Assignment-II Group
Assignment-II Group
1. If the decision maker knows nothing about the probabilities of the three states of nature, what
is the recommended decision using the: (5 pts)
A. Optimistic
B. Conservative
C. Criteria of realism if the coefficient of optimism is 0.4.
D. Equally likely criteria
E. minimax regret approaches
2. If the demand probabilities are 0.2, 0.5, and 0.3 from high to low respectively, which decision
alternative will minimize the expected cost of the data processing operation using: (2 pts)
A. Expected monetary value
B. Expected opportunity loss
C. Expected value of perfect information
[4] A management department head at Mekdela Amba university has six instructors to be
assigned to six different courses. All instructors are skilled and capable of teaching all courses,
but each instructor is not equally efficient on each course. The table below shows the time (in
hours) it takes an instructor to complete a course with in six weeks teaching period. The
department head wants to know the appropriate assignment of course to instructors so that the
time it takes to taught the different courses will be minimized.
Average number of hours required to complete course
Courses
Instructors Operation Strategic Material Financial System Introduction
research management management management analysis to
(OR) (SM) (MM) (FM) (SA) management
(IM)
Amanuel (AM) 13 22 19 21 16 20
Solomon (SH) 18 17 24 18 22 27
Denekew (DG) 20 22 23 24 17 31
Yeshiwas (YA) 14 19 13 30 23 22
Misrak (MN) 21 14 17 25 15 23
Addisu (AD) 17 23 18 20 16 24
A) formulate the problem as a linear programming Model (2 pts)
B) Find the optimal assignment so that the total time required to teach all the courses will be
minimized and determine the minimum time (hours) on the optimal assignment (3 pts) Use
the Hungarian method.