0% found this document useful (0 votes)
548 views26 pages

C13 Industrial Engine: Service Repair Manual

Uploaded by

bxt18673
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
548 views26 pages

C13 Industrial Engine: Service Repair Manual

Uploaded by

bxt18673
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

Service Repair Manual

Models

C13 Industrial Engine


w 1/3(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i03533151

Valve Mechanism Cover Base - Remove and Install


SMCS - 1120-010

Removal Procedure
Start By:

a. Remove the valve cover.

Illustration 1 g01861473

1. Disconnect harness assembly (1).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/3(W)

Illustration 2 g01861475

2. Loosen hose clamp (4). Remove bolts (3) and remove breather (2).

Illustration 3 g01861477

3. Remove element (5).

Illustration 4 g01861478

4. Disconnect harness assemblies (6) and (8). Remove valve cover base (7).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 3/3(W)

Illustration 5 g01861512

5. Remove seal (9) from valve cover base (7).

Installation Procedure
1. Install valve cover base (7) in reverse order of removal.

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:26:04 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 1/2(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i07074651

Rocker Arm and Shaft - Remove and Install


SMCS - 1102-010

Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 293-2989 Lift Bracket As 1

Start By:

a. Remove the valve cover.

Illustration 1 g01861123

1. Remove bolts (1).

2. Use Tooling (A) to remove rocker arm and shaft (2). Remove pushrods (3).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/2(W)

Installation Procedure
1. Install rocker arm and shaft (2) in the reverse order of removal.

a. Lubricate the contact points of pushrods (3) with clean engine oil. Install pushrods
(3).

b. Tighten bolts (1) to standard torque.

c. Adjust the electronic unit injectors. Refer to Testing and Adjusting, "Electronic Unit
Injector - Adjust".

d. Adjust the engine valve lash. Refer to Testing and Adjusting, "Engine Valve Lash -
Inspect/Adjust".

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:27:00 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 1/2(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i03552706

Rocker Arm - Disassemble


SMCS - 1123-015

Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-0510 Driver Gp 1

Start By:

a. Remove the rocker arm and shaft.

Illustration 1 g01262570

Note: Place an identification mark on all components for assembly purposes.

Note: Stand (5) has an offset hole.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/2(W)

1. Remove stands (1).

2. Remove rocker arms (2), rocker arms (3), rocker arms (4), and stand (5) from shaft (6).

3. Use Tooling (A) to remove the bushings from the rocker arms (3).

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:27:55 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 1/2(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i03552709

Rocker Arm - Assemble


SMCS - 1123-016

Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-0510 Driver Gp 1

1. Use Tooling (A) to install the bushings for rocker arms (3). For correct bearing dimensions,
refer to Specifications, "Electronic Unit Injector Rocker Arm" and Specifications, "Valve
Mechanism".

Illustration 1 g01262570

2. Install stand (5), rocker arms (4), rocker arms (3), and rocker arms (2) onto shaft (6).

Note: Stand (5) has an offset hole.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/2(W)

3. Install stands (1).

End By:

a. Install the rocker arm and shaft.

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:28:51 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 1/3(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i07071018

Cylinder Head - Remove and Install


SMCS - 1100-010

Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty

A - Loctite Graphite- 50 Anti-Seize -

Start By:

a. Remove the accessory drive.

b. Remove the intake manifold.

c. Remove the fumes disposal group.

d. Remove the electronic unit injectors.

e. Remove the exhaust gas valve (NRS).

f. Remove the exhaust cooler (NRS).

g. Remove the exhaust manifold.

Illustration 1 g01890955

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/3(W)

1. Disconnect tube assembly (1). Disconnect the tube and hose assemblies (2). Remove bolts (3) and bracket
(4).

Illustration 2 g01890956

2. Remove tube assembly (5). Disconnect hose assembly (8).

3. Remove bolts (6) and nut (9). Reposition harness assembly (7).

Illustration 3 g01890957

4. Remove housing (10) and tube (11).

Illustration 4 g01890958

5. Attach a suitable lifting device to cylinder head (14). The weight of cylinder head (14) is approximately
204 kg (450 lb).

6. Remove bolts (12) and (13). Remove cylinder head (14) and the cylinder head gasket.

Installation Procedure

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 3/3(W)

1. Inspect the cylinder head and the cylinder block for flatness. Refer to Guideline for Reusable Parts and
Salvage Operations, SEBF8162, "Procedure to Measure and Salvage Cylinder Head Assemblies and
Related Components".

2. Install cylinder head (14) in reverse order of removal.

a. Install a new head gasket.

b. Apply Tooling (A) to the threads of bolts (12), (13), and both sides of the washers.

c. Install bolts (12) and (13). Refer to Guideline for Reusable Parts and Salvage Operations,
SEBF8301, "Inspection and Reuse of Critical Fasteners Used in All Engines".

Illustration 5 g00950659

d. Tighten bolt (1) through bolt (26) in a numerical sequence to a torque of 170 ± 10 N·m
(125 ± 7 lb ft).

e. Tighten bolt (1) through bolt (26) again in a numerical sequence to a torque of 170 ± 10 N·m
(125 ± 7 lb ft).

f. Place a mark on bolt (1) through bolt (26). Rotate bolt (1) through bolt (26) in a numerical sequence
for an additional 120 ± 5 degrees (1/3 turn).

g. Loosen bolt (1) through bolt (26) until the washers are loose under the Bolt heads.

h. Tighten bolt (1) through bolt (26) in a numerical sequence to a torque of 170 ± 10 N·m
(125 ± 7 lb ft).

i. Tighten bolt (1) through bolt (26) again in a numerical sequence to a torque of 170 ± 10 N·m
(125 ± 7 lb ft).

j. Place a mark on bolt (1) through bolt (26). Rotate bolt (1) through bolt (26) in a numerical sequence
for an additional 120 ± 5 degrees (1/3 turn).

k. Tighten bolt (27) through bolt (34) in a numerical sequence to a torque of 55 ± 10 N·m (41 ± 7 lb ft).

