A. Technical Specification
A1 Design requirement 3
A2 Serviceability requirement 7
A3 Brief Description of Structure Required 9
B. Acceptance Procedure 10
C. Appendices
Brief Description of Design Parameters 12
Table 1 Summary of Lamp Pole Type, Height and Design Basis 16
Table 2 Bill of Material: Lamp Pole 17
Table 3 Acceptance Checklist 18
Table 4 List of Accessories 19
Table 5 Tender Submission Checklist 19
Table 6 Wind Speed Conversion Unit 20
A. Technical Specifications
The technical Specifications have been divided into four parts:
• Part A.1 Design requirement.
• Part A.2 Serviceability requirement including the mandatory facilities
• Part A.3 Brief description of structures required
The specific requirement related with structure, design parameter, Bill of material,
accessories and acceptance checklist are specified in the Appendices.
Unless otherwise required, the pre-tensioned bolt or friction grip connection shall be
considered in the steelwork depending on the structure design requirement.
Taper washer shall be used whenever the steelwork design requires this type of washer. It
shall be D-shaped or square in plan to facilitate identification of this washer.
Three percent surplus in quantity of bolts, nuts and washers shall be considered in the delivery
package.
The grade of steelwork shall be clearly shown in the structure drawing and certificate as
reference.
The structure shall be designed and fabricated according to the adopted standard and
specification with the intended design life at least 50 years.
Any equivalent material specification than the said above is subject to further approval.
1 Surge / Lightning Rod 16mm dia. x 1000mm long. 6 kg 8m 12m 15m 20m
2 AAU 1000mm x 300mm x 150mm 20 kg 7.5m 11.5m 14.5m 19.5m
2 AAU Mounting Kit To manufacturer’s detail 4 kg 7.5m 11.5m 14.5m 19.5m
2 AAU 1000mm x 300mm x 150mm 20 kg 5.5m 9.5m 12.5m 17.5m
2 AAU Mounting Kit To manufacturer’s detail 4 kg 5.5m 9.5m 12.5m 17.5m
2 LED Light To manufacturer’s detail 5 kg 7.2m
1 LED Light Bracket Up to 4 units of LED Light 25 kg 7.2m
1 CCTV c/w Bracket To manufacturer’s detail 7.5 kg 7.2m
Advertisement Panel
1 1000mm x 1000mm x 200mm 120 kg 4m
c/w Bracket
1 Power Cable Bracket To manufacturer’s detail 5 kg 4m
2 BBU 500mm x 300mm x 170mm 16 kg 2m
2 Blade Battery 400mm x 300mm x 100mm 20 kg 2m
2 Blade Power 400mm x 300mm x 100mm 15 kg 2m
BBU / Battery /
6 To manufacturer’s detail 15 kg 2m
Rectifier Bracket
Chain Bracket for
1 12 link chain brackets 5 kg 2m
Equipment Installation
Notes:
An appropriate camouflage unit complete with mounting bracket is required to shield
appearance of the exposed active equipment. The camouflage unit shall made of FRP panel
having outer dimensions of 814mm diameter x 3400mm long.
In certain areas, quantity of LED light shall be maximum up to 4 units.
Separate cabinet with dimension 1000mm x 400mm x 200mm shall be provided on the ground
for Camouflage Pole and Cylindrical Pole type. Meanwhile, in-built cabinet for Standard Pole
type.
Alternatively, similar specification shall be adopted for the standard climbing ladder and the
structure shall be designed to have this compatibility whenever required.
The vertical step rungs or standard climbing ladder shall be free from splinters, sharp edges,
burrs, or projections which may pose a hazard to the climber and shall be considered with
minimum clearance to any obstructions according to the classification of climbing facilities as
described in the standard. The ladder shall be adequately designed to the standard strength
requirements and firmly attached on the structure.
For safety, fall arrest system shall be installed on the climbing ladder. Detail and requirement
of the system are subject to the manufacturer specification. It shall consist of relevant
components such as 8 mm galvanized cable, tensioner, carabiner, fall arrest device, universal
bracket, safety lanyard, body harness etc. The Tenderer shall ensure the provided climbing
ladder is suitable to be used with the system’s specification.
A.2.4 Painting
The structure shall be painted according to Airport and Aviation regulation and the Tenderer
shall comply the following requirements whenever required:
• Two layers of lead oxide type of anti-corrosion paint or equivalent.
• Two layers of high-quality enamel gloss paint for final coating.
• All surfaces of the structure shall be cleaned from dirt, rust, grease or any substances that
may affecting bonding and quality of the paint.
• Detail pertaining to the furnished primary and enamel paint including type, model, brand,
colour codes are subject to further approval.
• All structure parts shall be painted except climbing ladder, cable tray, platforms etc.
• Average thickness of the final coating shall be 110 microns.
The structure itself is intended for use as an earthing conductor; separate conductor cable or
tape shall not be used. Thus, the structure shall be connected from lightning rod to earthing
system through the provided hole or any suitable connection point at most practical location
on the structure. Any welding on the connection point is not allowed.
Antenna cable on the structure is earthed through an earthing kit and terminated on a busbar.
The busbar shall be made of copper flat bar with pre-drilled holes for use in the termination.
The busbar generally required at top section of the structure and above the level of horizontal
cable tray that routing the antenna cable between structure and equipment cabinet.
In some condition, initial-to-intermediate-to-final loading may require the busbar to be installed
in every 3 m at top section of the structure; Thus, the Tenderer shall ensure the provided
structure is able to facilitate this condition. The Tenderer shall provide detail quantity of the
lightning protection and earthing system whenever required.
It is important to ensure the pole is structurally adequate in supporting antenna against the
specified wind speed and parameters including the possibility of wind gust-induced vibration
effect. The shafts shall be planned for an optimize design, smaller footprint, also ease for
transportation and on-site assembly. Detail criteria pertaining to the lamp pole are summarized
in Table 1 of the Appendices. Latest software of Ms Tower shall be used in the design.
B. Acceptance Procedure
The structure acceptance procedure is divided into the following stages:
• Factory level acceptance
• Delivery level acceptance (site or edotco designated warehouse)
Factory Level Acceptance:
This level of acceptance mainly depends on an authorized edotco personnel; who shall visit
factory or fabrication facility to inspect the trial assembly on the structure and granted with an
access to any related area whenever required. Any reference such as erection or fabrication
drawing and list of structure parts shall be provided upon the inspection.
The fabrication process shall be performed in a fully integrated factory system (an ideal case
but not mandatory) that able to facilitate stockpile of raw material sufficiently and equipped
with high precision CNC line, welding section area, overhead lifting crane, covered storage
area or warehouse facility, assembly yard, loading yard, galvanizing plant etc in which deemed
important to ensure the fabrication process is within proper control and quality.
Only high-quality raw material used in the fabrication process. The material supplied from the
mill without an automatic rolling facility shall not be accepted except for mill with good track
record in exporting similar material. The nominated mill shall be ISO certified and the Tenderer
is required to provide mill detail such as name, address and contact number for reference. All
supplied materials shall conform to the specification as described herein and any equivalent
material specification is subject to further approval. A certificate on material testing shall be
provided by the Tenderer whenever required for the acceptance.
All materials shall be imposed with relevant identification in line with the certificate that
indicates the material had been tested and complied with the specification and adopted
standard. An appropriate colour marking shall be used for identification of the material grade.
The trial assembly on the structure is accepted prior to the hot dip galvanized process and
placed in horizontal orientation to facilitate access and inspection on the assembled structure
parts.
Delivery Level Acceptance:
This level of acceptance mainly depends on an authorized edotco personnel; who shall inspect
process of unloading the delivered structure parts either on-site or at designated warehouse.
Any reference such as erection or fabrication drawing and list of structure parts shall be
provided upon the inspection. edotco reserves the right to reject any non-compliances found
from the inspection.
Below is list of the structure parts that shall be inspected (or in accordance with the specified
scope of work:
• All structure members
• Foundation bolts, bolts, nuts, anchor bolts, and setting template
• Connection plates, plates, joints, splice plates, gusset plates, base plates.
