2023 Infrastructure Investment Programme

Zimbabwe Infrastructure Investment Programme 2023

Uploaded by

Kristi Duran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

2023 Infrastructure Investment Programme

Zimbabwe Infrastructure Investment Programme 2023

Uploaded by

Kristi Duran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 158

ZIMBABWE

2023 ZIMBABWE INFRASTRUCTURE


INVESTMENT PROGRAMME

Accelerating Economic Transformation

DISTRIBUTED BY VERITAS
e-mail: [email protected]; website: www.veritaszim.net
Veritas makes every effort to ensure the provision of reliable information,
but cannot take legal responsibility for information supplied.
Contents
INTRODUCTION ...............................................................................................9
2022 Infrastructure Investment Summit........................................... 11
PROGRESS ON 2022 INFRASTRUCTURE DELIVERY.................................14
2023 INFRASTRUCTURE INVESTMENT PLAN............................................17
Value For Money and Public Sector Investment Programme........ 18
2023 Infrastructure Funding Mix.......................................................19
DIGITAL ECONOMY........................................................................................20
Digital Infrastructure..........................................................................22
E-Government.....................................................................................23
Mining Cadastral System...................................................................25
Digital Entrepreneurship....................................................................26
Zim-Digital Migration Project.............................................................26
Integrated Electronic Case Management System ..........................27
Development Projects Management Information Systems............ 28
ENERGY..........................................................................................................28
Independent Power Producers .........................................................31
Rural Electrification Programme......................................................31
TRANSPORT...................................................................................................33
Roads ..................................................................................................34
Beitbridge–Masvingo–Harare Road.....................................................36
Mbudzi Traffic Interchange...................................................................37
Bridges and Other Roads.....................................................................39
Rural Feeder Roads.............................................................................40
Emergency Roads Rehabilitation Programme II.................................. 41
Aviation...............................................................................................47
Rail ......................................................................................................48
Border Posts.......................................................................................49
WATER AND SANITATION..............................................................................54
Dam Construction.............................................................................. 55
Borehole Drilling................................................................................. 60

3
Rural WASH......................................................................................... 61
Rural Development Programme........................................................61
Water Supply Schemes for Small Towns and Growth Points........ 62
HEALTH AND WELL-BEING...........................................................................64
Central and Quinary Hospitals..........................................................68
Provincial Hospitals...........................................................................69
District Hospitals and Mission Hospitals.........................................70
Primary Health Care...........................................................................71
Ambulances & Medical Equipment...................................................71
HUMAN CAPITAL DEVEPOPMENT AND WELL-BEING...............................72
Basic Education..................................................................................72
Tertiary Education..............................................................................73
High Performance Computing Center Phase II................................ 79
Modernisation of Public Service Academy Institutions..................80
HOUSING DELIVERY......................................................................................81
Residential Accommodation.............................................................82
Institutional Housing .........................................................................85
Civil Service Housing Fund...............................................................91
FOOD AND NUTRITION .................................................................................92
Irrigation Development......................................................................92
Animal Disease Prevention and Control..........................................98
CLIMATE CHANGE MAINSTREAMING.........................................................99
DISASTER RISK MANAGEMENT.................................................................102
DEVOLUTION................................................................................................103
YOUTH AND WOMEN EMPOWERMENT..................................................... 116
Women Empowerment..................................................................... 116
Youth Empowerment........................................................................ 119
PUBLIC INVESTMENT MANAGEMENT....................................................... 119
Project Preparation Development Fund.........................................121
ANNEXURES.................................................................................................123

4
FOREWORD

To become an Upper Middle-Income Society


by 2030, the country must deliver infrastructure
projects and services that support structural
transformation of the economy, drive productivity
growth, jobs creation and improvements in the
welfare of citizens over the long-term.

Scaling up infrastructure investment and delivery


from both the public and private sectors is one of
the pathways to unlocking sustainable economic
growth and development and provides the resilience necessary for the country
to respond to adverse exogenous shocks. Enabling infrastructure services also
allows the country to take advantage of opportunities that exist on the global
stage.

