop structure is to convey concentrated flow storm runoff from the top to the bottom
of a slope or to lower water from a grassed swale into an open channel such as an
intermittent or perennial stream. This practice applies where other erosion-control
measures are insufficient to prevent excessive erosion and off-site sedimentation.

Planning Considerations
This practice applies to the following sites: 1) where earth and vegetation cannot safely
handle water at permissible velocities; 2) where excessive grades or over-fall conditions
are encountered; and/or 3) where water is to be structurally lowered from one elevation to
another. These structures should be planned and installed as a part of an overall surface-
water disposal system. This practice does not apply to storm sewers, concrete over-fall
structures, in-channel grade-control structures, or road culverts.

Design Criteria and Construction


Design and specifications shall be prepared for each structure on an individual job basis
depending on its purpose and site conditions.

Capacity
The minimum design capacity for pipe structures shall be as required to pass the peak
runoff expected from a 2-year frequency, 24-hour duration storm. Peak rates of runoff
values used to determine the capacity requirements should be calculated using accepted
engineering methods. Some accepted methods are:

4-156
Runoff Conveyance

 Natural Resources Conservation Service, National Engineering Handbook Series,


Part 650, Engineering Field Handbook, Chapter 2, Estimating Runoff.

 Natural Resources Conservation Service (formerly Soil Conservation Service),


Technical Release 55, Urban Hydrology for Small Watersheds.

 Other comparable methods – See Appendix A: Erosion and Stormwater Runoff


Calculations found in the Appendices Volume.

Runoff computation will be based upon the most severe soil and cover conditions that
will exist in the area draining into the pipe structures during the planned life of the
structure.

All pipe structures should be designed as island type with an emergency spillway to
safely pass storm runoff greater than the structure design storm. The minimum total
capacity of the principal and emergency spillways shall be that required to handle the
25-year 24-hour duration storm, or the peak rate of flow from the contributing structure,
whichever is greater.

General
The planning and design of antivortex devices, trash racks, and anti-seep collars should
be in accordance with the requirements for principal spillway pipe design in the Sediment
Basin Practice. Outlet protection should be designed according to the Outlet Protection
Practice.

The crest elevation for the emergency spillway shall be set at the minimum level
necessary to ensure full pipe flow of the principal spillway. The top of the settled
embankment shall be based on 1 foot of freeboard above the design flow depth in the
emergency spillway.

Straight pipe structures should be built in accordance with Figure DS-l.

Pipe drop structures should be built in accordance with Figure DS-2.

4-157
Runoff Conveyance

Figure DS-1 Straight Pipe Structure

Figure DS-2 Pipe Drop Structure

4-158
Runoff Conveyance

Construction
Prior to the start of construction, drop structures should be designed by a qualified design
professional.

Plans and specifications should be referred to by field personnel throughout the


construction process. The drop structure should be built according to planned grades and
dimensions.

Note: Construction of an embankment with spillways is the only type of drop structure
covered in this edition of the manual.

Consider the following guidance as construction proceeds:

Site Preparation
Locate all utilities at the site to ensure avoidance (See Appendix C: MS One-Call and 811
Color Coding).

Clear, grub, and strip the dam foundation and emergency spillway area, removing all
woody vegetation, rocks and other objectionable material. Dispose of trees, limbs, logs,
and other debris in designated disposal areas.

Stockpile surface soil for use later during topsoiling.

Clear the sediment pool to facilitate sediment clean-out and dispose of trees, limbs, logs,
and other debris in designated disposal areas.

Principal Spillway
Prepare the pipe bedding and situate the spillway barrel (pipe) on a firm, even foundation.

Install anti-seep collars according to the design plan.

Place around the barrel 4″ layers of moist, clayey, workable soil (not pervious material
such as sand, gravel or silt), and compact with hand tampers to at least the density of the
foundation soil. (Do not raise the pipe from the foundation when compacting under the
pipe haunches.)

At the pipe inlet, install Inlet Protection according to the design plan.

At the pipe outlet, install Outlet Protection according to the design plan (if not specific,
use a riprap apron at least 5 feet wide to a stable grade).

Embankment
Scarify the foundation of the dam before placing fill. Use fill from predetermined borrow
areas. It should be clean, stable soil free of roots, woody vegetation, rocks and other
debris, and must be wet enough to form a ball without crumbling, yet not so wet that
water can be squeezed out.

Place the most permeable soil in the downstream toe and the least permeable in the center
portion of the dam.

4-159
Runoff Conveyance

Protect the spillway barrel with 2 feet of fill that has been compacted with hand tampers
before traversing over the pipe with equipment.

Compact the fill material in 6″ to 8″ continuous layers over the length of the
embankment. One way is by routing construction equipment so that each layer is
traversed by at least one wheel of the equipment.

Construct and compact the embankment to an elevation 10% above the design height to
allow for settling. The embankment should have a minimum 8-foot top width and 3:1
(Horizontal: Vertical) side slopes, but the design may specify additional width and
gentler side slopes.

Emergency Spillway
Construct the spillway at the site located by the qualified design professional according to
the plan design (in undisturbed soil around one end of the embankment, and so that any
flow will return to the receiving channel without damaging the embankment).

Erosion Control
Minimize the size of all disturbed areas.

Use temporary diversions to prevent surface water from running onto disturbed areas.

Vegetate and stabilize the embankment, the emergency spillway and all disturbed areas
immediately after construction.

Construction Verification
Check the finished grades and configuration for all earthwork. Check elevations and
dimensions of all pipes and structures.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate drop structure will not function as


intended.

Seepage is encountered during construction; it may be necessary to install drains.

Design specifications for fill, pipe, seed variety or seeding dates cannot be met;
substitutions may be required. Unapproved substitutions could lead to failure.

Maintenance
Inspect the drop structure after each storm event until it is completely stabilized with
vegetation.

Periodically check the embankment, emergency spillway and outlet for erosion damage,
piping, settling, seepage or slumping along the toe or around the barrel and repair
immediately.

4-160
Runoff Conveyance

References

BMPs from Volume 1

Chapter 4
Outlet Protection (OP) 4-199
Block and Gravel Inlet Protection (BIP) 4-233
Excavated Inlet Protection (EIP) 4-239
Fabric Drop Inlet Protection (FIP) 4-243
Straw Bale Inlet Protection (SBIP) 4-249

4-161
Runoff Conveyance

Grass Swale (GS)

Practice Description
A grass swale is a natural or constructed channel that is shaped or graded to required
dimensions and established with suitable vegetation for the stable conveyance of runoff
without causing damage to the channel by erosion. This practice applies to the following
sites: 1) where concentrated runoff will cause erosion damage; 2) a vegetative lining
provides sufficient stability for the channel as designed; and/or 3) space is available for a
relatively large cross section. Typical situations where concentrated-flow areas are
addressed with a grass swale include roadside ditches, channels at property boundaries,
outlets for diversions and other concentrated-flow areas subject to channel erosion.
Grassed swales are generally considered permanent structures but may be used as a
temporary measure. Grassed swales as permanent structures are discussed further in
Chapter 4 of Volume 2 - Stormwater Management Manual.

Planning Considerations
Grass swales should be carefully built to the design cross section, shape, and dimensions
specified. Swales are hydraulic structures and as such depend upon the hydraulic
parameters to function satisfactorily. Vegetated swales should be well established before
large flows are permitted in the channel.

The design of a channel cross section and lining is based primarily upon the volume and
velocity of flow expected in the channel. This practice covers grassed swales with low-
velocity flows (generally less than 5 ft/sec). Where high velocities are anticipated, lined
swales should be used (see Lined Swale Practice or Riprap-lined Swale Practice). Lined
swales should also be used where there is continuous flow in the swale, which would
prevent establishment of vegetation within the flow area.

4-162
Runoff Conveyance

Besides the primary design considerations of capacity and velocity, a number of other
important factors should be taken into account when selecting a cross section
(Figure GS-1). These factors include land availability, compatibility with land use and
surrounding environment, safety, maintenance requirements outlet conditions, etc.

Figure GS-1 Typical Grass Swale Cross Section

Triangular Shaped Ditches


Triangular-shaped ditches are generally used where the quantity of water to be handled is
relatively small, such as along roadsides. A triangular grass swale will suffice
where velocities in the ditch are low.

Parabolic Channels
Parabolic channels are often used where the quantity of water to be handled is larger and
where space is available for a wide, shallow channel with low-velocity flow.

Trapezoidal Channels
Trapezoidal channels are often used where the quantity of water to be carried is large and
conditions require that it be carried at a relatively high velocity. Trapezoidal ditches are

4-163
Runoff Conveyance

generally lined with concrete or riprap, but in some cases can be grassed swales, if lined
with erosion control blankets (see Erosion Control Blanket Practice).

Other Considerations
Outlet conditions for all channels should be considered. Appropriate measures must be
taken to dissipate the energy of the flow to prevent scour at the outlet of the swale.

