Variation 20 Rev 2
Variation 20 Rev 2
Agreement Details:
Railway Name: Northern Railway Unit Name: Lucknow Department Name: Civil
Tender Number: Tender Type: Open Tender Opened On: 31/08/2021
Tender Validity (Up To): 01/09/2021 Nature of Contract: Works LOA Number: 01222220046844
LOA Date: 21/12/2021 LOA Amount (Rs.): 10242265 PG Amount (Rs.): 222588.0
Contractor's Name: SATISH SHARMA-UNNAO Contractor's Code: 122222 Date of Completion: 21/12/2022
Agreement No: NR/LKO/Civil/2022/0009 Agreement Date: 19/04/2022 Variation Number: 2
Name of Work Under LKO :- Heavy repair of new & old washing line damage pit,cat walk & drain and heavy repair of track inserts & bed block in the section of SSE-W-LKO under
Proposed LOA: ADEN-I-LKO, provision of barricading work in Railway land from N.R. Co-operative bank to City hospital in the section of SSE-W-AMV-East and heavy repair to Main open
drain in east yard behind Sewagram colony in the section of SSE-W-CBunder ADEN-HQ-LKO.
Signature Not Verified Signature Not Verified Signature Not Verified Signature Not Verified
Digitally signed by RAKESH KUMAR Digitally signed by Shashi Bhushan Digitally signed by SATISH SHARMA Digitally signed by NEERAJ KUMAR
Date: 2022.10.22 02:07:11 PDT Manchanda Date: 2022.11.14 12:22:53 IST SHUKLA
Reason: Variation Signing By Date: 2022.10.22 02:20:32 PDT Reason: Variation Signing By Date: 2022.11.14 12:44:02 IST
Reason: Variation Signing By Contractor Reason: Variation Signing By Sr. DEN-I/LKO
SSE(W)/LKO ADEN/LKO I
Signature Not Verified Signature Not Verified Signature Not Verified Signature Not Verified
Digitally signed by RAHUL DEO Digitally signed by RANJEET Digitally signed by SAMEER Digitally signed by ANKUR SRIVASTAVA
KUMAR SRIVASTAV Date: 2022.10.31 16:23:31 IST
Date: 2023.01.10 17:36:56 IST Date: 2022.10.28 16:09:16 IST
Date: 2023.01.17 11:11:05 IST Reason: Variation Signing By
Reason: Variation Vetted By Reason: Variation Signing By osbsrden1lko
DFM/LKO Reason: Variation Approval ssetechnical1
Schedules Details:
Amount(Rs.) up to Last Amount(Rs.) as per Proposed Amount(Rs.) as per Proposed %age Variation, Including
Schedule Org. Agmt. Amount(Rs.) Total %age Variation
Variation Qty Qty, Including Special Cond. Spcl. Cond.
B 1,182,105 1,182,105 1,729,830 1,722,736.34 46.335 45.735
A 10,483,915.338 11,124,459.72 11,500,839 11,500,839 9.7 9.7
C 0 2,415,289.53 2,237,084.4 2,237,084.4
D 0 0 296,823.5 296,823.5 100 100
Total of All above 11,666,020.339 14,721,854.25 15,764,576.9 15,757,483.24 35.132 35.072
Schedules:
Total of New Schedules: 0 2,533,907.9 2,533,907.9
Total of Old Schedules: 11,666,020.339 13,230,669 13,223,575.34
Rebate (36.4 %) on Org 4,246,431.403 Rebate (36.4 %) on Org Sdl 4,813,381.424
Sdl
Total Amount 7,419,588.935 Total Amount 10,944,101.816