RINGKASAN TENDER
KERJA-KERJA LUAR
C BQ C/4
(Semua Kuantiti Adalah Sementara)
Project Signboard
B The Contractor shall employ a licensed surveyor to carry out site surveys before
commencement and setting out of the Works.
C The Contractor shall enquire from the various authorities and make
arrangements for the disconnection, removal, relocation and reconnection of
services and pay all necessary cost and fees in connection therewith and make
good all damage as specified.
Construction Plan
D The Contractor shall submit to the S.O. for his approval the following
as specified :
a) Programme of Works
b) Method statements
c) Contractor's organisation chart
d) Schedules
e) Quality Assurance Plan for Works Contract worth RM10 Million
and above
i) Provide a quality Assurance Team full time on Site for the institution,
administration and maintenance of the Quality Assurance Plan and the
preparation and submission of all Quality Assurance Reports as specified,
throughout the duration of the contract.
ii) The Contractor shall appoint a suitably qualified and experienced person to
act solely as a Quality Assurance Officer full time on site to lead Quality
Assurance Team. (Refer Addendum to specification for project worth RM
10 Million and above)
Contractor's Plant
E The Contractor shall provide, erect, keep insured, maintain and remove on
completion all requisite scaffolding, hoist, cranage, construction plant, ladder,
staging, tarpaulins, et cetera (excluding piling and pile testing equipment), as
necessary for the execution of the Works.
A1/6 To Collection
TOTAL AMOUNTRM(RM)
A The Contractor shall provide adequate power and water supplies for the
execution of the works including paying all associated costs and fees as
specified.
Site Security
B The Contractor shall provide all necessary personnel and lighting for the
security of the site at all times until completion of the whole Works as specified.
C The Contractor shall provide and maintain all necessary temporary roads,
culverts, tracks, bridges, et cetera for access to and within the Site as specified.
D The Contractor shall maintain all access including existing roads, bridges,
drains, culvert, roadside furniture, and all other appurtenance and services on
such roads throughout the construction period. The Contractor shall make good
any above mentioned item damaged by any work carried out by him.
E The Contractor shall located the actual position and provide support and full
protection of existing services and mains during the progress of the Works. The
Contractor shall inform the S.O of all arrangements with the various authorities
F The Contractor shall ensure the safety, health and welfare at work of all his
workmen as specified.
G The Contractor shall provide and maintain all temporary accommodation and
facilities including temporary lighting, plumbing, water storage, sanitary and
sewerage for his labour and staff living on Site as specified.
H The Contractor shall provide and maintain Contractor's office and storage on
the Site in positions as approved by the S.O. and as specified
J The Contractor shall provide and maintain everything necessary for proper
protection of materials and Works from any damage by weather.
A1/7 To Collection
TOTAL AMOUNT RM(RM)
A The Contractor shall submit relevant shop drawings, plan working details,
samples of materials or workmanship and mock-ups units as specified for the
S.O.'s approval.
Progress Photographs
B The Contractor shall take progress photographs and submit to the S.O. as
specified
C The Contractor shall provide/erect a testing laboratory within the site or rent a
premise or propose an accredited laboratory approved by SIRIM as specified.
The Laboratory shall be equipped with the necessary equipment and staff
required to carry out the tests as identified in APPENDIX A/4 (List of Laboratory
Equipment).
D The Contractor shall provide and maintain a site office or relocatable site office
or rent a premise for the use of the JKR supervisory staff which shall meet the
requirement of the JKR design as specified.
E The Contractor shall provide a permanent telephone at the S.O.'s site office for
the sole use of the S.O. and his representatives as specified.
F The Contractor shall provide all such instruments, equipment and survey
personnel as specified throughout the duration of the original Contract Period
until 6 months after the issuance of the Certificate of Practical completion as
per SO required.
G The Contractor shall provide all Personal Protective Equipment required for the
use of the S.O. and his supervisory staff complete as specified and complying
with DOSH requirements.
J The Contractor shall provide the equipment and facilities as listed as specified
in APPENDIX A/2/1 for the use of the S.O., his representatives and staff
throughout the duration of the original Contract Period.
