0% found this document useful (0 votes)
9 views1 page

Commented

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views1 page

Commented

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Employer Construction of Townhouses & Semi-Detached Villas Phase 1B & 1C

Employer Project Manager Royal Development Company


Employer Project Manager RAPM Architect Project Management
Engineer AECOM Middle East LLC
Main Contractor M/s. Trojan General Contracting LLC
MEP Contractor M/s. Royal Advance Electromechanical Works LLC
Name: Ahmed M S Abouswirh Position: Project Manager Company: ROYAL ADVANCE ELECT.
From
Name: Sharaf Shaban Bamne Position: Projects Director/Project Manager Company: TROJAN
To Name: Suheib Aboamir Position : Resident Engineer (RE) Company: AECOM
Name: Mohammad Mostafa Position: Project Manager Company: RAPM
cc1 Name: Azem Al-Kurdi Position : Project Manager Company:RDC
Name: Tan Choon Wiew Position : Project Director Company: Q - Properties
MATERIAL INSPECTION REQUEST
Material Submittal Reference : RHP1P2-BW-TGC-ZZ-XX-MT-EL-00002_01 MIR Ref.No : : RHP1P2-BW-TGC-ZZ-XX-MI-EL-00003_00

Description/Source of Material :

Material Inspection request for PVC Conduit & Accessories (Decoduct)

Delivery Note Ref: WS0705705,WS0705709,WS0705706

Quantity : As per attached Dos


Supplier : :M/s.Interplast CO. LTD
Manufacturer: M/s. Decoduct
Date of Receipt of Material On Site : 23/07/2024
Storage Location :
Site Yard

Contractor Signature Date :24/07/2024 Notification Received by Consultant Signature Date

Inspection Report Check One Initials


Physical Damage ? [ ] Yes [ ] No
Details Given Above Correct ? (Type, size, wt, qty, etc) [ ] Yes [ ] No
Conform With Approval Submission ? (Certificate, etc) [ ] Yes [ ] No
Engineer's Remarks:
1. Material inspected as per attached DO and Material submittal, Subject to fully compliance with the Engineer's given comments on the relevant material submittal.
2. PVC solvent cement & Adapter box 30X30cm are excluded from inspection, since both material are not part of approved material submittal.
3. Required wall thickness measurement shall be verified in line with the project specification and relevant material submittal.
4. Contractor shall protect the material properly in line with manufacturer recommendation. Irfan/Emad Ali
Name : Date & Signature 29-07-2024
Material Engineer's Remarks
The above materials have been inspected on Site and found at the time of inspection to be :
[ ]- Satisfactory [ ] - Unsatisfactory
Name : Date & Signature
RE's Remarks

Name : Suheib Aboamir 30/07/2024 Date & Signature

Approved
Approved as Noted
Revise & Resubmit
Rejected