0% found this document useful (0 votes)
5 views1 page

Rate P

df chps

Uploaded by

muhammad75make
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views1 page

Rate P

df chps

Uploaded by

muhammad75make
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Rate Analysis for 100 Sft

chips Work in 1/2" thick smooth finished plaster in 1:3 cement Unit Rate (Amarican System) per 100 Sft
and Qty Rate Per Unit Amount (Rs.)
MATERIAL

Cement 2.03 1,550 Rs. 3149.60


2 Crush/Terazo 2.54 cft 138 Rs. 350.52
3 Pudlo pwd 4.00 pack 250 Rs. 1000.00
8 Material Wastage 5% Rs. 225.01
A Total 4725.13
LABOUR
1 Mason 1.00 No 2,400.00 per day 2400.00
2 Cooly un-skilled 1.00 Nos. 1,500.00 per day 1500.00
3 Bahisthi 0.50 No. 1,500.00 per day 750.00
Total 4650.00
Add Sundries 5% 232.50
Total 4882.50
Total A+B 9607.63
Add Health Safity and envoirment 0% 9607.63
Add Contractor's Profit & Overheads 15% % 11048.77
With Holding Tax 0% 11048.77
Total Amount 11048.77
ITEM RATES
Rate per 100 Sft Rs. 11,048.77 Say 11048.75
Rate per Sft Rs. 110.49 Say 110.50