Grass swales should be protected from erosion by concentrated flows. The methods of
protecting grass swales would include, but not be limited to, the following:

 Vegetation.

 A combination of biodegradable linings and vegetation.

The type and intensity of the protective linings will determine the design of the grass
swale.

If velocities exceed stable velocities, for vegetated swales or vegetation with


biodegradable linings, then other linings should be used (see Lined Swale or Riprap-lined
Swale Practice).

The time of the year should be considered when planning grass swales. Grass swales that
are seeded to establish vegetation should not be planned for construction during late fall,
winter or early spring. Grass swales constructed during mid-summer to early fall may
need temporary seeding followed by permanent seeding at the recommended times. The
vegetation species should be recommended for the area of the state that it is planned.

Design Criteria
Capacity
Grass swales shall be designed to convey the peak rate of runoff as shown in Table GS-1.
Adjustments should be made for release rates from structures and other drainage
facilities. Grass swales shall also be designed to comply with local stormwater
ordinances. Grass swales should be designed for greater capacity whenever there is
danger of flooding or out-of-bank flow cannot be tolerated.

Table GS-1 Design Frequency for Grassed Swale

Grass Swale Typical Area of Protection 24-Hour Design Storm


Type Frequency
Construction Areas 2-year
Temporary
Building Sites 5-year
Agricultural Land 10-year
Mined Reclamation Area 10-year
Recreation Areas 10-year
Permanent
Isolated Buildings 10-year
Urban areas, Residential, School,
10-year
Industrial Areas, etc.

Peak rates of runoff values used to determine the capacity requirements should be
calculated using accepted engineering methods. Some accepted methods are:

4-164
Runoff Conveyance

 Natural Resources Conservation Service, National Engineering Handbook Series,


Part 650, Engineering Field Handbook, Chapter 2, Estimating Runoff.

 Natural Resources Conservation Service (formerly Soil Conservation Service),


Technical Release 55, Urban Hydrology for Small Watersheds.

 Other comparable methods – See Appendix A: Erosion and Stormwater Runoff


Calculations found in the Appendices Volume.

Grade of Grass Swale


After selecting a location for the grassed swale that will minimize the impacts to the site
and maximize the intended use, the grade in the grass swales should be determined. The
grade in feet per 100 feet of length can be determined from a topographic map of the site
or from a detailed survey of the planned grassed swale location.

Retardance
The type grass used to vegetate the grassed swale and the degree of maintenance planned
for the vegetation determine the retardance of the swale (see Table GS-2).

Generally, the retardance used for the design of grassed swales should be “D” and “C” to
produce a stable velocity and adequate capacity to carry the design storm.

4-165
Runoff Conveyance

Table GS-2 Retardance for Grassed Swales


Retardance Species Cover Condition
Reed Canarygrass Excellent stand, tall (average 36″)
A
Yellow Bluestem Ischaemum Excellent stand, tall (average 36″)
Smooth Bromegrass Good stand, mowed (average 12 to 15″)
Bermuda Grass Good stand, tall (average 12″)
Native Grass Mixture (Little Good stand, unmowed
Bluestem, Blue Grama, and
other long and short Midwest
Grasses)
Tall Fescue Good stand, unmowed (average 18″)
B Lespedeza sericea Good stand, not woody, tall (average 19″)
Grass-Legume mixture- Good stand, uncut (average 20″)
Timothy, Smooth Bromegrass,
or Orchardgrass
Reed Canarygrass Good stand, mowed (average 12 to 15″)
Tall Fescue, with Bird’s Foot Good stand, uncut (average 18″)
Trefoil or Ladino Clover
Blue Grama Good stand, uncut (average 13″)
Bahiagrass Good stand, uncut (average 6 to 8″)
Bermuda Grass Good stand, mowed (average 6″)
Redtop Good stand, headed (15 to 20″)
Grass-Legume Mixture- Good stand, uncut (6 to 8″)
C Summer (Orchardgrass,
Redtop, Italian Ryegrass, and
Common Lespedeza)
Centipede grass Very dense cover (average 6″)
Kentucky Bluegrass Good stand, headed (6 to 12″)
Bermuda Grass Good stand, cut to 2.5″ height
Red Fescue Good stand, headed (12 to 18″)
Buffalo Grass Good stand, uncut (3 to 6″)
Grass-Legume Mixture-fall, Good stand, uncut (4 to 5″)
D spring (Orchard Grass,
Redtop, Italian Ryegrass, and
Common Lespedeza)
Lespedeza sericea After cutting to 2″ height. Very good stand
before cutting
Bermuda Grass Good stand, cut to 1.5″ height.
E
Bermuda Grass Burned stubble

Velocities
Classify the soil where the swale is to be constructed into erosion-resistant cohesive
(clayey) fine and coarse-grained soils or easily eroded noncohesive silt, clays and sands.

Determine the type of vegetative cover to be established in the swale.

Use the swale grade, cover, and soil erodibility to determine permissible velocity using
Table GS-3.

Swale Dimensions
The swale may be triangular shaped, parabolic or trapezoidal, as discussed in the
planning considerations of this practice and shown in Figure GS-1.

4-166
Runoff Conveyance

Using the peak discharge, swale grade, permissible velocity and retardance, the parabolic
dimensions can be determined using Table GS-4 (Sheets 1 through 14).

Table GS-3 Permissible Velocities in Grassed Swales


Permissible Velocity1
Cover Slope Range2 Erosion-Resistant Easily Eroded
Soils3 (clayey) Soils4 (sandy)
percent ft/sec ft/sec
<5 8 6
Bermuda Grass 5-10 7 4
over 10 6 3

Bahiagrass <5 7 5
Tall Fescue 5-10 6 4
over 10 5 3

Sericea lespedeza
5
Weeping Lovegrass <5 3.5 2.5
1
Use velocities exceeding (5ft/sec) only where good covers and proper maintenance can be obtained.
2
Do not use on slopes steeper than 10 percent except for vegetated side slopes in combination with a
stone, concrete, or highly resistant vegetative center section.
3
Cohesive (clayey) fine-grain soils and coarse-grain soils with cohesive fines with a plasticity index of
10 to 40 (CL, CH, SC, and CG).
4
Soils that do not meet requirements for erosion-resistant soils.
5
Do not use on slopes steeper than 5 percent except for vegetated side slopes in combination with a
stone, concrete, or highly resistant vegetative center section.

Design dimensions for triangular-shaped and trapezoidal-shaped swales can be


determined using Manning’s equation or other accepted engineering designs. (See
Appendix A: Channel Geometry.)

The design water surface elevation of a channel receiving water from other tributary
sources shall be equal to or less than the design water surface elevation of the
contributing source. The design water surface elevation of contributing and receiving
waters should be the same, whenever practical.

A minimum depth may be necessary to provide adequate outlets for subsurface drains
and tributary channels.

Drainage
Polyethylene drainage tubing, tile, or other suitable subsurface drainage measures shall
be provided for sites having high water tables or seepage problems.

Freeboard
The minimum freeboard is 0.25 foot in depth. Freeboard is not required on grass swales
with less than 1% slope and where out-of-bank flow will not be damaging and can
be tolerated in the normal operation at the site.

4-167
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 1 of 14

4-168
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 2 of 14

4-169
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 3 of 14

4-170
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 4 of 14

4-171
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 5 of 14

4-172
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 6 of 14

4-173
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 7 of 14

4-174
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 8 of 14

4-175
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 9 of 14

4-176
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 10 of 14

4-177
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 11 of 14

4-178
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 12 of 14

4-179
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 13 of 14

4-180
Runoff Conveyance

Table GS-4 Parabolic Grass Swale Design Sheet 14 of 14

4-181
Runoff Conveyance

Construction
Prior to start of construction, grass swale channels should be designed by a qualified
design professional. Plans and specifications should be referred to by field personnel
throughout the construction process to ensure that the channel has planned alignment,
grade, and cross section.

Scheduling
Schedule construction during a period of relatively low rainfall and runoff events if
practical. Consider also the establishment period (planting dates) for the planned species
that will be used for long-term vegetative cover.

Site Preparation
Determine exact location of underground utilities. (See Appendix C: MS One-Call and
811 Color Coding.)

Install any structures required to stabilize the swale outlet or to provide drainage along
the swale prior to beginning installation of the swale. Refer to design for structures to be
installed.

Remove brush, trees, and other debris from the construction area and dispose of properly.

Constructing
Excavate and shape the channel to dimensions shown in the design specifications,
removing and properly disposing of excess soil so surface water can enter the channel
freely. The typical features of a grass swale are shown in Figure GS-2 and listed below,
but may be different in the design for a specific site.

Cross Section: trapezoidal or parabolic.

Side Slopes: 3:1 (Horizontal: Vertical) or flatter for trapezoidal channels.

Outlet: Channel should empty into a stable outlet, sediment traps, or


detention/retention basins.

Subsurface Drain: Use in areas with seasonally high water tables or seepage
problems.

