Site Waste Minimisation and Management Plan
Site Waste Minimisation and Management Plan
Applicant Details
Application No.
Name
Address
Phone number(s)
Project Details
Address of development
Name
Signature
Date
SWMMP Page 1 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)
Type of waste generated Estimate Estimate Volume Estimate Volume Specify method of on site
Volume (m3) (m3) or Weight (t) (m3) or Weight (t) reuse, contractor and
or Weight (t) recycling outlet and /or waste
depot to be used
Excavation material
Timber (specify)
Concrete
Bricks/pavers
Tiles
Metal (specify)
Glass
Furniture
Floor coverings
Garden organics
Paper/cardboard
Residual waste
Other (specify)
SWMMP Page 2 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)
Excavation material
Timber (specify)
Concrete
Bricks
Tiles
Metal (specify)
Glass
Plasterboard (offcuts)
Floor coverings
Garden organics
Paper/cardboard
Residual waste
SWMMP Page 3 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)
Residual
Recyclables Compostables Other
Type of Waste and Estimated waste*
volumes Paper/ Metals/
cardboard plastics/glass
** Amount generated
(L per unit per day)
** Amount generated
(L per development per week)
* Current “non-recyclables” waste generation rates typically include food waste that
might be further separated for composting.
** For more information: REFER Schedules under Ryde DCP 2010 Part 7.2 Waste
Minimisation and Management for information about bin sizes, numbers and waste generation
rates
*** For more information: REFER Council’s website for Waste and Recycling frequency of
service information at: www.ryde.nsw.gov.au, or
http://www.ryde.nsw.gov.au/Environment/Waste+and+Recycling
or phone Council’s Customer Service Centre on 9952 8222
SWMMP Page 4 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)
Lifecycle
SWMMP Page 5 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)
SWMMP Page 6 of 6