Scaffolding and Work at Height - Risk Assessment JHA .
Scaffolding and Work at Height - Risk Assessment JHA .
HDGSK HSE Plan and safety procedures are to be followed at all times.
Minimum PPE to be worn at all times.
This JHA to be available at all points of work – operatives must be informed of this JHA and understand the risks involved in the
General safety condition
works.
requirements:
Tool box talk / pre-job brief to be given at the start of each work shift and before starting a new task or activity.
Summer and Ramadan working hours changes are to be observed and details posted at worksite.
Paramedical or ambulance facilities to be available.
Minimum PPE required: Hard hat, safety glasses or goggles, hi-viz jacket, overalls, gloves, safety shoes
E – Environmental
LS Likelihood / Frequency
Consequence: H – Health
CS Severity of consequence
S - Safety
Scaffolding ● Fall from Accident fatality High 1. 100% fall protection required during Moderate Scaffoled Moderate
elevated Personal injury assembly
Erection 2. Personal shall not be exposed to
inspector
heights
unprotected sided or falls grater then Site
1.8M
3. All scaffolding is required to install full Manager.
access Site
4. Install proper bracing
Supervisor
5. Don’t make open hole on scaffolding
6. Personal shall be tied off to a vertical or
life line with a rope grape min diameter Foreman.
16mm during assemble of scaffolding
Activities Hazards Consequence 1st Risk Control Measures 2nd Risk Action Residual
(E/H/S) Assessme Assessm by risk
nt ent (Due date)
(High/ (High/
Moderate/ Moderate/
Working ● Fall from Major Injury High 1- Check the weather in site Moderate Site Low
through height always and stop work in the Sup.
bad weather ● Dropped
event of rain, ro
objects
2- electrical storm or high winds Foreman.
3- Make box and put all tools
inside.
buffing)
Prepared by: Sub-con Project Reviewed by: HSE Manager: Approved by: Discipline Manager:
Manager: Name: Name:
Name: Chang Signature: Signature:
Young Ho
Signature: