Training Matrix
Training Matrix
Read Information Sheet 1.1-1, Baking CBLM Learning Resource Area 8:30-9:30 The trainees were able to
ingredients, weights, and Print materials accomplish all the given
measurements Non-Print materials activity.
Answer Self-Check 1.1-1
Compare Answers with Answer keys
1.1-1
Answer the guided questions
Model answer will be given by the
trainer
Discussion Laptop
View power point presentation on White screen Learning Resource Area 9:30-10:00 The group were able to
baking ingredients, weights and accomplish the given activity
projector
measurements ingredients Power point
according to standard procedures. presentation on
baking
ingredients,
weights, and
measurements
Read Information Sheet 1.1-2 CBLM Learning Resource Area 10:00-10:30 The group was able to
Types and classification of bakery Print Materials accomplish the given activity
products
Non-print material
Answer Self-check 1.1-2
Compare answer to self-check 1.1-2
Evaluation All Trainees Rating Sheet Institutional Assessment 1:00-3:00 All the trainees got the
Giving of Feedback Area correct answer and passed
Formative Assessment the expectation.
Cleaning of Work Areas, Tools All Trainees Cleaning of tools Whole Training 3:00-5:00
and Equipment Area
FACILITIES/TOOLS AND DATE &
TRAINING ACTIVITY TRAINEE VENUE
EQUIPMENT TIME
WORKSTATION/AREA REMARKS
Perform Task Sheet No. 1.1-4. . CBLM 1:00-2:00 The group was able to accomplish
Operating oven temperature Print materials the given activity
required for baked products Non print materials Practical Work Area
Oven
Cleaning of Work Areas, Tools All Trainees Cleaning tools Whole Training Area 3:00-5:00
and Equipment
FACILITIES/TOOLS AND
TRAINING ACTIVITY TRAINEE VENUE DATE & TIME
EQUIPMENT
WORKSTATION/AREA REMARKS
Prayer
Recap of Activities All
Unfreezing Activities Trainees cleaning supplies Learning Resource Area September 6, 2021
Feedback of Training
8:00-8:30
Rejoinder/Motivation
Lecture CBLM
Listen to the lecture on Print materials Learning Resource Area The group was able to
Baking Terminologies, Non-Print materials accomplish the given activity
mixture procedures and 9:00-10:00
techniques for baked
products
Self-check 1.1-5
Compare answer to Answer
sheet 1.1-5
Demonstration
Pay attention to the trainer Practical work area 10:00-12:00 The group had a little
while he/she demonstrates difficulty in answering the
the procedures. guide questions but none the
less the group was able to
grasp the content.
. 1:00-2:00
Perform Job Sheet 1.1-5 Instruction book
Practical Work Area The group was able to
accomplish the given activity
Evaluation
Giving of Feedback All Trainees Rating Sheet Institutional Assessment 2:00-3:00 All the trainees got the
Formative Assessment Area correct answer and passed
the expectation.
Prayer
Recap of Activities All cleaning supplies Learning Resource Area September 7, 2021
Unfreezing Activities
Trainees 8:00-8:20
Feedback of Training
Rejoinder/Motivation
Cleaning of Work Areas, Tools All Trainees Cleaning tools Whole Training 3:00-5:00
and Equipment
Area
FACILITIES/TOOLS AND
TRAINING ACTIVITY TRAINEE VENUE DATE & TIME
EQUIPMENT
WORKSTATION/AREA REMARKS
Self-Study CBLM
Read Information 1.2-2, . Print materials Learning Resource Area 8:30-9:00 The group was able to
Decoration techniques and Non-Print materials accomplish the given activity
rules for garnishing bakery
products
Lecture
Answer self-check 1.2-2
Compare Answer to
Answer key 1.2-2
Lecture Laptop
View demonstration on White screen Learning Resource Area 9:00-10:00 The group was able to
Decoration techniques and accomplish the given activity
projector
rules for garnishing bakery
Power point
products
presentation
Demonstration Laptop
Perform the Criteria Checklist White screen Practical work area 10:00-1:00pm The group will need to
1.2-2 projector extend their time for
Trainer validates the service manual demonstration
performance using Short video clip on
performance criteria checklist Baking Terminologies,
1.2-2 mixture procedures
and techniques for
baked products
Baking tools, utensils
and equipment’
Evaluation
Giving of Feedback Rating Sheet
Formative Assessment All Trainees Institutional Assessment 2:00-3:00 All the trainees got the
Area correct answer and passed
the expectation.
Self-Study CBLM
Read Information 1.2.3; . Print materials Learning Resource Area 9:00:9:30 The group was able to
Tools and materials in Non-Print materials accomplish the given activity
decorating, finishing, and
presenting bakery products
Lecture Laptop
View a power point White screen
presentation on the tools projector Learning Resource Area 9:30 – 10:00 The group was able to
and materials in service manual accomplish the given activity
decorating, finishing and Power point
presentation
presenting
Answer self-check 1.2-3
Compare Answer to
Answer key 1.2-3
Self-Study CBLM
Read Information 2.1.4; Print materials Learning Resource Area 10:00-11:00 The group was able to
Standard procedure in Non-Print materials accomplish the given activity
decorating, finishing, and
presenting bakery products
FACILITIES/TOOLS AND
TRAINING ACTIVITY TRAINEE VENUE DATE & TIME
EQUIPMENT
WORKSTATION/AREA REMARKS
Self-study CBLM Learning Resource Area 9:30-9:40 The group was able to accomplish
Read information sheet Print materials the given activity
1.3-3; Standard Non-Print materials
procedure in storing
bakery products
Answer self-check 1.3-3
Compare Answer to
Answer key 1.3-3
Discussion CBLM Learning Resource Area 9:40-10:00 The group was able to accomplish
Perform Task Sheet No. Print materials the given activity
1.3-3. Non-Print materials
Standard procedure in
storing bakery products
Check Individual works
using performance
criteria checklist
Self-study CBLM Learning Resource Area 10:00-10:10 The group was able to accomplish
Read information sheet Print materials the given activity
1.3-4, Standard packaging Non-Print materials
of bakery products
Answer self-check 1.3-4
Compare Answer to
Answer key 1.3-4
Discussion CBLM Learning Resource Area 10:10-10:30 The group was able to accomplish
Perform Task Sheet No. Print materials the given activity
1.3-4. Non-Print materials
Standard packaging
bakery products
Check Individual works
using performance
criteria checklist
Lunch break Canteen 10:30-1:00
Evaluation All Trainees Rating Sheet Institutional Assessment 2:00-3:00 All the trainees got the correct
Giving of Feedback Area answer and passed the expectation.
Formative Assessment
Cleaning of Work Areas, All Trainees Cleaning tools Whole Training 3:00-5:00
Tools and Equipment
Area