Topsoil: Provide topsoil as needed to grow grass on areas disturbed by


construction.

Protect all concentrated inflow points along the channel with erosion-resistant linings,
such as riprap, sod, mulch, erosion control blankets, turf-reinforcement mats or other
appropriate practices as specified in the design plan.

4-182
Runoff Conveyance

Figure GS-2 Typical Trapezoidal Grass-Lined Channel

Construction Verification
Check finished grade and cross section of channel throughout the length of the
watercourse. Verify channel cross sections at several locations to avoid constrictions to
flow.

Vegetating
Prepare seedbed; apply lime, fertilizer, and seed or sod in the swale immediately after
grading; and protect with erosion control blankets, turf-reinforcement mats, or mulch
according to the design plan. If not specified in a plan, select lime, fertilizer, grass variety
and mulching components from related practices (Permanent Seeding or Temporary
Seeding, Erosion Control Blanket or Sodding).

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate practice will not function as intended.

Changes in plan may be needed.

Design specifications for seed variety, seeding dates or erosion control materials
cannot be met; substitution may be required.

Erosion occurs in channel before vegetation is fully established.

Erosion occurs at channel outlet before vegetation is fully established.

Sediment is deposited at channel outlet before vegetation is fully established.

4-183
Runoff Conveyance

Maintenance
Inspect the channel following storm events both during and after grass cover is
established; make needed repairs immediately.

Check the channel outlet and road crossings for blockage, ponding, sediment, and bank
instability, breaks and eroded areas; remove any blockage; and make repairs immediately
to maintain design cross section and grade.

References

BMPs from Volume 1

Chapter 4
Erosion Control Blanket (ECB) 4-33
Permanent Seeding (PS) 4-53
Sodding (SOD) 4-93
Temporary Seeding (TS) 4-103
Lined Swale (LS) 4-190
Riprap-lined Swale (RS) 4-210

MDOT Drawing DT-1

Details of Typical Ditch Treatments 4-185

4-184
Runoff Conveyance

4-185
Runoff Conveyance

Level Spreader (LVS)

Practice Description
A level spreader provides a non-erosive outlet for concentrated runoff (diversions) by
dispersing flow uniformly across a stable slope. They are relatively low-cost structures
designed to release small volumes of water safely.

Planning Considerations
Level spreaders are designed to be used where sediment-free storm runoff is intercepted
and diverted away from graded areas onto undisturbed stabilized areas. This practice
applies only in those situations where the spreader can be constructed on undisturbed soil
and the area below the level crest is stabilized by natural or pre-established vegetation.
The water should not be allowed to re-concentrate after release.

The drainage area for a level spreader should be limited to 5 acres, and the size of the
spreader based on design runoff. When the level spreader is used as an outlet for
temporary or permanent diversions, runoff containing high sediment loads must be
treated in a sediment trapping device before release into a level spreader (see Sediment
Basin Practice).

Design Criteria
Capacity
The capacity of the spreader crest shall be limited to those drainage areas producing no
more than 40 cfs from a 10-year storm.
Length
By estimating the flow, the spreader crest length can be determined from the following
table.

4-186
Runoff Conveyance

Design Flow (CFS) Minimum Depression Depth Minimum Length (Feet)


(Feet)
0-10 0.5 10
10-20 0.6 20
20-30 0.7 30
30-40 0.8 40

Width
The minimum acceptable width of the depressional area along the level crest shall be
6 feet.
Grade
The grade of the channel for the last 20 feet of the dike or diversion entering the level
spreader shall be less than or equal to 1%. The grade of the depression along the level
spreader shall be 0%.
Outlet
The release of the stormwater will be over the level crest onto an undisturbed stabilized
area. The level crest should be of uniform height and zero grade over the length of the
spreader crest.
Setback
Level spreader setbacks should be a minimum of 10 feet from property lines and
receiving water features. Sheet flow depth at property lines shall be consistent with pre-
development flow.

Construction
Site Preparation

Level spreaders must be constructed on undisturbed soil (not fill material).

Figure LVS-1 Level Spreader, Sectional View (Source: NRCS)

4-187
Runoff Conveyance

Level Spreader Crest


The level spreader crest shall be constructed to a uniform height and zero grade over the
length of the spreader. For flows of 4 cfs or greater, a rigid crest of non-erodible material
shall be used. For flows less than 4 cfs, a vegetated crest may be used. An erosion control
blanket should be used with a vegetative crest (see Erosion Control Blanket Practice for
blanket requirements). The erosion control blanket should be a minimum of 4 feet wide
and extend at least 1 foot downstream. Secure the blanket with heavy duty staples and
bury the upstream and downstream edges in a trench at least 6 inches deep.

Erosion control blankets should be used for rigid crest level spreaders as well. The
erosion control blanket should be entrenched a minimum of 4 inches below existing
ground and securely anchored to prevent displacement. An apron of coarse aggregate
should be placed along the rigid crest and extended downslope at least 3 feet.
Vegetation
The natural buffer-area vegetation is important to improve infiltration function, protect
from rain and wind erosion and enhance aesthetic conditions. The level spreader itself
does not need vegetation. The lower buffer area should be protected from disturbance
during construction.
Filter Strip
Level spreaders used in conjunction with a filter strip should have a capacity designed
based on the filter strip specifics (See Filter Strip Practice). The spreader shall run
linearly along the entire width of the filter strip to which is discharges. The ends of the
spreader should be tied into higher ground to prevent flow around the spreader.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate practice will not function as intended;


changes in plan may be needed.

Design specifications cannot be met; substitution may be required. Unapproved


substitutions could result in failure of the practice.

Maintenance
Annual inspection is required. Trees and shrubs that have established on the level
spreader crest should be removed.

Inspection should occur annually for the presence of debris and sediment buildup on the
level spreader.

Regulation inspection, especially after significant rain events (greater than 3-4 inches in
24-hours), should be done to address possible erosion and gully formation.

4-188
Runoff Conveyance

References

BMPs from Volume 1

Chapter 4
Erosion Control Blanket (ECB) 4-33
Permanent Seeding (PS) 4-53
Temporary Seeding (TS) 4-103
Diversion (DV) 4-131
Outlet Protection (OP) 4-199
Sediment Basin (SBN) 4-298

4-189
Runoff Conveyance

Lined Swale (LS)

Practice Description
A lined swale is a constructed channel with a permanent lining designed to carry
concentrated runoff to a stable outlet. This practice applies to the following sites:
1) where grass swales are unsuitable because of conditions such as steep channel grades,
prolonged flow areas, soils that are too erodible or not suitable to support vegetation or
insufficient space and/or 2) where riprap-lined swales are not desired. The purpose of a
lined swale is to conduct stormwater runoff without causing erosion problems in the area
of channel flow.

The material that provides the permanent lining may be concrete, a specialized type of
erosion control blanket, or manufactured concrete products.

Planning Considerations
A lined swale is used to convey concentrated runoff to a stable outlet in situations where
a grass swale is inadequate. A lined swale can be lined with concrete, manufactured
concrete products, or manufactured erosion-control products. Concrete-lined swales are
the only type of lining covered in this practice. The practice Erosion Control Blanket
should be referenced for criteria on permanent erosion control blankets. Product
manufacturers and qualified design professional should be consulted for design
requirements for manufactured concrete linings. Concrete-lined swales are generally used
in areas where riprap-lined swales are not desired due to aesthetics, safety, or
maintenance concerns. Concrete-lined swales allow easy maintenance of surrounding
vegetation with normal lawn care equipment. The concrete generally provides a more

4-190
Runoff Conveyance

visually pleasing structure than the riprap linings. Concrete-lined swales are especially
desirable in areas accessed by small children.

In areas where stormwater infiltration is a concern, riprap and manufactured products


should be considered rather than the concrete lining.

Design Criteria
Capacity
Lined swales should be capable of passing the peak flow expected from a 10-year
24-hour duration storm.

Adjustments should be made for release rates from structures and other drainage
facilities. Swales shall also be designed to comply with local stormwater ordinances,
and should be designed for greater capacity whenever there is danger of flooding or when
out-of-bank flow cannot be tolerated.

Peak rates of runoff values used to determine the capacity requirements should be
calculated using accepted engineering methods. Some accepted methods are:

 Natural Resources Conservation Service, Engineering Field Manual for


Conservation Practices, Chapter 2, Estimating Runoff.

 Natural Resources Conservation Service (formerly Soil Conservation Service),


Technical Release 55, Urban Hydrology for Small Watersheds.

 Other comparable methods – See Appendix A: Erosion and Stormwater Runoff


Calculations found in the Appendices Volume.

Slope
This practice applies only to paved flumes that are installed on slopes of 25% or less.
Slopes steeper than this should be designed by a qualified design professional.

The slope in feet per 100 feet of length can be


determined from a topographic map of the site
or from a detailed survey of the planned lined
swale location.

