Anup 3
Anup 3
Unit
Item
Description of Item Quantity Unit Rate per Amount
no
rate
E/W IN EXCAVATION ,
Earth work in excavation of foundation
trenches or drains, in all sorts of soil
(including mixed soil butexcluding laterite
or sandstone) including removing,
spreading or stacking the spoils within a
lead of 75 m as directed. The item
includes necessary trimming the sides of
1 trenches, levelling,dressing and ramming Cu m 11927 % Cu m
the bottom, bailing out water as required
complete.
(a) Depth of excavation not exceeding
1.5m.
(Ref- item2(a) page-1 PWD)