In addition to policy reforms meant to create the right conditions for private
sector participation in public infrastructure provision, Treasury will deepen policy
reforms as part of the fiscal consolidation measures towards Public Investment
Management that addresses current bottlenecks in the infrastructure sector.

Such reforms will include the development of a strong conceptual framework for
mainstreaming climate change into the different phases of infrastructure projects,
addressing weaknesses in procurement processes, contract management,
value for money and other project delivery challenges.

Additionally, provision of infrastructure services in this era of globalisation should


be considered from a holistic point of view. As a nation, there is need to consider
not only investment in-country but also encompass cross-border infrastructure.
This can be accelerated through identifying appropriate modalities and options
for strengthening the role of regional cooperation in all areas of infrastructure
development.

5
Whilst investments in new capacity remains critical in order to meet increasing
demand for services, maintaining current assets will also ensure public
infrastructure assets are more durable, economical and sustainable over time.
I therefore commend the 2023 Infrastructure Investment Programme to public
entities, private sector, civil society and cooperating partners as well as other
stakeholders as it provides a clear link between the NDS1 goals and objectives
and the Budget.

Hon. Prof. M. Ncube


Minister of Finance and Economic Development

November 2022

6
PREFACE

The world we live in today is fundamentally


changing with new, complex and interacting
sources of uncertainty for every country that
requires difficult policy choices at every turn. The
economic transformation we seek to pursue is
an opportunity to shape the country in a way that
benefits those living today as well as those who will
follow.

The nascent economic recovery currently underway requires sustenance through


increased better investment spending and efficient management of infrastructure
assets as key enablers to sustainable economic growth, creation of decent jobs
and income as well as reduction of inequalities within communities.

The efficiency and effectiveness of public spending, therefore also supports


macroeconomic stability, increases Budget flexibility and fiscal space to respond
to any exigencies whilst also allowing for more resources to be channelled
towards developmental programmes and projects.

As part of the fiscal consolidation measures, Government has taken a deliberate


policy to ensure every dollar of public spending is as effective as can be, including
those from infrastructure outlays, in order to help in curbing price and exchange
rate volatility.

Noting that public procurement constitutes a large share of the economy, how
and where Government procures goods and services impacts the behaviour of
economic agents and promotes responsible business practices.

In this regard, enforcing the value for money principle on all transactions will
result in Government getting fair value prices for all goods and services procured.

7
Government will, therefore, monitor every step of the project life cycle, from
appraisal, prioritisation and selection, financing, procurement, construction as
well as operations and maintenance, to ensure that due process is followed and
costs are justifiable and sustainable and where necessary, remedial action will
be taken.

Accordingly, the 2023 Infrastructure Investment Programme will prioritise


implementation of ongoing projects and programmes targeting those nearing
completion to ensure citizens benefit from services coming from these
investments.

G. T. Guvamatanga
SECRETARY FOR FINANCE AND ECONOMIC DEVELOPMENT

November 2022

8
INTRODUCTION

1. Infrastructure facilitates trade, powers businesses, connects workers to

their jobs, creates opportunities for struggling communities and protects

the nation from an increasingly unpredictable natural environment.

2. Well planned and well implemented infrastructure investments contribute

towards improved provision of public services, which in turn, support

sustainable economic growth and development, help countries respond

effectively to emergency social needs of citizens and build resilience

against climate change and natural disasters.

3. For the economy to integrate with other economies both regional and
international, appropriate infrastructure in the form of roads, aviation,
railways, information and technology and power, as well as their efficient

operation, is required.

4. The infrastructure needs of the country, whose funding requirement


is estimated at well over US$3 billion annually, far exceeds resources
that can be mobilised in a fiscally sustainable way, whether from
borrowings, taxes and private sector through Public Private Partnership
Arrangements. Therefore, to bridge the funding gap, focus should also

be on spending better, all available funding opportunities.

5. The country has experienced incidences of poorly designed projects,

with large cost overruns and long delays in construction. Even as the

9
projects are completed, they have low returns to communities after

completion, as related downstream investments would not have been

undertaken due to poor coordination among stakeholders.

6. Other projects have been mired in high-profile corruption scandals and

stalled due to a high degree of information asymmetry that makes it

harder to detect inefficiencies that emanate through inflated prices, poor


workmanship and quality of the delivered asset.