A1/8 To Collection
TOTAL AMOUNTRM(RM)
A The Contractor shall supply, erect, maintain and remove on completion of the
Works, scaffolding and working platform with safety nettings, catch platforms,
safety barricades, fencing, railing, screen wire netting and toe board, guardrails
or board fences and sufficient illuminations, all as specified.
B The Contractor shall supply, erect, maintain and remove on completion of the
Works, adequate, protective and security hoarding, scaffolding and working
platform with safety nettings and such other safety measures necessary to
ensure the safety of the workers, personnel, public and others at or within the
vicinity of the Site, all as specified.
C The Contractor shall ensure the safety, health and welfare at work site as
specified including but not limited to :
D * The Contractor shall employ a Safety and Health Officer (SHO) registered
with DOSH for the entire contract period to be stationed fulltime at the site (for
works exceeding RM 20 million contract value)
* Delete if not applicable
E * The Contractor shall employ a Site Safety Supervisor (SSS) registered with
DOSH to be stationed a minimum of 15 hours a week at the site for the entire
duration of the construction period
F The Contractor shall submit 5 copies of Safety and Health Plan (S-Plan) as
required in APPENDIX A/5 as specified.
G The Contractor shall submit 5 copies of monthly Safety and Health Report as
required in APPENDIX A/6 as specified.
H The Contractor shall provide and maintain adequate traffic safety and control
including signages, warning lights and flagmen as necessary.
J The Contractor shall make every effort to keep the Site in a reasonably clean
and tidy condition for the duration of the Works as specified.
A1/9 To Collection
TOTAL AMOUNTRM(RM)
As - built Drawings
B The Contractor shall provide and deliver to the S.O. approved As-built drawings
after completion of each section of the Works in the form of :
2 Four (4) sets of Digital Copies in AutoCAD (.dwg) or any other compatible
format to be stored in compact discs or removable storage.
3 Four (4) sets of Digital Copies in Acrobat (.pdf) or any other compatible
format to be stored in compact discs or removable storage
C The Contractor shall clear and clean the Works including existing roads, drains
bounding the Site of any debris,earth, et cetera, and make good all damages
upon completion as specified.
A1/10 To Collection
TOTAL AMOUNTRM(RM)
Form of Contract
The Contractor shall refer to the Standard Form of Contract for further
information. The Contractor may price here for all the expenses involved in
complying with the terms of these Clauses, otherwise such expenses are
demeed to be included elsewhere.
Clause No.13
A Performance Bond
For due observance and performance of this contract the Contractor shall have
to provide :
Clause No.15
Clause No.16
Clause No.17
Clause No.18
E Insurance of Works
A1/11 To Collection
TOTAL AMOUNTRM(RM)
Clause No.22
Clause No.35
C The Contractor shall keep constantly on the Site for the full duration of the
Contract a competent, efficient, suitably qualified, experienced and good
character Site Agent and his assistants in each trade as may be necessary,
who must be capable of receiving instructions in Bahasa Malaysia, and in
default it shall be the responsibility of the Contractor to provide replacement for
them and all wages and other expenses in connection with the employment of
such replacement site agent and assistants. Any directions, explanations or
instructions given to such site agent by the S.O. shall be deemed to have been
given to the Contractor under this contract provide all necessary superintending
order.
A1/12 To Collection
TOTAL AMOUNTRM
(RM)
COLLECTION
A1/13
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
BQ B/1
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
BQ B/2
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
D BLOK D M 130
E BLOK F M 130
F SURAU M 250
H BLOK D NO 12
J BLOK F NO 12
K SURAU NO 20
BQ B/3
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A BLOK D NO 80
B BLOK F NO 80
C SURAU NO 80
E BLOK D NO 20
F BLOK F NO 20
G SURAU NO 30
Bekal dan pasang 100mm diameter salur tegak air hujan mengikut
MS 1063 dengan sambungan soket dan dipasang pada dinding
dengan bolt dan pendakap sebagaimana kelulusan Pegawai
Penguasa.