Cross Section
With peak flow (capacity) and slope known,
the paved flume cross section can
be determined by using Figures LS-l – LS-3.

Concrete
Flumes should be constructed of concrete with
a minimum 28-day compressive strength of
3,000 psi. Flumes shall have a minimum
concrete thickness of 4″.

4-191
Runoff Conveyance

Cutoff Walls
Cutoff walls shall be constructed at the beginning and end of every flume except where
the flume connects with a catch basin or inlet.

Alignment
Keep paved flumes as straight as possible because they often carry supercritical flow
velocities.

Inlet Section
The inlet section to the paved flume should be at least 6 feet long and have a bottom
width equal to twice the bottom width of the flume itself. The bottom width should
transition from twice the flume bottom width to the flume bottom width over the 6-foot
length.

Outlet
Outlets of paved flumes shall be protected from erosion. The standard for Outlet
Protection can be used to provide this protection. A method to dissipate the energy of low
flows is to bury the last section of the flume in the ground. This will usually force the
development of a “scour hole,” which will stabilize and serve as a plunge basin. For the
design of large-capacity flumes, it may be necessary to design a larger energy dissipater
at the outlet.

4-192
Runoff Conveyance

Figure LS-1 Capacity Graph for Concrete Flumes


Depth of Flow = 0.50 Foot

4-193
Runoff Conveyance

Figure LS-2 Capacity Graph for Concrete Flumes


Depth of Flow = 0.75 Foot

4-194
Runoff Conveyance

Figure LS-3 Capacity Graph for Concrete Flumes


Depth of Flow = 1.00 Foot

4-195
Runoff Conveyance

Construction
Prior to start of construction, lined swales should be designed by a qualified design
professional, and specifications should be available to field personnel.

Plans and specifications should be referred to by field personnel throughout the


construction process.

Note: Concrete-lined channel is the only lining method that is covered in this edition
of the manual. Numerous permanent erosion control blankets and rock products are
available with similar applications, and their unique installation procedures should
be obtained from the manufacturer of the product being used. In addition, Riprap-
Lined Swale is covered in this manual.

Site Preparation
Determine exact location of underground utilities (See Appendix C: MS One-Call and
811 Color Coding).

Remove brush, trees, and other debris from the channel and spoil areas, and dispose of
properly.

Grade or excavate cross section to the lines and grades shown in design for the concrete
subgrade.

Remove soft sections and unsuitable material and replace with suitable material. The
subgrade should be thoroughly compacted and shaped to a smooth, uniform surface.

Material Placement
Place forms to meet the specific plan design for the project, and place concrete of the
designed mix into the forms according to construction specifications.

Construction and expansion joints should be used where swale length exceeds 10 feet.
Construction joints should be spaced at 10-foot intervals and expansion points at intervals
not to exceed 20 feet.

The subgrade should be moist at the time the concrete is placed.

Place concrete for the lined channel to the thickness shown on the plans and finish it in a
workmanlike manner.

Coat the concrete with an approved curing compound as soon as finish work is complete
and the free water has disappeared from the surface.

Provisions should be made to protect the freshly poured concrete from extreme
temperatures to ensure proper curing.

Stabilization
Stabilize channel inlet and outlet points according to the design plan.

4-196
Runoff Conveyance

Stabilize adjacent disturbed areas after construction is completed with a vegetation


treatment (see Permanent Seeding or Temporary Seeding Practices) and mulching.
Provide topsoil, lime, and fertilizer as needed to grow grass on areas disturbed by
construction. Many design plans specify a row of sod at the edges of the concrete
channel.

If not specified in a plan, select lime, fertilizer, variety and mulching components from
related practices – Permanent Seeding or Temporary Seeding, Mulching, Erosion Control
Blankets, or Sodding.

Construction Verification
Check finished grades and cross sections throughout the length of the channel. Verify
channel cross-section dimensions at several locations to avoid flow constrictions.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate practice will not function as intended;


changes in plan may be needed.

Design specifications cannot be met; substitution may be required. Unapproved


substitutions could result in failure of the practice.

Maintenance
Inspect lined channel at regular intervals and after storm events. Check for erosion
adjacent to the channel, at inlets and outlets, and underneath the lined channel.

Give special attention to the channel inlet and outlet, and repair eroded areas promptly.

Inspect for erosion in the entire swale, and repair with appropriate vegetative treatment
(permanent or temporary seeding and mulching).

References

BMPs from Volume 1

Chapter 4
Erosion Control Blanket (ECB) 4-33
Permanent Seeding (PS) 4-53
Sodding (SOD) 4-93
Temporary Seeding (TS) 4-103
Outlet Protection (OP) 4-199

MDOT Drawing DT-1

Details of Typical Ditch Treatments 4-198

4-197
Runoff Conveyance

4-198
Runoff Conveyance

Outlet Protection (OP)

Practice Description
This practice is designed to prevent erosion at the outlet of a channel or conduit by
reducing the velocity of flow and dissipating the energy. Outlet protection measures
usually consist of a riprap-lined apron, a reinforced concrete flume with concrete baffles,
a reinforced concrete box with chambers or baffles, and possibly pre-manufactured
products. This practice applies wherever high-velocity discharge must be released on
erodible material.

Planning Considerations
The outlets of pipes and structurally lined channels are points of critical erosion potential.
Stormwater that is transported through man-made conveyance systems at design capacity
generally reaches a velocity that exceeds the ability of the receiving channel or area to
resist erosion. To prevent scour at stormwater outlets, a flow transition structure is
required, which will absorb the initial impact of the flow and reduce the flow velocity to
a level that will not erode the receiving channel or area of discharge.

The most commonly used structure for outlet protection is an erosion-resistant lined
apron. These aprons are generally lined with loose rock riprap, grouted riprap, or
concrete. They are constructed at zero grade for a distance that is related to the outlet
flow rate and the tailwater level. Criteria for designing these structures are contained in
this practice. Several outlet conditions are shown in Figure OP-1. Example design
problems for outlet protection are found at the end of this practice.

4-199
Runoff Conveyance

Where the flow is excessive for the economical use of an apron, excavated stilling basins
may be used. Acceptable designs for stilling basins may be found in the following
documents available from the U.S. Government Printing Office.

1) Hydraulic Design of Energy Dissipaters for Culverts and Channels, Hydraulics


Engineering Circular No.14, U.S. Department of Transportation, Federal
Highway Administration.

2) Hydraulic Design of Stilling Basins and Energy Dissipaters, Engineering


Monograph No. 25, U.S. Department of Interior-Bureau of Reclamation.

Design Criteria and Construction


Structurally lined aprons at the outlets of pipes and paved channel sections should be
designed according to the following criteria:

Pipe Outlets

Capacity
The structurally lined apron should have the capacity to carry the peak stormflow from
the 25-year 24-hour frequency storm, or the storm specified in state laws or local
ordinances, or the design discharge of the water conveyance structure, whichever is
greatest.

Tailwater
The depth of tailwater immediately below the pipe outlet must be determined for the
design capacity of the pipe. Manning’s Equation may be used to determine tailwater
depth. Manning’s Equation may be found in Appendix A: Erosion and Stormwater
Runoff Calculations (available in the Appendices Volume). If the tailwater depth is less
than half the diameter of the outlet pipe, it shall be classified as a Minimum Tailwater
Condition. If the tailwater depth is greater than half the pipe diameter, it shall be
classified as a Maximum Tailwater Condition. Pipes that outlet to flat areas, with no
defined channel, may be assumed to have a Minimum Tailwater Condition.

Apron Length
The apron length should be determined from Figure OP-2 or OP-3 according to the
tailwater condition.

Apron Thickness
The apron thickness should be determined by the maximum stone size (dmax), when the
apron is lined with riprap. The maximum stone size shall be 1.5 × d50 (median stone
size), as determined from Figure OP-2 or OP-3. The apron thickness shall be 1.5 × dmax.

When the apron is lined with concrete, the minimum thickness of the concrete shall be 4″.

4-200
Runoff Conveyance

Figure OP-1 Pipe Outlet Conditions

4-201
Runoff Conveyance

Figure OP-2 Outlet Protection Design for Tailwater <0.5 Diameter

Apron Width
If the pipe discharges directly into a well-defined channel, the apron should extend across
the channel bottom and up the channel banks to an elevation 1 foot above the maximum
tailwater depth or to the top of the bank, whichever is the least.

If the pipe discharges onto a flat area with no defined channel, the width of the apron
should be determined as follows:

 The upstream end of the apron, adjacent to the pipe, should have a width 3 times
the diameter of the outlet pipe.

 For a Minimum Tailwater Condition, the downstream end of the apron should
have a width equal to the pipe diameter plus the length of the apron obtained
from the figures.

 For a Maximum Tailwater Condition, the downstream end shall have a width
equal to the pipe diameter plus 0.4 times the length of the apron from
Figure OP-2 or OP-3.

