PAC Trainee Log Book DEC 2017
PAC Trainee Log Book DEC 2017
ARCHITECTS
COUNCIL
Pre-registration Number
1. GENERAL NOTES
5. PROJECT DETAILS
6. WORK STAGES
7. CURRICULUM VITAE
GENERAL NOTES
1. The Trainee Architect (TA) shall conduct a professional training at any of the
approved Placement Provider (PP) as provided by the PAC Council.
3. The work placement shall be supervised by a Training Mentor (TM), who must be
a Professional Architect with at least 10 yr post-registration experience(PA).
4. The TA may also conduct a work placement under the direct supervision of a
freelance PA.
6. The TA may work for 24 consecutive months in the same firm /under the
supervision of the same PA. However, the TA is allowed to conduct his/her
training in different firms or under the direct supervision of different PAs. In such
case, the minimum duration of the training period shall be of 6 consecutive
months or 2 semesters (SR) which shall consist of a minimum of 120 working days
or 900 working hours.
7. During one SR, the TA should perform at least 350 hours of active participatory
work and the rest as observer.
8. The TA must be involved at 80% as participant and 20% as observer on the overall
work placement(s).
9. Prior to starting the training, the TM must provide an indicative list of projects
and tasks that shall be entrusted to the TA.
10. The PP/TM must ensure that the TA works on different types of projects with
varying complexity and on various work stages as per annex. The TA must work
on at least 1 project of each class.
The Trainee Architect must demonstrate to have acquired adequate experience and knowledge
both as participant and observer at all work stages.
PREPARATION
A Appraisal
- Identification of client’s needs and objectives, business case and possible
constraints on development.
B Design Brief
- Development of initial statement of requirements into the Design Brief by or
on behalf of the client confirming key requirements and constraints.
Identification of procurement method, procedures, organizational structure
and range of consultants and others to be engaged for the project.
DESIGN
C Concept
- Implementation of Design Brief and preparation of additional data.
- Preparation of Concept Design including outline proposals for structural and
building services systems, outline specifications and preliminary cost plan.
D Design Development
- Development of concept design to include structural and building services
systems, updated outline specifications and cost plan.
- Completion of Project Brief.
E Technical Design
- Preparation of technical design(s) and specifications, sufficient to co-ordinate
components and elements of the project and information for statutory
standards and construction safety
PRE-CONSTRUCTION
G Production Information
- Preparation of production information in sufficient detail to enable a tender
or tenders to be obtained.
- Preparation of further information for construction required under the
building contract.
H Tender Documentation
- Preparation and/or collation of tender documentation in sufficient detail to
enable a tender or tenders to be obtained for the project.
I Tender Action
- Identification and evaluation of potential contractors and/or specialists for
the project.
- Obtaining and appraising tenders; submission of recommendations to the
client.
CONSTRUCTION
J Mobilisation
- Project Planning.
- Letting the building contract, appointing the contractor.
- Issuing of information to the contractor.
- Arranging site hand over to the contractor.
USE
CLOSING OF PROJECT
Semester Period
Placement Provider
Trainee Architect
Address
Fax
Email
Ad
PROJECT DETAILS Use a separate sheet for each project.
Project Name
PARTICIPANT : Hours
OBSERVER : Hours
Personal Commentary
I declare that I have worked in the above office for the said Training Period and that the project details
given and my involvement in the respective projects are true.
Project Name
Client
Project Brief
Nature / Category
Services Provided
Consultant (s)
Contractor
Current Stage
Additional Info
Task Description
WORK STAGES – OBSERVER / PARTICIPANT
A. Appraisal
B. Design Brief
C. Concept
D. Design Development
E. Technical Design
G. Production information
H. Tender Documentation
I. Tender Action
J. Mobilisation
TOTAL HOURS
TRAINING MENTOR SHEET 1
Sheet to be filled by Training Mentor (TM) at start of training semester and submitted to PAC.
INCEPTION
DESIGN BRIEF
CONCEPT
DESIGN DEVELOPMENT
TECHNICAL DESIGN
STATUTORY APPROVALS
PRODUCTION INFORMATION
TENDER DOCUMENTATION
TENDER ACTION
MOBILISATION
CONSTRUCTION
Hereunder is a tentative list of projects the Trainee Architect will be involved in:
1.
2.
3.
4.
5.
Sheet to be filled by Training Mentor (TM) at completion of training semester and submitted to PAC.
INCEPTION
DESIGN BRIEF
CONCEPT
DESIGN DEVELOPMENT
TECHNICAL DESIGN
STATUTORY APPROVALS
PRODUCTION INFORMATION
TENDER DOCUMENTATION
TENDER ACTION
MOBILISATION
CONSTRUCTION
Project 1
Project 2
Project 3
Project 4
Project 5
The Trainee Architect must submit relevant information (drawings, cost control, planning site meeting MoM,
procurement documents, etc…) to support his/ her involvement and acquire experience in the different work
stages.
- Appraisal
- Design Brief
- Concept
- Design Development
- Technical Design (Detailing)
- Application for statutory approvals
- Production Information
- Tender Documentation
- Tender Action
- Mobilisation
- Construction to Taking Over
- Post Taking Over
- Post-Performance Certificate
CURRICULUM VITAE
School of Architecture
Trainee Architect
Address
Telephone
Address
Fax
Address
Email
Address