Protection Relay & Without Earthing Test Report - Sample

Uploaded by

kyaw htin maw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Protection Relay & Without Earthing Test Report - Sample

Uploaded by

kyaw htin maw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PRIMARY CURRENT INJECTION TEST ON CIRCUIT BREAKER

Name Of Customer:
Installation Address:

Date Of Test : App. Ref. No :


Approved Load : Switchboard :
Service Type : From SPPG Panel Description:
From Landlord

PARTICULARS OF CIRCUIT BREAKER: ACB MCCB

Make : Type : Short Cct Capacity (Icu) :


Serial No : Rated Voltage (Ue ): Rated Current (In) :
Shunt Trip Coil Operating Voltage :

PARTICULARS OF PROTECTION RELAYS:

Relay Make Type CT Ratio Class Burden


O/C Relay :
E/F Relay :

TEST RESULTS:

Phase Secondary Current Primary Trip Tripping Time (s) Spill Current
Injected Setting (A) Current (A) (mA)
L1 - N
L2 - N
L3 - N
(Set for O/C) (Sealed) (Sealed) (50%) (100%)
* L1/ L2/ L3 – N
(Set for E/F) (Sealed) (Sealed) (Sealed)

*Back-up Fuse link Rating /


Direct Acting Setting (A) : L1 L2 L3
D/Acting Tripping Time (s) : L1 L2 L3
Hand Trip: Satisfactory
DECLARATION BY TESTING ENGINEER:

I, declare that the above tests are carried out in accordance with SS/BS/equivalent
standards and to the best of my knowledge, the results comply with the relevant standards and/or engineering
practice.

Signature of Testing Engineer License No. Date

ENDORSEMENT BY LICENSED ELECTRICAL WORKER (LEW):


The above test results are satisfactory and acceptable to me.

Name & Signature of LEW-in-charge of License No. Date


above mentioned installation
(* Delete whichever is not applicable)
OVERCURRENT AND EARTH FAULT RELAY OPERATION TEST
Name Of Customer:
Installation Address:

Date Of Test : App. Ref. No :


Approved Load : Switchboard :
Service Type : From SPPG Panel Description:
From Landlord

PARTICULARS OF PROTECTION RELAYS:

Relay Make Type Tripping Char. Rating Serial No.


O/C Relay :
E/F Relay :

TEST RESULTS:

O/C RELAY E/F RELAY O/C


Plug Sec. Operation Time (s) Plug Setting Sec. Operation TM Setting Std Time
Setting Current L1 L2 L3 ( Io > ) Current Time (s) k (s)
5.0A 10 A
5.0A 15 A
5.0A 25 A
Sealed at Sealed at TM = Sealed at

Plug Setting Starting Current


E/F
(I>) L1 L2 L3
TM Setting Std Time
High Set Operating Current High Set Operating ko (s)
( I >> ) L1 L2 L3 ( Io >> ) Current

Secondary Wiring Insulation Resistance: Sealed at

DECLARATION BY TESTING ENGINEER:

I, declare that the above tests are carried out in accordance with SS/BS/equivalent
standards and to the best of my knowledge, the results comply with the relevant standards and/or engineering
practice.

Signature of Testing Engineer License No. Date

ENDORSEMENT BY LICENSED ELECTRICAL WORKER (LEW):


The above test results are satisfactory and acceptable to me.

Name & Signature of LEW-in-charge of License No. Date


above mentioned installation
(* Delete whichever is not applicable)