J BLOK D NO 120
K BLOK F NO 120
L SURAU NO 80
BQ B/4
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A Kerja-kerja mengecat satu (1) lapisan cat alas serta dua (2) lapisan M2 8200
cat rintangan cuaca (weathershield) pada permukaan dinding luar
dan permukaan kayu termasuk kerja mengikis,membersih
permukaan, sapu bahan tampal serta lain-lain kerja berkaitan
sebagaimana arahan Pegawai Penguasa.
(BLOK A, BLOK B, BLOK C, BLOK D, BLOK E, BLOK F,
MAKMAL, SURAU, BENGKEL RBT TEORI, BENGKEL RBT
PERTANIAN, BENGKEL PVMA, KANTIN, BLOK KESIHATAN,
KOPERASI, BENGKEL PENDIDIKAN SENI VISUAL, RUMAH PAM
BOMBA, PONDOK PENGAWAL)
B Kerja-kerja mengecat satu (1) lapisan cat alas serta dua (2) lapisan M2 8972
cat emulsi pada permukaan dinding dalam dan permukaan kayu
termasuk kerja mengikis,membersih permukaan, sapu bahan tampal
serta lain-lain kerja berkaitan sebagaimana arahan Pegawai
Penguasa.
(BLOK A, BLOK B, BLOK C, BLOK D, BLOK E, BLOK F,
MAKMAL, SURAU, BENGKEL RBT TEORI, BENGKEL RBT
PERTANIAN, BENGKEL PVMA, KANTIN, BLOK KESIHATAN,
KOPERASI, BENGKEL PENDIDIKAN SENI VISUAL, PONDOK
PENGAWAL)
C Kerja-kerja mengecat satu(1) lapisan cat alas serta dua (2) lapisan M2 9000
cat emulsi pada permukaan siling dan skim coat termasuk kerja
mengikis, membersih permukaan, sapu bahan tampal serta lain-lain
kerja berkaitan sebagaimana arahan Pegawai Penguasa.
(BLOK A, BLOK B, BLOK C, BLOK D, BLOK E, BLOK F,
MAKMAL, SURAU, BENGKEL RBT TEORI, BENGKEL RBT
PERTANIAN, BENGKEL PVMA, KANTIN, BLOK KESIHATAN,
KOPERASI, BENGKEL PENDIDIKAN SENI VISUAL, RUMAH PAM
BOMBA, PONDOK PENGAWAL)
D Kerja-kerja mengecat satu(1) lapisan cat anti karat dan dua (2) M2 50
lapisan cat emulsi pada susur tangan (handrail ) termasuk kerja-
kerja mengikis, mencuci dan membersih permukaan sebagaimana
arahan Pegawai Penguasa.
(BLOK A, BLOK B, BLOK C, BLOK D, BLOK E, BLOK F,)
BQ B/5
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A Kerja-kerja mengecat satu(1) lapisan cat anti karat dan dua (2) M2 380
lapisan cat emulsi pada jeriji keselamatan (grill) termasuk kerja-
kerja mengikis, mencuci dan membersih permukaan sebagaimana
arahan Pegawai Penguasa.
BQ B/6
SMK Renek 01-02-24 - 3:21 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A Menanggal serta mengganti baru bingkai pintu dan bingkai tingkap M 100
yang rosak mengikut saiz sediaada sebagaimana arahan Pegawai
Penguasa.
B Menanggal serta membekal dan memasang pintu panel kayu keras NO 175
satu daun yang diluluskan bersaiz 900mm x 2100mm atau sebarang
saiz termasuk bingkai serta segala peralatan kelengkapan pintu dan
dengan kemasan 'varnis' atau cat dua lapisan sebagaimana yang
diluluskan oleh Pegawai Penguasa.
(BLOK A, BLOK B, BLOK C, BLOK D, BLOK E, BLOK F,
MAKMAL, SURAU, BENGKEL RBT TEORI, BENGKEL RBT
PERTANIAN, BENGKEL PVMA, KANTIN, BLOK KESIHATAN,
KOPERASI, BENGKEL PENDIDIKAN SENI VISUAL,)
C Menanggal serta membekal dan memasang pintu panel kayu keras NO 232
dua daun yang diluluskan bersaiz 1800mm x 2100mm atau
sebarang saiz termasuk bingkai serta segala peralatan kelengkapan
pintu dan dengan kemasan 'varnis' atau cat dua lapisan
sebagaimana yang diluluskan oleh Pegawai Penguasa.