7. A key priority during 2023 should, therefore, be on instituting measures

that address losses and waste in public infrastructure spending through

among other things:

• Enforcement of best practices in costing of projects, procurement

and contract management;

• Provision of guidelines on contract pricing as well as input costs, to

ensure costs are reflective of market fundamentals;

• Crowding in of private sector funding through Public Private

Partnerships, which brings with it, private sector innovation and

efficiency in public infrastructure service provision;

• Design and implementation of climate proofing and resilient

infrastructure in order to respond to climate change impacts;

• Improvements in infrastructure governance system that addresses

performance of public institutions providing infrastructure services;

10
• Implementation of cost reflective but economically sustainable tariffs;

• The existence of a bankable project pipeline that attract investors in

our key sectors of the economy;

• Improvement in project management and coordination among all the

relevant project stakeholders;

• Ensuring transparency in project procurement processes that should

incorporate value for money principles; and

• Capacity building measures including allowing for outsourcing of

critical skills that might not be residing within Government.

2022 Infrastructure Investment Summit

8. The inaugural Infrastructure Summit that was held in Victoria Falls during

the period 8–9 September, 2022, brought together stakeholders in the

sector from Government, private sector, development partners and the

construction industry.

9. Organised by the National Economic Consultative Forum (NECF) and


running under the theme; “Harnessing the Potential of Public Private
Partnerships (PPPs) to Resolve Infrastructure Challenges in
Zimbabwe”, the Summit sought to find ways of addressing challenges

affecting infrastructure development in Zimbabwe.

10. During deliberations, a stable macro-economic environment, presence

of bankable projects and affordable, long-term financing were identified

11
as critical in crowding in additional private sector funding to address the

huge infrastructure gap in the country.

11. The following were some of the recommendations from the Summit:-

• Need to invest in feasibility studies and other project development

activities to ensure a pipeline of bankable projects ready for the

market. Noting the under-utilisation of the Project Preparation

Development Fund, established for the purpose, stakeholders

implored Government to review its operational framework with a view

to ensuring resources are accessible to implementing agencies;

• Sectors should fully develop PPP frameworks, such as the


Government Implementation Agreement for solar projects, which
take into account private sector concerns whilst also addressing

weaknesses in the public sector;

• Need to develop the institutional, technical, and regulatory capacities


of the public sector to plan, finance, implement, operate and manage

public infrastructure assets;

• ZIDA should be capacitated to enable it to take its central role in


linking public sector projects and investors, including establishing a

central repository of infrastructural projects ready for the market;

• Prioritise repairs and maintenance of current infrastructure assets


over new projects in order to reduce costly rehabilitation programmes
as well as ensure such assets continue to provide reliable services;
and

12
• The need for cost reflective tariffs and measures to close revenue

leakages that undermine cash generation capacities of public entities

involved in infrastructure provision.

12. The 2023 National Infrastructure Investment Programme responses

to these stakeholder concerns and input, by providing a framework

for improving the public investment environment in the country whilst

also creating the conditions necessary for private sector participation in

infrastructure development.

13. The infrastructure architecture will be improved with each project being

considered from a full life cycle perspective, including rules related to

budgeting for infrastructure maintenance.

14. A framework will be developed and implemented for infrastructure asset

management. In this regard, measures will be taken to ensure public

entities charged with maintenance of public infrastructure assets improve

their governance systems, including improving their revenue collection

systems, retention of critical staff and build capacity to maintain such

assets.

15. Furthermore, the Project Preparation Development Fund will be

strengthened in coordination with the Zimbabwe Investment and

Development Agency (ZIDA), and the Infrastructure Development Bank

of Zimbabwe (IDBZ) to deliver a robust pipeline of projects.

13
16. Enforcement of best practices in costing and contract management of

projects will be implemented and strategies adopted to optimise value

for money from every infrastructure outlay.

17. Benefiting from the commissioning of the Beitbridge Redevelopment

Project Phase I, public-private partnerships will be embraced in cases

where they deliver better value for money in order to crowd in additional
funding for projects.