4-202
Runoff Conveyance

Bottom Grade
The apron should be constructed with no slope along its length (0.0% grade). The invert
elevation of the downstream end of the apron shall be equal to the elevation of the invert
of the receiving channel. There shall be no overfall at the end of the apron.

Side Slope
If the pipe discharges into a well-defined channel, the side slopes of the channel should
not be steeper than 2:1 (Horizontal: Vertical).

Alignment
The apron should be located so that there are no bends in the horizontal alignment.

Figure OP-3 Outlet Protection Design for Tailwater ≥0.5 Diameter

Geotextile
When riprap is used to line the apron, geotextile should be used as a separator between
the graded stone, the soil subgrade, and the abutments. Geotextile should be placed
immediately adjacent to the subgrade without any voids between the fabric and the
subgrade. The geotextile will prevent the migration of soil particles from the subgrade

4-203
Runoff Conveyance

into the graded stone. The geotextile shall meet the requirements shown in the table
below for Class I geotextile:

Table OP-1 Requirements for Nonwoven Geotextile


Property Test Class I Class II Class III Class IV 1
method
2
Tensile strength (lb) ASTM D 4632 180 minimum 120 minimum 90 minimum 115 minimum
grab test

Elongation at failure ASTM D 4632 ≥ 50 ≥ 50 ≥ 50 ≥ 50


2
(%)

Puncture (pounds) ASTM D 4833 80 minimum 60 minimum 40 minimum 40 minimum

Ultraviolet light ASTM D 4355 70 minimum 70 minimum 70 minimum 70 minimum


(% residual tensile 150-hr exposure
strength)
Apparent opening ASTM D 4751 As specified As specified As specified As specified
3 3 3 3
size (AOS) max. no.40 max. no.40 max. no.40 max. no.40

Permittivity sec–1 ASTM D 4491 0.70 minimum 0.70 minimum 0.70 minimum 0.10 minimum

Table copied from NRCS Material Specification 592.


1 Heat-bonded or resin-bonded geotextile may be used for Classes III and IV. They are
particularly well suited to Class IV. Needle-punched geotextiles are required for all other
classes.
2 Minimum average roll value (weakest principal direction).
3 U.S. standard sieve size.

Materials
The apron may be lined with loose rock-riprap, grouted riprap, or concrete. The median-
sized stone for riprap should be determined from the curves on Figures OP-2 and OP-3
according to the tailwater condition.

After the median stone size is determined, the gradation of rock to be used should be
specified using Tables OP-2 and OP-3. Table OP-2 is used to determine the weight of the
median stone size (d50). Using this median weight, a gradation can be selected from
Table OP-3, which shows commercially available riprap gradations.

Stone for riprap should consist of field stone or rough unhewn quarry stone of
approximately rectangular shape. The stone should be hard and angular and of such
quality that it will not disintegrate on exposure to water or weathering; it shall be suitable
in all other respects for the purpose intended. The specific gravity of the individual stones
should be at least 2.5.

When the apron is lined with concrete, the concrete should have a minimum compressive
strength at 28 days of 3000 pounds per square inch. American Concrete Institute

4-204
Runoff Conveyance

guidelines should be used to design concrete structures and reinforcement. As a


minimum, the concrete should be reinforced with steel-welded wire fabric.

Construction
Prior to start of construction, the practice should be designed by a qualified design
professional. Plans and specifications should be referred to by field personnel throughout
the construction process. The structure should conform to the dimensions, grades and
alignments shown on the plans and specifications.

Site Preparation
Completely remove stumps, roots, and other debris from the construction area. Fill
depressions caused by clearing and grubbing operations with clean, non-organic soil.
Grade the site to the lines and grades shown on the plans. Compact any fill required in the
subgrade to the density of the surrounding undisturbed material.

If possible, the alignment should be straight throughout its length. If a curve is required, it
should be located in the upstream section of the outlet.

Riprap Structures
Ensure that the subgrade for the filter and riprap follows the required lines and grades
shown in the plan. Low areas in the subgrade on undisturbed soil may also be filled by
increasing the riprap thickness.

Geotextile fabric must meet design requirements and be properly protected from
puncturing or tearing during installation. Repair any damage by removing the riprap and
placing another piece of filter cloth over the damaged area. All connecting joints should
overlap a minimum of 1.5 feet with the upstream edge over the downstream edge. If the
damage is extensive, replace the entire geotextile fabric.

Riprap may be placed by equipment; however, care should be taken to avoid damaging
the filter.

Construct the apron on zero grade with no overfall at the end. Make the top of the riprap
at the downstream end level with the receiving area or slightly below it.

Concrete Structures
Reinforcing steel-welded wire fabric should be placed in strict accordance with the
design plans and maintained in the proper position during the pouring of concrete.
Concrete should be placed in horizontal layers not exceeding 24″ in thickness, or as
specified in the design, and consolidated by mechanical vibrating equipment
supplemented by hand-spading, rodding, or tamping.

Concrete should be placed in sturdy wood or metal forms, adequately supported to


prevent deformation. Forms should be oiled prior to placement to prevent bonding
between concrete and forms.

If possible, concrete should not be placed during inclement weather or periods of


temperature extremes. If temperature extremes cannot be avoided, American Concrete
Institute guidelines for placement of concrete during such extremes should be consulted.

4-205
Runoff Conveyance

Concrete should be allowed to cure as required by the plans and specifications.

Typically, the surface should be kept wet during curing by covering it with wet burlap
sacks or other means. Design strengths should be confirmed by laboratory tests on
representative cylinders made during concrete placement. Form work should not be
removed prior to the specified time.

Table OP-2 Size of Riprap Stones


Rectangular Shape

Weight Mean Spherical Length Width, Height (feet)


Diameter (feet)
50 0.8 1.4 0.5

100 1.1 1.75 0.6

150 1.3 2.0 0.67

300 1.6 2.6 0.9

500 1.9 3.0 1.0

1000 2.2 3.7 1.25

1500 2.6 4.7 1.5

2000 2.75 5.4 1.8

4000 3.6 6.0 2.0

6000 4.0 6.9 2.3

8000 4.5 7.6 2.5

20000 6.1 10.0 3.3

Table OP-3 Graded Riprap

Class Weight (lbs.)


d10 d15 d25 d50 d75 d90
1 10 - - 50 - 100
2 10 - - 80 - 200
3 - 25 - 200 - 500
4 - - 50 500 1000 -
5 - - 200 1000 - 2000

4-206
Runoff Conveyance

Figure OP-4 Paved Channel Outlet

1) The flow velocity at the outlet of paved channels flowing at design capacity should
not exceed the velocity, which will cause erosion and instability in the receiving
channel.

2) The end of the paved channel should merge smoothly with the receiving channel
section. There should be no overfall at the end of the paved section. Where the
bottom width of the paved channel is narrower than the bottom width of the receiving
channel, a transition section should be provided. The maximum side divergence of
the transition shall be 1 in 3F where

F = v/gd, and
F = Froude no.
v = Velocity at beginning of transition (ft/sec.)
d = Depth of flow at beginning of transition (feet.)
g = 32.2 ft/sec.2

3) Bends or curves in the horizontal alignment of the transition are not allowed unless
the Froude no. (F) is 0.8 or less, or the section is specifically designed for turbulent
flow.

4-207
Runoff Conveyance

Example Design Problems

Example 1

Given: An 18″ pipe discharges 24 cu. ft/sec at design capacity onto a grassy slope
(no defined channel).

Find: The required length, width and median stone size (d50) for a riprap-lined
apron.

Solution
Since the pipe discharges onto a grassy slope with no defined channel, a Minimum
Tailwater Condition may be assumed.

From Figure OP-2, an apron length (La) of 20 feet and a median stone size (d50) of
0.8 foot is determined.

The upstream apron width equals 3 times the pipe diameter: 3 × 1.5 feet = 4.5 feet.

The downstream apron width equals the apron length plus the pipe diameter:
20 feet + 1.5 foot = 21.5 feet.

Example 2

Given: The pipe in example No. 1 discharges into a channel with a triangular cross
section, 2 feet deep and 2:1 side slopes. The channel has a 2% slope and an
“n” coefficient of 0.045.

Find: The required length, width and the median stone size (d50) for a riprap lining.

Solution
Determine the tailwater depth using Manning’s Equation and the Continuity Equation.

Q = 1.49/n R 2/3 S 1/2 A

24 = 1.49/n [2d/4.47]2/3 (0.02)1/2 (2d2)

where, d = depth of tailwater


d = 1.74 feet *

*Since d is greater than half the pipe diameter, a Maximum Tailwater Condition
exists.

4-208
Runoff Conveyance

From Figure OP-3, a median stone size (d50) of 0.5 foot and an apron length (La) of
41 feet is determined.

The entire channel cross section should be lined, since the maximum tailwater depth is
within 1 foot of the top of the channel.

Construction Verification

Check finished structures for conformance with design specifications.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate measure will not function as intended.