(BLOK A, BLOK B, BLOK C, BLOK D, BLOK E, BLOK F,
MAKMAL, SURAU, BENGKEL RBT TEORI, BENGKEL RBT
PERTANIAN, BENGKEL PVMA, KANTIN, BLOK KESIHATAN,
KOPERASI, BENGKEL PENDIDIKAN SENI VISUAL)
BQ B/7
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A Membekal dan memasang pintu pejabat satu daun jenis 'half glass NO 10
door' termasuk bingkai serta lain-lain kelengkapan berkaitan
sebagaimana yang diluluskan oleh Pegawai Penguasa.
(BLOK D )
B Door Closer NO 80
C Kunci/Tombol NO 60
D Engsel NO 50
BQ B/8
SMK Renek 01-02-24 - 3:21 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
BQ B/9
SMK Renek 01-02-24 - 3:21 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A 25mm Tebal turapan simen dan pasir (1:3) atau skrid dilepa licin M2 1150
pada permukaan lantai.
F 75mm Tebal konkrit G30 pada bahagin lantai apron yang rosak. M2 250
G 25mm Tebal turapan simen dan pasir dilepa licin pada permukaan M2 250
lantai.
BQ B/10
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
PEMBAIKAN DINDING
A Menanggal, membekal dan memasang baru dinding dua lapis dari M2 650
jenis "Gypsum Board Bercorak" 12mm tebal atau sebarang jenis
termasuk kelengkapan dan lain-lain kerja berkaitan sebagaimana
arahan Pegawai Penguasa.
(BLOK D, BLOK F, BLOK KESIHATAN)
BQ B/11
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A Pecah dan tanggal jubin lantai dan dinding sediaada untuk M2 940
penyediaan jubin baru sebagaimana arahan Pegawai Penguasa.
(BLOK A, BLOK B, BLOK C, BLOK D, BLOK F, SURAU, BLOK
KESIHATAN)
BQ B/12
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
BQ B/13
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
D cermin muka M2 57
BQ B/14
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
LUKISAN NO:
1. PELAN LANTAI
2. PANDANGAN HADAPAN, PANDANGAN BELAKANG
3. KERATAN X-X, KERATAN Z-Z, KERATAN Y-Y
4. PELAN BUMBUNG, PELAN SILING DAN ELEKTRIK
5. JADUAL PINTU DAN TINGKAP
Nota;
BQ B/15
SMK Renek 01-02-24 - 3:22 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
F Membuka dan menanggal pemeleh (fascia board) jenis keluli yang M 100
rosak serta mengganti pemeleh yang baru sebagaimana kelulusan
Pegawai Penguasa.
BQ B/16
SMK Renek 01-02-24 - 3:22 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
Jumlah Dari Hadapan BQ /B16
BQ B/17
SMK Renek 01-02-24 - 3:22 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
LUKISAN NO:
1. JKRB.SMKR(DEWAN JAUHARI)/1/1/2023
2. JKRB.SMKR(DEWAN JAUHARI)/1/2/2023
3 JKRB.SMKR(DEWAN JAUHARI)/1/3/2023
4. JKRB.SMKR(DEWAN JAUHARI)/1/4/2023
5 JKRB.SMKR(DEWAN JAUHARI)/1/5/2023
6. JKRB.SMKR(DEWAN JAUHARI)/1/6/2023
7 JKRB.SMKR(DEWAN JAUHARI)/1/7/2023
8. JKRB.SMKR(DEWAN JAUHARI)/1/8/2023
9 JKRB.SMKR(DEWAN JAUHARI)/1/9/2023
Nota:
Lukisan Struktur perlu disediakan oleh pihak kontraktor dan
mestilah diperakui oleh Jurutera bertauliah (P.E) yang
berdaftar dengan Lembaga Jurutera Malaysia.
