0% found this document useful (0 votes)
39 views3 pages

WTU-SP-PL-NE-192-VII-24Rev.06 Pro. Factory Building PT. Chin Hsin - Plumbing Pump - PT Roket Jaya - BPK Adam

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views3 pages

WTU-SP-PL-NE-192-VII-24Rev.06 Pro. Factory Building PT. Chin Hsin - Plumbing Pump - PT Roket Jaya - BPK Adam

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Customer : PT Roket Jaya Abadi Our Reference : WTU/SP-PL/NE/192/VII/24Rev.

06
Attention : Mr Adam Date : July 31, 2024
Phone : +62
Email :
End User : -

PROJECT NAME: FACTORY BUILDING PT CHIN HSIN - Plumbing Pump

Dear Sir,

We thank you for your inquiry, it's highly appreciated to get the opportunity to give you our commercial proposal as follow.

Plumbing Pump Rp 78.500.000


Validity : 14 days or fluctuation on currency as said below which ever
occire first

*) Price valid with applicable today currency with tolerance ± Rp. 50,- base on BCA T/T counter rate as per quotation date adjusment of from above price shall
be made when the currency fluctuated beyond the said tolerance

*) Price are valid for total quantity and specification mention here in, any change in quantity will effect to the other item unit price

Term and Condition

▪ Taxes : VAT, and any other taxs are Excluded

▪ Payment : - 20% Down Payment to be paid 7 days calendar from the date of receiving our invoice
- 75% MOS to be paid 30 days calendar from the date of receiving our invoice
- 5% TC to be paid 30 days calendar from the date of receiving our invoice

* Penalties of delay payment will be applied as 1 per mill / day of max 10% of from total contract, if the maximum value of
penalties has been reached, PT W.T.U reserve to cancel the obligation to supply the material, and the total of successfull progress
payment will be waived / will not return back.

▪ PT W.T.U reserve the right to stop any work progress and withdraw the goods from jobsite if the payment progress failed to be paid within agreed schedule

▪ Delivery Time : - 3 Month upon receiving Down Payment into our company Bank Account

- one time shipment / partial not allowed, unless as per agreed schedule before purchase order

▪ Delivery Point : Franco Subang on Truck (only)

▪ Warranty : 12 month after successfull start up or 18 month after shipment which ever occure first

▪ Scoope of Work : - 1 visit (3 working days each visit) of combined supervision - startup & commisioning - onsite training

- 1x In class training with documentation 5 copies, additional copies can't be provided at additional cost Rp. 250.000/copy

▪ Cancellation : - within the first two (2) weeks after order date : 25% charge of total contract
- after first two weeks from order date : 100% charge / no cancellation

▪ Limited Warranty : - Only Applicable for manufacturer defect (consumable are not included)

- Accomodation & Transportation Expenses for Job(s) with Location outside Jakarta Area will be Born to Buyer
▪ Extended Manday Rate : - If within warranty period Rp. 2.000.000 / day / OnShore
Rp. 4.500.000 / day / OffShore

- If Beyond warranty period Rp. 2.500.000 / day / OnShore


Rp. 7.500.000 / day / OffShore

* Man-day rate are exclude of transportation & Accomodation + meal which are subject to be born to buyer

▪ Storage charge : Rp. 2.000.000,- / m³ / week will be apply for shipment that are postponed when the goods ready to ship.

▪ Manufacture Data Report : - Include one odner of hardcopy


- Include one softcopy
- Additional hardcopy subject to be charge each Rp 1.000.000,-

We hope our offer suits your needs, Should you require further information and/or clarification please do not hesitate to contact us.

We appreciated your positive response on our offer and looking forward to have mutual beneficial cooperation with your esteem company.

Best Regards,
PT Widjaja Teknik Utama

Agree on the price and term as above,


(E-quote, no signature required)

Natalia Ester Ryan Ahmad


Account Executive Account Manager (Customer..……………...…………………)
+62 818-0882-7070 +62 812 8054 0097
Project : FACTORY BUILDING PT CHIN HSIN - Plumbing Pump

No DESCRIPTION Qty Unit UNIT PRICE TOTAL PRICE

1 Booster Pump (Office) 1 Set 2 Pompa 1 Set Rp 37.400.000 Rp 37.400.000


Brand : IRONGUARD
Model : IG-HCPBS 4-40
Type : Horizontal Multistage
Capacity : 2 x 100 Lpm
Total Head : 15.3 Meter
Shaft Seal : Mechanical Seal
Suction x Discharge : 1 1/4" x 1"
Motor : Factory Standard, Include Inverter
Power : 2 x 0.75 kW @ 2900 RPM, 380V/3Ph/50Hz
Include :
- Panel Power
- Membrane Tank

2 Booster Pump (Canteen) 1 Set 2 Pompa 1 Set Rp 41.100.000 Rp 41.100.000


Brand : IRONGUARD
Model : IG-HCPBS 10-50
Type : Horizontal Multistage
Capacity : 2 x 100 Lpm
Total Head : 30 Meter
Shaft Seal : Mechanical Seal
Suction x Discharge : 1 1/2" x 1 1/4"
Motor : Factory Standard, Include Inverter
Power : 2 x 2.2 kW @ 2900 RPM, 380V/3Ph/50Hz
Include :
- Panel Power
- Membrane Tank

Price indicate on this quotation only valid for any specification and/or material specify herein Rp 78.500.000
Total FOT Subang
Price are valid through order as one packaged, any change in quantity will effect the unit price
In Rupiah

You might also like