Design specifications for riprap, filter fabric, concrete, reinforcing steel, or


backfill cannot be met; substitutions may be required. Unapproved substitutions
could lead to failure.

Problems with the structure develop during or after installation.

Maintenance
Inspect riprap outlet structures after heavy rains to see if any erosion around or below the
riprap has taken place or if stones have been dislodged. Check concrete structures for
cracks and movement. Immediately make all needed repairs to prevent further damage.

References

BMPs from Volume 1

Chapter 4
Grass Swale (GS) 4-162

4-209
Runoff Conveyance

Riprap-lined Swale (RS)

Practice Description
A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock
lining designed to carry concentrated runoff to a stable outlet. This practice applies where
grass swales are unsuitable because of conditions such as steep channel grades, prolonged
flow areas, or soils that are too erodible or not suitable to support vegetation or
insufficient space.

Planning Considerations
Swales should be carefully built to the design cross section, shape, and dimensions.
Swales are hydraulic structures and as such depend upon the hydraulic parameters to
serve satisfactorily. Swales may be used to

 Serve as outlets for diversions and sediment control basins and stormwater
detention basins.

 Convey water collected by road ditches or discharged through culverts.

 Rehabilitate natural draws and gullies carrying concentrations of runoff.

The design of a swale cross section and lining is based primarily upon the volume
and velocity of flow expected in the swale. Riprap-lined swales should be used where
velocities are in the range of 5 to 10 ft/sec.

4-210
Runoff Conveyance

Besides the primary design considerations of capacity and velocity, a number of other
important factors should be taken into account when selecting a cross section. These
factors include land availability, compatibility with land use and surrounding
environment, safety, maintenance requirements, and outlet conditions, etc.

Riprap-lined swales are trapezoidal in shape. Trapezoidal swales are often used
where the quantity of water to be carried is large and conditions require that it be
carried at a relatively high velocity.

Outlet conditions for all swales should be considered. This is particularly important
for the transition from the riprap lining to a vegetative lining. Appropriate measures
must be taken to dissipate the energy of the flow to prevent scour of the receiving
swale.

Design Criteria
Capacity
Lined swales shall be designed to convey the peak rate of runoff from a 10-year
24-hour rainfall event. Adjustments should be made for release rates from structures
and other drainage facilities. Swales should also be designed to comply with local
stormwater ordinances.

Swales should be designed for greater capacity whenever there is danger of flooding
or when out-of-bank flow cannot be tolerated. The maximum capacity of the swale
flowing at design depth should be 200 cubic ft/sec.

Peak rates of runoff values used to determine the capacity requirements should be
calculated using accepted engineering methods. Some accepted methods are:

 Natural Resources Conservation Service, National Engineering Handbook


Series, Part 650, Engineering Field Handbook, Chapter 2, Estimating Runoff.
 Natural Resources Conservation Service (formerly Soil Conservation
Service), Technical Release 55, Urban Hydrology for Small Watersheds.
 Other comparable methods – See Appendix A: Erosion and Stormwater
Runoff Calculations found in the Appendices Volume.

Cross section
The swale cross section should be trapezoidal in shape. The steepest permissible side
slope of the swale should be 2:1 (Horizontal: Vertical). A bottom width should be
selected based on area available for installation of the swale and available rock sizes.
The bottom width will be used in determining stable rock size and flow depth.

Depth
Design flow depth should be determined by the following formula:
z= [n(q )/1.486(S)0.50]3/5
S= Bed slope, (ft/ft)
z= Flow depth, (ft)
q= Unit discharge, (ft3/s/ft) (Total discharge  Bottom width)
n= Manning’s coefficient of roughness (see formula under velocities)

4-211
Runoff Conveyance

The design water surface elevation of a swale receiving water from other tributary
sources should be equal to or less than the design water surface elevation of the
contributing source. The design water surface elevation of contributing and receiving
waters should be the same, whenever practical. A minimum depth may be necessary
to provide adequate outlets for subsurface drains and tributary swales.

Freeboard
The minimum freeboard is 0.25 foot. Freeboard is not required on swales with less
than 1% slope and where out-of-bank flow will not be damaging and can be tolerated
from an operational point of view.

Stable Rock Size


Stable rock sizes, for rock-lined swales having gradients between 2 percent and
40 percent should be determined using the following formulas from Design of Rock
Chutes by Robinson, Rice, and Kadavy.

For swale slopes between 2% and 10%: d50 = [q (S)1.5/4.75(10)-3]1/1.89

For swale slopes between 10% and 40%: d50 = [q (S)0.58/3.93(10)-2]1/1.89

d50 = Particle size for which 50 % of the sample is finer, inch


S = Bed slope, ft/ft
q = Unit discharge, ft3/s/ft
(Total discharge  Bottom width)

After the stable median stone size is determined, the gradation of rock to be used
should be specified using Tables RS-1 and RS-2. Table RS-1 is used to determine the
weight of the median stone size (d50). Using this median weight, a gradation can be
selected from Table RS-2, which shows commercially available riprap gradations.

Table RS-1 Size of Riprap Stones


Weight (lbs) Mean Spherical Rectangular Shape
Diameter (feet)
Length Width, Height
(feet)
50 0.8 1.4 0.5
100 1.1 1.75 0.6
150 1.3 2.0 0.67
300 1.6 2.6 0.9
500 1.9 3.0 1.0
1000 2.2 3.7 1.25
1500 2.6 4.7 1.5
2000 2.75 5.4 1.8
4000 3.6 6.0 2.0
6000 4.0 6.9 2.3
8000 4.5 7.6 2.5
20000 6.1 10.0 3.3

4-212
Runoff Conveyance

Table RS-2 Graded Riprap


Weight (lbs.)
Class d10 d15 d25 d50 d75 d90
1 10 - - 50 - 100

2 10 - - 80 - 200

3 - 25 - 200 - 500

4 - - 50 500 1000 -

5 - - 200 1000 - 2000

Velocities
Velocities should be computed by using Manning’s Formula with a coefficient of
roughness, “n,” as follows: n = 0.047(d50·S)0.147

Applies on slopes between 2 and 40% with a rock mantle thickness of 2 × d50 where:
d50 = median rock diameter (inch), S = lined section slope (ft/ft) (0.02 ≤ S ≤ 0.4)

Velocities exceeding critical velocity should be restricted to straight reaches.

Waterways or outlets with velocities exceeding critical velocity should discharge into
an outlet protection structure to reduce discharge velocity to less than critical (see
Outlet Protection Practice).

Lining Thickness
The minimum lining thickness should be equal to the maximum stone size of the
specified riprap gradation plus the thickness of any required filter or bedding.

Lining Durability
Stone for riprap should consist of field stone or rough unhewn quarry stone of
approximately rectangular shape. The stone should be hard and angular and of such
quality that it will not disintegrate on exposure to water or weathering, and it should
be suitable in all other respects for the purpose intended. The specific gravity of the
individual stones should be at least 2.5.
Geotextiles
Geotextiles should be used where appropriate as a separator between rock and soil to
prevent migration of soil particles from the subgrade, through the lining material.
Geotextiles should be Class I material as selected from Table RS-3.

Filters or Bedding
Filters or bedding should be used where needed to prevent piping. Filters should be
designed according to the requirements contained in the Subsurface Drain Practice.
The minimum thickness of a filter or bedding should be 6″.

4-213
Runoff Conveyance

Table RS-3 Requirements for Nonwoven Geotextile


Property Test Class I Class II Class III Class IV 1
method
Tensile strength (lb) 2 ASTM D 4632 180 minimum 120 minimum 90 minimum 115 minimum
grab test

Elongation at failure (%) 2 ASTM D 4632 ≥ 50 ≥ 50 ≥ 50 ≥ 50

Puncture (pounds) ASTM D 4833 80 minimum 60 minimum 40 minimum 40 minimum

Ultraviolet light ASTM D 4355 70 minimum 70 minimum 70 minimum 70 minimum


(% residual tensile 150-hr exposure
strength)
Apparent opening size ASTM D 4751 As specified As specified As specified As specified
3 3
(AOS) max. no. 40 3 max. no. 40 max. no. 40 max. no. 40 3

Permittivity sec–1 ASTM D 4491 0.70 minimum 0.70 minimum 0.70 minimum 0.10 minimum

Table copied from NRCS Material Specification 592.

1 Heat-bonded or resin-bonded geotextile may be used for Classes III and IV. They
are particularly well suited to Class IV. Needle-punched geotextile are required
for all other classes.
2 Minimum average roll value (weakest principal direction).
3 U.S. standard sieve size.

Construction
Prior to start of construction, riprap-lined swales should be designed by a qualified design
professional. Plans and specifications should be referred to by field personnel throughout
the construction process.

Site Preparation
Determine exact location of underground utilities (See Appendix C: MS One-Call and
811 Color Coding.)

Remove brush, trees, and other debris from the channel and spoil areas, and dispose of
properly.