• Vertical step rungs with cable bracket.
• Working and rest platforms.
• Equipment platform and associated parts.
• Lightning rod.
• Other accessories.
C. APPENDICES
1. 1 General
Structures and foundations shall be designed so that their design strength equals or exceeds
the load effects of the factored loads in each of the following limit state combinations:
Exceptions:
Antennas and antenna supporting structures have unusual shapes and response
characteristics due to wind load. The provisions of this Standard take into consideration the
load magnification effects caused by wind gusts in resonance with wind vibrations of self-
supporting and guyed antenna supporting structures.
• The basic wind speed without ice, V, the basic wind speed with ice, Vi, and the design ice
thickness, ti shall be determined from Cl 2.6.4.
• A wind direction probability factor, Kd, shall be determined from Table 2-2.
• An importance factor, I, shall be determined from Table 2-3 based on the structure
classification listed in Table 2-1.
• An exposure category and velocity pressure coefficient, Kz, shall be determined for the
site location in accordance with Cl. 2.6.5
• A topographic category and topographic factor, Kzt, shall be determined in accordance
with Cl. 2.6.6.
• A gust effect factor, Gh, shall be determined in accordance with Cl.2.6.7.
• The design ice thickness shall be escalated with height in accordance with Cl.2.6.8.
• The design wind force shall be determined in accordance with Cl. 2.6.9.
• The design wind force shall be determined in accordance with Cl. 2.6.9.
Exposure B:
Urban and suburban areas, wooded areas, or other terrain with numerous closely spaced
obstructions having the size of single-family dwellings or larger. Use of this exposure shall be
limited to those areas for which terrain representative of Exposure B surrounds the structure
in all directions for a distance of at least 2,630 ft. [800 m] or ten times the height of the structure,
whichever is greater.
Exposure C:
Open terrain with scattered obstructions having heights generally less than 30 ft [9.1 m]. This
category includes flat, open country, grasslands and shorelines in hurricane prone regions.
Exposure D:
Flat, unobstructed shorelines exposed to wind flowing over open water (excluding shorelines
in hurricane prone regions) for a distance of at least 1 mile [1.61km]. Shorelines in Exposure
D include inland waterways, lakes and non-hurricane coastal areas. Exposure D extends
inland a distance of 660 ft [200 m] or ten times the height of the structure, whichever is greater.
Smooth mud.
Self-Supporting Tower:
For tower, the gust effect factor shall be 1.00 for structures 600 ft [183 m] or greater in height.
For structures 450 ft. [137 m] or less in height, the gust effect factor shall be 0.85. The gust
effect factor shall be linearly interpolated for structure heights between 450 ft. [137 m] and 600
ft. [183 m]
Pole:
For pole the gust effect factor shall be 1.1.
Exposure Category: C
Open terrain with scattered obstructions having heights generally less than 30 ft. [9.1 m]. This
category includes flat, open country, grasslands and shorelines in hurricane prone regions.
Topographic Category: 1
No abrupt changes in general topography, e.g. flat or rolling terrain, no wind speed-up
consideration shall be required.
Importance Factor: 1
Based on the structure class II
FA = qz Gh (EPA)A
Where:
qz = velocity pressure at the centerline height of the appurtenance from 2.6.9.6
Gh = gust effect factor from 2.6.7 (Note: see 2.6.9)
(EPA)A = effective projected area of the appurtenance
The design wind force, FA, shall be applied at the centroid of the effective projected area of
the appurtenance in the direction of the wind. For a linear appurtenance, the length considered
to have uniform velocity pressure and ice thickness shall not exceed the section length
specified in Cl. 2.6.9.1.3.
In the absence of more accurate data, the design wind force on microwave antennas shall be
determined using Annex C.
In the absence of more accurate data specifying effective projected area values for each
critical wind direction, the effective projected area, (EPA) A, of an appurtenance shall be
determined from the equation:
where:
θ = relative angle between the azimuth associated with the normal face of
the appurtenance and the wind direction (Refer to Figure 2-4).
(EPA)N = effective projected area associated with the windward face normal to the
azimuth of the appurtenance.