BQ B/18
SMK Renek 01-02-24 - 3:22 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
A Bekal dan pasang 100mm diameter salur tegak air hujan mengikut M 200
MS 1063 termasuk sambungan soket dan liku serta dipasang pada
dinding dengan bolt dan pendakap sbagaimana kelulusan Pegawai
Penguasa.
BQ B/19
SMK Renek 01-02-24 - 3:22 PM
JKR E-Tender | SD211123
RINGKASAN HARGA
MUKA HARGA
BIL BUTIRAN KERJA
SURAT RM
BQ B/20
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
C KERJA-KERJA LUAR
( Semua Kuantiti Adalah Sementara )
B Membekal dan memasang tiang dari jenis keluli lembut berongga KG 616
mengikut kesesuaian saiz di tapak
D Kepingan jejaring A 10 M2 90
E Membekal dan memasang besi kekuda dari keluli lembut berongga KG 6500
termasuk merangka dan mengimpal mengikut kesesuaian saiz di
tapak serta kerja-kerja mengecat.
F Membekal dan memasang bumbung dek logam berombak jenis clip M2 750
lock 0.48mm BMT tebal termasuk perabung dan segala
kelengkapan bumbung sebagaimana spesifikasi pengeluar dan
G Kerja-kerja mengikis, mencuci dan mengecat semula kerangka Pukal
kekuda besi dan tiang garaj kenderaan dengan satu (1) lapisan cat
anti karat dan dua (2) lapisan cat emulsi sebagaimana arahan
Pegawai Penguasa.
BQ C/1
SMK Renek 01-02-24 - 3:23 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
C Membekal dan memasang bumbung dek logam berombak jenis clip M2 500
lock 0.48mm tebal termasuk perabung dan segala kelengkapan
bumbung serta dipasang sebagaimana spesifikasi pengeluar dan
kelulusan Pegawai Penguasa.
D Kerja-kerja mengecat satu(1) lapisan cat anti karat dan dua (2) No 100
lapisan cat emulsi pada permukaan tiang besi termasuk kerja-
kerja mengikis, mencuci dan membersih permukaan sebagaimana
arahan Pegawai Penguasa.
G Membekal dan memasang pintu pagar dari besi jenis wrought iron M2 11
jenis gelungsur bersaiz (1800mm x 6000mm) termasuk konkrit
tiang pagar jenis precast bersaiz (300mm x 300mm) serta lain-lain
kerja berkaitan sebagaimana arahan Pegawai Penguasa.
BQ C/2
SMK Renek 01-02-24 - 3:23 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
PEMBASMIAN ANAI-ANAI
BQ C/3
SMK Renek 01-02-24 - 3:23 PM
JKR E-Tender | SD211123
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
C Membekal tenaga kerja dan peralatan bagi kerja-kerja mengalih dan Pukal
memasang semula kelengkapan/peralatan sekolah yang terlibat di
kawasan pembinaan.
D Membuka dan menanggal susur jalan ( Batu Kerb) sediaada yang M 100
rosak termasuk lain-lain kerja berkaitan sebagaimana arahan
Pegawai Berkuasa.
E Membekal dan memasang susur jalan (batu kerb) dari kokrit M 150
pratuang dengan satu permukaan condong dan panjang yang
sesuai termasuk tapak konkrit serta lain-lain kerja berkaitan
sebagaimana arahan Pegawai Penguasa.
F Kerja-kerja mengecat satu (1) lapisan cat alas serta dua (2) lapisan M2 100
cat rintangan cuaca (weathershield) pada permukaan susur jalan
(kerb) termasuk kerja mengikis,membersih permukaan, sapu
bahan tampal serta lain-lain kerja berkaitan sebagaimana arahan
Pegawai Penguasa.
BQ C/4
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
PAPAN TANDA
B Keuntungan………….% %
BQ D/1
KADAR HARGA
BIL BUTIRAN KERJA UNIT QTY
(RM) (RM)
Kerja-Kerja Elektrik
B Keuntungan…………….% %
Kerja-Kerja Mekanikal
E Keuntungan…………….% %
BQ E/1