Grade or excavate cross section to the lines and grades shown in design. Over-excavate to
allow for thickness of riprap and filter material. Foundation excavation not deep enough
or wide enough may cause riprap to restrict channel flow and result in overflow and
erosion. Side slopes are usually 2:1 (Horizontal: Vertical) or flatter.

Foundation Stabilization
Install geotextile fabric or aggregate in the excavated channel as a foundation for the
riprap. Anchor fabric in accordance with design specifications. If the fabric is omitted or
damaged during stone placement, there may be settlement failure and bank instability.

4-214
Runoff Conveyance

Installation
As soon as the foundation is prepared, place the riprap to the thickness, depth, and
elevations shown in the design specifications. It should be a dense, uniform, and well-
graded mass with few voids. Riprap should consist of a well-graded mixture of stone
(size and gradation as shown in design specifications) that is hard, angular, and highly
chemical, and weather resistant. Larger stone should predominate, with sufficient smaller
sizes to fill the voids between the stones. The diameter of the largest stone size should be
not greater than 1.5 times the d50 size. Minimum thickness of riprap liner should be
1.5 times the maximum stone diameter.

Blend the finished rock surface with the surrounding land surface so there are no
overfalls, channel constrictions, or obstructions to flow.

Outlet Stabilization
Stabilize channel inlet and outlet points. Extend riprap as needed.

Stabilize adjacent disturbed areas after construction is completed.

Construction Verification
Check finished grades and cross sections throughout the length of the channel.

Verify channel cross section dimensions at several locations to avoid flow constrictions.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate channel will not function as


intended; changes in plan may be needed.

Design specifications for riprap sizing, geotextile fabric or aggregate filter


cannot be met; substitution may be required. Unapproved substitutions could
result in channel erosion.

Maintenance
Inspect channels at regular intervals and after storm events. Check for rock stability,
sediment accumulation, piping, and scour holes throughout the length of the channel.

Look for erosion at inlets and outlets.

When stones have been displaced, remove any debris and replace the stones in such a
way as to not restrict the flow of water.

Give special attention to outlets and points where concentrated flow enters the channel
and repair eroded areas promptly by extending the riprap as needed.

4-215
Runoff Conveyance

References

BMPs from Volume 1

Chapter 4
Outlet Protection (OP) 4-199
Subsurface Drain (SD) 4-218

Additional Resources

Natural Resources Conservation Service, National Engineering Handbook Series,


Part 650, Engineering Field Handbook, Chapter 2, Estimating Runoff.
Natural Resources Conservation Service (formerly Soil Conservation Service), Technical
Release 55, Urban Hydrology for Small Watersheds.
Robinson, K.M., Rice, C.E., and Kadavy, K.C., 1998. Design of Rock Chutes. Am. Soc.
Agric. Eng. Trans. 41, 621–626.

MDOT Drawing DT-1

Details of Typical Ditch Treatments 4-217

4-216
Runoff Conveyance

4-217
Runoff Conveyance

Subsurface Drain (SD)

Practice Description
A subsurface drain is a perforated pipe or continuous layer of porous material installed
below the ground surface that intercepts, collects, and carries excessive groundwater to a
stable outlet. Subsurface drains by themselves do not provide erosion control. The
purpose of a subsurface drain is to improve soil moisture conditions, vegetation growth,
and ground stability. Subsurface drains may reduce wet ground from interfering with
construction activities. Drains may be constructed using a gravel-filled trench, perforated
pipe in gravel bedding, or manufactured drain panel products. This practice applies where
groundwater is at or near the ground surface or where adequate drainage cannot be
provided for surface runoff.

Planning Considerations
To properly design and install this practice, a detailed site investigation will be required.
This investigation should include a site survey to determine the location of the area to be
drained, the depth of the area to be drained, the topography of the area to be drained, the
outlet of the drain system, and the soils at the site.

When considering use of this practice, the qualified design professional should consider
the intended use of the area to be drained. Base flow and interflow of groundwater may
increase with installation of this practice due to excess soil water being removed.
Groundwater recharge may also be reduced by this practice. Finally, surface runoff may
increase due to this practice reducing deep percolation at the site.

4-218
Runoff Conveyance

All federal, state, and local laws and regulations should be adhered to when planning and
installing this practice.

Design Criteria
Layout and Depth
In the absence of site-specific information, a depth of 3 feet and a spacing of 50 feet for
drains should be adequate. However, it is recommended that site-specific information be
obtained. Typical details of subsurface drain construction can be seen in Figures SD-1
and SD-2. The following guidelines should be followed.

The depth at which the drain is installed will determine how much the water table is
lowered. The minimum depth for the drain is 2 feet under normal conditions. The
maximum depth is limited by the depth of the impermeable layer and, if a pipe is used in
the drain, by the allowable load on the pipe used.

Spacing
The permeability of the soil at the site and the depth of the drain will determine the
spacing of the drain.

Multiple Drains
In some cases more than one drain will be needed to achieve the desired results. The first
drain should be installed, and additional drains should be added only if seepage or high
water table problems continue.

Location
Drains should be located a minimum of 50 feet from any trees to prevent damage to the
trees.

Grade
In areas where sedimentation is not likely, the minimum grades should be based on site
conditions and a velocity of not less than 0.5 ft/sec. Where a potential for sedimentation
exists, a velocity of not less than 1.4 ft/sec should be used to establish the minimum
grades if site conditions permit. Otherwise, provisions should be made for prevention of
sedimentation by filters or collection and for periodic removal of sediment from installed
traps. Steep grades should be avoided.

Gravel Bedding
Typically, 3″ or more of gravel is placed completely around the drain and graded to
prevent the infiltration of fine-grained soils into the drain.

Filters and Filter Material


Filters will be used around conduits, as needed, to prevent movement of the surrounding
soil material into the conduit. The need for a filter will be determined by the
characteristics of the surrounding soil material (i.e. permeability), site conditions, and the
velocity of flow in the conduit.

A suitable filter should be specified if

 Local experience indicates a need.

4-219
Runoff Conveyance

 Soil materials surrounding the conduit are dispersed clay, low-plasticity silts, or
fine sands (ML or SM with plasticity index less than 7).

 Where deep soil cracking is expected.

 Where the method of installation may result in voids between the conduit and
backfill material.

The filter can be geotextile filter fabric, sand, gravel, or sand-gravel combination. If a
geotextile is used, it should meet the requirements of the material table found in the
Outlet Protection Practice. Care should be taken when using geotextile filter fabric since
small soil particles can clog the fabric. If a sand-gravel filter is specified, the filter
gradation will be based on the gradation of the base material surrounding the conduit
within the following limits:

 D15 size smaller than 7 times d95 size, but not smaller than 0.6 mm.

 D15 size larger than 4 times d15 size.

 Less than 5% passing No. 200 sieve.

 Maximum size smaller than 1.5″.

D represents the filter material, and d represents the surrounding base material. The
number following each letter is the percent of the sample, by weight, that is finer than
that size. For example, D15 size means that 15 percent of the filter material is finer than
that size.

Specified filter material must completely encase the conduit so that all openings are
covered with at least 3″ of filter material, except that the top of the conduit and side filter
material may be covered by a sheet of plastic or similar impervious material to reduce the
quantity of filter material required.

Clean-outs
In long sections of drain and in areas where sedimentation is concerned, clean-outs
should be installed in the drain to facilitate removal of sediment deposits.

Outlet and Protection


The outlet must be protected against erosion and undermining of the conduit, entry of tree
roots, damaging periods of submergence, and entry of rodents or other animals into the
subsurface drain. A continuous section of rigid pipe without open joints or perforations
will be used at the outlet end of the line and must discharge above the normal elevation of
low flow in the outlet ditch. Corrugated plastic tubing is not suitable for the outlet
section.

Materials
Pipe should be perforated, continuous closed-joint pipes of corrugated plastic, concrete,
corrugated metal, or bituminous fiber. The pipe should have sufficient strength to
withstand the load to be placed on it under the planned installation design.

4-220
Runoff Conveyance

Manufacturer’s recommendations should be followed in designing the pipe to withstand


design loads.

Figure SD-1 Details of Typical Subsurface Drain Construction

Figure SD-2 Details of Subsurface Drain Construction

4-221
Runoff Conveyance

Construction
Prior to start of construction, subsurface drains should be designed by a qualified design
professional. Materials such as sand, gravel, geotextile filter cloth, and pipe must be
properly designed in order for the subsurface drain system to function properly. Plans and
specifications should be available to field personnel.

Site Preparation
Determine exact location of underground utilities. At least 3 days prior to construction,
request Mississippi One-Call System (1-800-227-6477) to mark all underground utilities
within the project area. See Appendix C for more information about utility marking.

Locate and mark the alignment of the drains as shown on the design plans.

Clear installation area of debris and obstacles, such as trees and stumps, that might hinder
grading and installation of the subsurface drain.

Trench Excavation
Excavate the trench to the specified depth and grade shown in the design plan. To
accommodate the gravel bedding or filter material, excavate the trench to at least 3″
below the design bottom elevation of the pipe (or as shown on the design plans).