PROGRESS ON 2022 INFRASTRUCTURE DELIVERY

18. Out of the 2022 Revised Capital Budget of ZWL$507.3 billion which

includes ZWL$52.5 billion for devolution, ZWL$295.4 billion is meant for

infrastructure development. Outlays towards infrastructure for the period

to September are as follows:

• Fiscal resources, ZWL$157.8 billion;

• Development Partners support, US$15.9 million;

• Loans, US$142.9 million;

• Statutory funds, ZWL$57.9 billion.

14
19. The table below provides a summary of the deployment of the resources

to the various sectors.

Development Expenditures by Sector (as at 30 September 2022)


SECTOR FISCAL (ZWL$) STATUTORY ZWL$ LOANS (US$) GRANTS (US$)
Energy 788,000,000 142,498,833 6,739,713

Transport 60,210,419,916 56,307,000,000 27,779,159 11,000,000

ICT 10,873,606,771 — 4,546,997

Housing and Social


14,327,783,297
Amenities
Health 2,116,134,236 808,000,000

Primary & Secondary


47,482,742 1,102,907
Education

Higher Education 5,514,549,413

Water and Sanitation 36,354,967,880 2,778,787

Agriculture 11,889,436,303 1,962,168 15,930,551

Devolution 16,491,454,625

TOTAL 157,825,835,183 57,903,000,000 142,498,833 15,930,551

20. These investments have ensured progress on targeted projects,

transforming livelihoods of communities and the doing business

environment. In particular, we have seen notable progress on the following

flagship and high impactful projects under NDS1 among others:-

• The upgrading and modernisation of the Beitbridge Border Post

under a 17-year Build, Operate and Transfer (BOT) arrangement

between the Government and Zim Borders Consortium, with Phase

I having being commissioned on 31 August, 2022;

• Construction of the New Parliament Building in Mt Hampden through

a grant from the People’s Republic of China;

15
• Harare-Masvingo-Beitbridge Road Upgrading project that has seen

353km being opened to traffic as at 23 October 2022;

• 600MW Hwange 7 and 8 Power Plant Expansion Project, with Unit 7

expected to come on stream before year end and Unit 8 during the

first quarter of 2023;

• Upgrading of the Robert Gabriel Mugabe International Airport, with

the runways and taxiways rehabilitation having been completed,

international terminal building and expansion as well as airfield

ground lighting still work in progress with works expected to be

complete during the first half of 2023;

• Construction of Gwayi Shangani dam in Matabeleland North, now at

69% with the entire dam project now targeted for completion during

the year 2023;

• Development of 50 irrigation schemes covering 6 865ha through

the Turnkey and the National Accelerated Irrigation Development

Programme;

• Completion of Bindura University of Science Education female halls

of residence;

• Construction of Manyame Hospital in Harare;

• Construction of residential flats in Dzivarasekwa, Marondera and

Senga (Gweru); and

• Implementation of the Zimbabwe Digital Migration Project.

16
21. Notable developments have also been realised on the construction and

upgrading of several roads, dams and irrigation infrastructure, education

and health facilities as well as energy and Information Communication

Technology roll out programmes among other key interventions.

22. Several community projects, being undertaken through the Inter-

Governmental Fiscal Transfers allocation were also completed, with


others at various stages of construction.

2023 INFRASTRUCTURE INVESTMENT PLAN

23. Accomplishment of the National Development Strategy (NDS1)

performance targets largely depend on how Ministries Departments

and Agencies efficiently and effectively implement planned projects and

programmes that ensures delivery of desired outputs and outcomes.

24. Resource outlays under the 2023 National Infrastructure Investment Plan
will prioritise on-going and stalled projects over new projects in order
to ensure sustainability of our interventions under the difficult global
and domestic financial conditions. Priority will also be accorded to the

rehabilitation and maintenance of existing infrastructure.

25. Costs for projects and allocations thereof during 2023 will be based
on consideration of technical engineering designs, prevailing market

rates/prices, and where possible, benchmarked against regional and

international standards, including alignment to similar projects.

17
26. Due consideration has also been aligned to the technical capacity of

institutions involved in project delivery, particularly their ability to plan

and coordinate execution of projects as some public entities continue to

register low budget execution rates.

