0% found this document useful (0 votes)
13 views6 pages

Site Waste Minimisation and Management Plan

Uploaded by

bogame01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views6 pages

Site Waste Minimisation and Management Plan

Uploaded by

bogame01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

SITE WASTE MINIMISATION AND

MANAGEMENT PLAN (SWMMP)

Section 1: Applicant and Project Details (All Developments)

Applicant Details

Application No.

Name

Address

Phone number(s)

Email

Project Details

Address of development

Existing buildings and other


structures currently on the site
Description of proposed
development
This development achieves the waste objectives set out in City of Ryde DCP. The details on this form are
the provisions and intentions for minimising waste relating to this project. All records demonstrating lawful
disposal of waste will be retained and kept readily accessible for inspection by regulatory authorities such
as Council, Office of Environment and Heritage or WorkCover NSW.

Name

Signature

Date

SWMMP Page 1 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)

Section 2: Demolition (All Types of Developments)

Address of development: _________________________________________________

most favourable least favourable

Reuse Recycling Disposal

Type of waste generated Estimate Estimate Volume Estimate Volume Specify method of on site
Volume (m3) (m3) or Weight (t) (m3) or Weight (t) reuse, contractor and
or Weight (t) recycling outlet and /or waste
depot to be used

Excavation material

Timber (specify)

Concrete

Bricks/pavers

Tiles

Metal (specify)

Glass

Furniture

Fixtures and fittings

Floor coverings

Packaging (used pallets,


pallet wrap)

Garden organics

Containers (cans, plastic,


glass)

Paper/cardboard

Residual waste

Hazardous/special waste e.g.


asbestos (specify)

Other (specify)

SWMMP Page 2 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)

Section 3: Construction (All Types of Developments)

Address of development: _________________________________________________

most favourable least favourable

Reuse Recycling Disposal

Type of waste generated Estimate Estimate Estimate Specify method of on


Volume Volume Volume (m3) site reuse, contractor
(m3) or 3
(m ) or or Weight (t) and recycling outlet
Weight (t) Weight (t) and/or waste depot to
be used

Excavation material

Timber (specify)

Concrete

Bricks

Tiles

Metal (specify)

Glass

Plasterboard (offcuts)

Fixtures and fittings

Floor coverings

Packaging (used pallets, pallet wrap)

Garden organics

Containers (cans, plastic, glass)

Paper/cardboard

Residual waste

Hazardous/special waste (specify)

SWMMP Page 3 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)

Section 4: Ongoing Operation


(Residential, Multi Unit, Commercial, Mixed Use and Industrial)

Address of development: _________________________________________________

Residual
Recyclables Compostables Other
Type of Waste and Estimated waste*
volumes Paper/ Metals/
cardboard plastics/glass

** Amount generated
(L per unit per day)

** Amount generated
(L per development per week)

Any reduction due to


compacting equipment

*** Frequency of collections


(per week)

** Number and size


of storage bins required

Floor area required for


storage bins (m2)

Floor area required for


manoeuvrability (m2)

Height required for


manoeuvrability (m)

* Current “non-recyclables” waste generation rates typically include food waste that
might be further separated for composting.
** For more information: REFER Schedules under Ryde DCP 2010 Part 7.2 Waste
Minimisation and Management for information about bin sizes, numbers and waste generation
rates
*** For more information: REFER Council’s website for Waste and Recycling frequency of
service information at: www.ryde.nsw.gov.au, or
http://www.ryde.nsw.gov.au/Environment/Waste+and+Recycling
or phone Council’s Customer Service Centre on 9952 8222

SWMMP Page 4 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)

Section 5: Construction Design (All Types of Developments)


Outline how measures for waste avoidance have been incorporated into the design, material purchasing and
construction techniques of the development:
Materials

Lifecycle

SWMMP Page 5 of 6
SITE WASTE MINIMISATION AND
MANAGEMENT PLAN (SWMMP)

Section 6: Ongoing Management of Waste (All Types of Development)


Detail the arrangements that would be appropriate for the ongoing use of waste facilities as provided in the
development. Identify each stage of waste transfer between residents’ units/commercial tenancies and
loading into the collection vehicle, detailing the responsibility for and location and frequency of, transfer and
collection.

SWMMP Page 6 of 6

You might also like