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:29:47 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 1/2(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i03554743

Lifter Group - Remove and Install


SMCS - 1209-010

Removal Procedure
Start By:

a. Remove the cylinder head.

Illustration 1 g01138716

1. Remove bolts (1).

2. Remove lifter group (2).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/2(W)

Installation Procedure
1. Install lifter group (2) in reverse order of removal.

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:30:43 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 1/5(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i05331988

Camshaft - Remove and Install


SMCS - 1210-010

Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1U-7638 Magnetic Holding Tool 18
201-4211 Camshaft Pilot 1
B
201-4212 Camshaft Pilot 1

Start By:

a. Remove the rocker arms and shafts.

b. Remove the front cover.

c. Remove the camshaft position sensor.

1. Turn the crankshaft to top center compression stroke for the No. 1 piston. Install the timing
bolt in the flywheel.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/5(W)

Illustration 1 g01878122

2. Install Tooling (A) in order to support the lifter. Repeat for all the remaining lifters.

Illustration 2 g03377797

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 3/5(W)

3. Remove bolts (1). Remove bolt (2) and idler gear (3) for assembly purposes.

Illustration 3 g03377807

4. Remove tube assembly (6) and hose assembly (5). Remove cover (4).

Illustration 4 g01325027

5. Install Tooling (B) onto the camshaft.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 4/5(W)

Illustration 5 g03377808

Note: Lubricate Tooling (B) for easier removal of the camshaft. Lubrication also prevents
damaging the camshaft lobes and the camshaft bearings.

6. Use two people to remove camshaft (7). The weight of camshaft (7) and the camshaft gear
is approximately 34 kg (75 lb). Carefully remove camshaft (7) from the engine. Support the
weight of the camshaft during removal.

Note: Rotate the camshaft during removal. This action will prevent the camshaft from
binding in the camshaft bearings.

Installation Procedure

NOTICE

When installing the camshaft, make sure the number one cylinder is at
top center of the compression stroke with the timing bolt installed in
the flywheel. The camshaft timing is very important. The timing mark
on the camshaft drive gear must line up with the timing mark on the
idler gear. Refer to the Specifications Manual for more information.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 5/5(W)

Note: Ensure that camshaft (6) and Tooling (B) are clean. Apply clean engine oil to the lobes and
journals of camshaft (6) and Tooling (B).

Note: During installation of camshaft (6), rotate the camshaft in both directions in order to prevent
binding in the camshaft bearing bores.

1. Install camshaft (6) in the reverse order of removal.

Illustration 6 g01292427

a. Ensure that the timing Marks (X) on the idler gear aligned with the timing marks on
the crankshaft gear and the camshaft drive gear.

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:31:38 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 1/2(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i05351535

Camshaft Gear - Remove and Install


SMCS - 1210-010-GE

Removal Procedure
Start By:

A. Remove the camshaft.

1. Wrap the camshaft with a protective covering in order to prevent damage to the camshaft.

Illustration 1 g00522082

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/2(W)

NOTICE

Do not allow the camshaft to fall to the floor when pressing it from the
drive gear. Also make sure that the camshaft lobes do not catch on the
press plates.

2. Use a suitable press to remove drive gear (1) from camshaft (3) .

3. Remove woodruff key (2) .

Installation Procedure
1. Install drive gear (1) in the reverse order of removal.

a. Raise the temperature of drive gear (1) to a temperature of 315° C (600° F).

Copyright 1993 - 2020 Caterpillar Inc. Wed Jun 10 15:32:34 UTC+0800 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING

NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
w 1/4(W)

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE JR9
Configuration: C13 Industrial Engine JR900001-UP

Disassembly and Assembly


C13 Industrial Engine
Media Number -UENR6571-00 Publication Date -01/01/2015 Date Updated -13/01/2015

i05332615

Camshaft Bearings - Remove and Install


SMCS - 1211-010

Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
201-4214 Receiving Sleeve 1
201-4213 Puller Plate 1
201-4209 Bearing Pilot 1
201-4208 Backup Plate 1
A
6F-7032 Bolt 1
8M-8778 Taperlock Stud 1
8S-8292 Extension (Short) 2
8S-8293 Extension (Long) 1
B 185-3989 Thread Lubricant 1

Start By:

a. Remove the lifter group.

b. Remove the camshaft.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 2/4(W)

Illustration 1 g01016694

1. Install Tooling (A). Apply Tooling (B) on the threads.

2. Remove camshaft bearings (1).

Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
201-4214 Receiving Sleeve 1
201-4213 Puller Plate 1
201-4209 Bearing Pilot 1
201-4208 Backup Plate 1
A
6F-7032 Bolt 1
8M-8778 Taperlock Stud 1
8S-8292 Extension (Short) 2
8S-8293 Extension (Long) 1

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10
w 3/4(W)

Illustration 2 g01133376

1. Position new camshaft bearing (1) in Tooling (A) and install the bearing from the rear to the
front of the engine.

Illustration 3 g01133395

2. The camshaft bearings are installed with Tooling (A). Measure the depth of the camshaft
bearings from the front face of the cylinder block to the following distances:

a. Dimension (A) is 36.50 mm (1.437 inch).

b. Dimension (B) is 192.50 mm (7.579 inch).

c. Dimension (C) is 348.50 mm (13.720 inch).

d. Dimension (D) is 504.50 mm (19.862 inch).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/10

You might also like