(EPA)T = effective projected area associated with the windward side face of the
appurtenance. The larger value of (EPA)N or (EPA)T may be
conservatively used for (EPA)A for all wind directions. In the absence of
more accurate data, an appurtenance shall be considered as consisting of
flat and round components in accordance with the following:
Note:
Please refer to the TIA-222-G standard for all the related table and clauses specified under
design parameters.
Galvanization:
4. Standard
ISO 1461: 2009 ‘Hot Dip Galvanized Coatings on Fabricated Iron and Steel Articles –
Specifications and Test Methods.
Painting:
As requirement of airport and aviation regulation
5. Basic Wind Speed 180 kph (3-sec gust)
More information on elevation above ground in each height of pole as detailed out in A.1.10.
Pole
Base plate
Base template
Anchor template (plates, bolts)
13. Base Pole Definition Base stiffeners
Top pole cover
Internal, External, Power Cable, CCTV, Advertisement, BBU, Battery, Power/Rectifier
brackets
Lightning rod and copper busbar
Antenna mount kit for AAU (Set of 2 AAU, set of 4 AAU)
Active equipment camouflage unit complete with mounting bracket.
14. Pole Accessories Single lamp arm
Vertical step rungs.
12 link chain brackets for equipment installation.
Note:
1. The design criteria and loading considered shall be put under the BOM sheet for all individual structures.
Checklist for Acceptance both at Factory Level & Site Level, as applicable (Tower and Pole)
No. Item description √ Remarks
1 Factory visit and prototype inspection
2 Factory QC/QA Document Submission and check
3 Member size confirmation as per design profile
4 Material grade confirmation as per design profile
Structure geometry should be detailed/fabricated as per design profile. Erection drawing
5
and design report should be same
6 Check tower base width (bottom leg to leg)
7 Check tower top width (top leg to leg)
8 Check level of working and rest platform
9 Check joint connection
10 Check bolt as per design profile
11 Welding check
12 Notching, cutting, cropping check
13 Member tolerance check
14 Check availability of lightning rod/arrestor
15 Check earthing holes
16 Galvanizing check
17 Member marking check
18 Verification of packing list
19 Check how material is storing - before and after fabrication, after galvanization
Check how the loading/handling during the loading and unloading from warehouse to
20
container and what are the cautions are taken
Accessories- catalogues and trail assembly check- pertaining to cables, lighting,
21
aviation light, ground material etc.
22 Painting check
23 Grounding check
24 Aviation light is working
25 Antenna mounting kit check
● Member specs as per design
● Galvanized properly
● Attached to the tower properly with capacity as per loading requirement
26 Check tower verticality using theodolite (Please refer to Appendix A4)
27 Check bolt torque (Please refer to Appendix A3)
28 Check the tension of each guy wire (Please refer to Appendix A5)
29 Certificate verification
● Mill certificate
● Galvanizing certificate
● Welding certificate
● Bolt and nuts strength test certificate
● Bolt and nuts hot-dip galvanized certificate
30 Warranty certificates
● Tower warranty certificate
● Tower painting warranty certificate
● Aviation light warranty certificate
● Artificial leaves and barks material warranty certificate (for aesthetic tree monopole)
31 Photos
● Structure geometry
● Measurement of tower base width (bottom leg to leg)
● Measurement of tower top width (top leg to leg)
● Joint detail
● Anchor bolt and baseplate
● All findings & rectification recommended during inspection
Checklist for Substructure Acceptance
No. Item description √ Remarks
1 ● Seismic test (if required)
2 ● Rebar check (type, size)
3 ● Cylinder test
4 ● Visual flood level on site (Should conform to Initial suvey - TSSR Report)
5 ● Depth of foundation
Note:-
1. Below items are mandatory; Tenderers are free to include additional information, if feel necessary.
2. Technical submission shall follow the same sequence as noted below
3. Tick mark the check box, if submitted and this shall be the first sheet of tender document
Wind Speed
SI. NO.
m/s kPh
1 31 112
2 33 119
3 33.33 120
4 36 130
5 45 162
6 53 191
7 60 216
8 63 227
9 75 270