Place materials excavated from the trench on the up-gradient side of the trench to prevent
water from entering the trench during construction.

Grade the trench to prevent siltation into the drain.

Installation of Drain Pipe, Bedding Material and Geotextile Filter Cloth


Line trench with filter cloth (if specified), providing enough material to overlap over the
top of the finished gravel bedding. This helps prevent movement of soil into the gravel.

Spread bedding material specified in the design plan, usually 3″ of gravel, to fill the over-
excavated bottom of the trench.

Lay pipe on the design grade and elevation, avoiding reverse grade or low spots, after
checking to ensure the pipe meets specifications.

Cap the upper end of each drain with a standard cap made for this purpose or with
concrete or other suitable material to prevent soil from entering the open end.

Place bedding material around pipe, on all sides, with the amount shown in the design
plan.

Fold filter cloth over the top of the gravel bedding.

Backfill Installation
Backfill immediately after placement of the pipe and bedding. Ensure that the material
does not contain rocks or other sharp objects, and place it in the trench in a manner that
will not damage or displace the pipe. Overfill the trench slightly to allow for settlement.

4-222
Runoff Conveyance

Installation of Clean-Out Device


Install clean-outs for maintenance of the subsurface drain in the locations shown on
design plan.

Outlet Installation
Construct the outlet of the subsurface drain at the elevation in the design plan. The outlet
section of the drain should be at least 10 feet of non-perforated corrugated metal, cast
iron, steel, or heavy-duty plastic pipe. Cover at least half of the pipe length with well-
compacted soil. Place a suitable animal guard securely over the pipe outlet to keep out
rodents.

Stabilization
Keep the settled fill over the pipe outlet slightly higher than the surrounding ground to
prevent erosion, rills and gullies.

Stabilize all bare areas of the trench with temporary seeding and mulching unless
construction will disturb the area within 13 days.

Safety
Narrow trenches are subject to collapse and can be a safety hazard to persons in the
trench. No person should enter a trench without shoring protection or properly sloping the
sides of the trench.

Construction Verification
Verify the dimensions during construction with those shown on the plans for location,
length, depth, and cross section of trench.

Verify the dimensions and specifications of the aggregate used in the bedding and
manufactured materials such as pipe, tile or panel drain.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate subsurface drains will not function as


intended or originally designed.

Design specifications for aggregate or manufactured products cannot be met;


substitutions may be required. Unapproved substitutions could result in failure of
the drain to function as intended.

Pipe is crushed by construction traffic.

Maintenance
Check subsurface drains periodically to ensure that they are free-flowing and not clogged
with sediment.

Keep outlet clean and free of debris.

Keep surface inlets open and free of sediment and other debris.

4-223
Runoff Conveyance

Where drains are crossed by heavy vehicles, check the pipe to ensure that it is not
crushed.

References

BMPs from Volume 1

Chapter 4
Outlet Protection (OP) 4-199

4-224
Runoff Conveyance

Temporary Slope Drain (TSD)

Practice Description
A temporary slope drain is a pipe or other conduit designed to convey concentrated
runoff down the face of a cut- or fill-slope without causing erosion. This practice applies
wherever concentrated stormwater runoff must be conveyed down a steep slope.

Planning Considerations
There is often a significant lag between the time a cut- or fill-slope is completed and the
time a permanent runoff-conveyance system can be installed. During this period, the
slope is usually not stabilized and is particularly vulnerable to erosion. This situation also
occurs on slope construction that is temporarily delayed before final grade is reached.
Temporary slope drains, sometimes called “downdrains,” can provide valuable protection
of exposed slopes until permanent runoff-conveyance structures can be installed. See
Figure TSD-1 for typical details of a temporary slope drain.

When used in conjunction with diversions, temporary slope drains can be used to convey
stormwater from the entire drainage area above a slope to the base of the slope without
erosion. It is very important that these temporary structures be installed properly since
their failure will often result in severe gully erosion. The entrance section must be
securely entrenched, all connections must be watertight, and the conduit must be securely
staked. Prior approval may be required from local regulatory agencies if the downdrain
outlet is tied into an existing storm sewer or in areas where municipal stormwater is
regulated.

4-225
Runoff Conveyance

Design Criteria
Drainage Area
The maximum allowable drainage area per drain is 5 acres.

Flexible Conduit
The downdrain should consist of heavy-duty flexible material designed for this purpose.
The diameter of the downdrain should be equal over its entire length. Reinforced hold-
down grommets should be spaced at 10-foot (or less) intervals, with the outlet end
securely fastened in place. The conduit should extend beyond the toe of the slope.

Downdrains may be sized according to the table TSD-1.

Drains should be designed to convey the peak rate of runoff from a 10-year 24-hour
rainfall whenever it is desired to individually design each installation.

Table TSD-1 Flexible Conduit Diameters


Maximum Drainage Area (Acres) Pipe Diameter (D) (Inches)

0.5 12
1.5 18
2.5 21
3.5 24

5.0 30

Entrance Sections
The entrance to the downdrain (Figures TSD-2 and TSD-3) should consist of a standard
flared end-section for metal pipe culverts. All fittings should be watertight.

The toe plate should be a minimum of 8″ deep.

Extension collars should consist of 12″ long corrugated metal pipe. Avoid use of helical
pipe. Securing straps should be fabric, metal, or other material well suited to providing a
watertight connection. The strap should secure at least one corrugation of the extension
collar.

Diversion Design
An earthen diversion should be used to direct stormwater runoff into the slope drain and
should be constructed according to the Diversion Practice.

The height of the diversion at the centerline of the inlet should be equal to at least the
diameter of the pipe (D) plus 12″. Where the dike height is greater than 18″ at the inlet, it
should be level for 3 feet each side of the pipe and be sloped at the rate of 3:1
(Horizontal: Vertical) or flatter to transition with the remainder of the dike.

4-226
Runoff Conveyance

Outlet Protection
The outlet of the downdrain should be protected from erosion as detailed in the Outlet
Protection Practice.

Figure TSD-1 Typical Temporary Slope Drain Detail

4-227
Runoff Conveyance

Figure TSD-2 Flared End-Section Detail

4-228
Runoff Conveyance

Figure TSD-3 Flared End-Section Details (continued)

4-229
Runoff Conveyance

Construction
Prior to start of construction, temporary slope drains should be designed by a qualified
design professional. Plans and specifications should be referred to by field personnel
throughout the construction process.

Site Preparation
Determine exact location of underground utilities (see Appendix C: MS One-Call and
811 Color Coding).

Place temporary slope drain on undisturbed soil or well-compacted fill at locations and
elevations shown on the plans.

Grade the diversion channel at the top of the slope toward the temporary slope drain
according to the design plan. Provide positive grade in the pipe under the ridge.

Hand tamp the soil under and around the pipe in lifts not to exceed 6″.

Ensure that the fill over the drain pipe at the top of the slope is placed to the dimensions
shown on the design plan.

Ensure that all slope drain connections are secure and watertight.

Ensure that all fill material is well compacted. Securely anchor the exposed section of the
drain according to the design.

Extend the drain beyond the toe of the slope and adequately protect the outlet from
erosion.

Make the settled, compacted diversion ridge no less than 1 foot above the top of the pipe
at every point.

Erosion Control
Compaction of earthfill around the pipe in the vicinity of the ridge is extremely important
to avoid piping failure and blowouts.

Immediately stabilize all disturbed areas following construction according to the design
plan (with vegetation or other appropriate means of protection).

Construction Verification
Verify that materials, elevations, and installation procedures meet design specifications.

Joints should be carefully inspected for separations or looseness.

Common Problems
Consult with a qualified design professional if any of the following occur:

Variations in topography on site indicate temporary slope drains will not function
as intended.

4-230
Runoff Conveyance

Pipe separates or is displaced.

Animals are going into the pipe outlet.

Maintenance
Inspect slope drains and supporting diversions once a week and after every storm event.

Check the inlet for sediment or trash accumulation; clear and restore to proper condition.

Check the fill over the pipe for settlement, cracking or piping holes; repair immediately.

Check for holes where the pipe emerges from the ridge; repair immediately.

Check the conduit for evidence of leaks or inadequate anchoring; repair immediately.

Check the outlet for erosion or sedimentation; clean and repair, or extend if necessary.

Once slopes have been stabilized, remove the temporary diversions and slope drains so
that runoff water no longer concentrates but flows uniformly over the protected slope.
Stabilize the diversion and slope drain areas.

References

BMPs from Volume 1

Chapter 4
Permanent Seeding (PS) 4-53
Temporary Seeding (TS) 4-103
Diversion (DV) 4-131
Outlet Protection (OP) 4-199

MDOT Drawing TEC-2

Typical Temporary Erosion Control Measures (Slope Drain and 4-232


Type A Silt Basin)

4-231
Runoff Conveyance

4-232