27. During implementation of the 2023 National Budget, development of

Gantt charts, sequencing and timing of project implementation activities


will facilitate development of a predictable resource disbursement plan

that should enable project managers to plan and execute the projects.

28. Furthermore, respective implementing agencies will be expected to

develop a robust monitoring and evaluation plan for each of the targeted

projects under their purview that allows for multi stakeholder dialogue and

resolution to challenges affecting the country’s infrastructure delivery.

Value For Money and Public Sector Investment Programme

29. Government is concerned with malpractices in costing of projects and

programmes which in some instances have been marred with future


pricing and exorbitant pricing aimed at profiteering which has negatively

affected the macroeconomic fundamentals.

30. Most contracts have been based on tender prices as compared to

deriving contracts from quantified volumes and prices. In this regard,

Government on the 4th of August, 2022, requested all Government

Ministries, Departments and Agencies to undergo a revalidation exercise

18
on costings of projects, programmes including equipment procurement

with the objective to ensure value for money in all public procurement.

31. The thrust by Government is clear that all fiscal outlays on projects

and programmes must, of necessity, add value to communities and

thus, contribute to the overall economic growth and development of the

country.

32. In this regard, Government will monitor every step of the project life

cycle for all major infrastructure projects, to ensure that due process is

followed, and where necessary, remedial action is taken.

33. Institutions undertaking projects and managing infrastructure assets will

be required to strengthen their operations and maintenance programmes.

34. In order to achieve the set targets and ensure that citizens benefit

from investments made, implementing agencies should concurrently


develop monitoring and evaluation frameworks for their targeted projects

including integrating the monitoring and evaluation issues before project


execution.

2023 Infrastructure Funding Mix

35. The Overall support towards the 2023 Development Budget including

Intergovernmental Fiscal Transfers amounts to ZWL$1.1 trillion, with

funding being mobilised through the respective funding mix as follows:

19
• Tax revenues ZW$490.8 billion;

• Loan financing ZWL$497.8 billion;

• Development Partners support ZWL$19.8 billion;

• Statutory funds ZW$134.4 billion.

36. The table below shows the distribution of the infrastructure outlay

under the various sectors.

FISCAL STATUTORY LOANS GRANTS TOTAL


SECTOR
(ZWL$) (ZWL$) (ZWL$) (ZWL$) (ZWL$)
Energy 6,000,000,000 40,699,000,000 440,007,320,000 5,224,675,000 491,930,995,000

Transport 101,074,433,000 93,744,000,000 194,818,433,000

ICT 11,712,198,000 45,012,052,000 56,724,250,000

Housing and
49,931,976,050 49,931,976,050
Social Amenities

Health 37,275,564,000 37,275,564,000

Primary and
Secondary 4,180,000,000 4,180,000,000
Education

Higher Education 15,210,000,000 15,210,000,000

Water and
30,365,402,000 30,365,402,000
Sanitation

Agriculture 36,547,975,000 12,790,950,000 14,608,094,000 63,947,019,000

Devolution 195,503,620,000 195,503,620,000

Other 3,000,000,000 3,000,000,000

TOTAL 490,801,168,050 134,443,000,000 497,810,322,000 19,832,769,000 1,142,887,259,050

DIGITAL ECONOMY

37. The ICT sector is the bedrock in the establishment of a digital economy,

and central to the overall transformation of the economy with potential to

generate new employment opportunities, improved business efficiencies,

and access to information and knowledge services.

20
38. In our context, paramount is the need to bridge the digital gap between

the rural communities and the urban communities, necessitating the need

for increased access through the establishment of more base stations,

optic fibre broadband expansion and other supportive ICT infrastructure

to support programs such as smart city, smart learning, smart health,

smart agriculture and smart social protection.

39. Government has, during the course of the year, achieved the following

milestones under the sector:

• Established 75 ICT Labs under the E-learning Strategy;

• Connected 649 Schools to the Internet;

• Maintenance and rollout of national systems such as Public Finance

Management System (PFMS), Human Resources Management

Information System (HRMIS), e-Government flagships and various

Online Service Systems;

• Operationalised 63 PFMS Kiosks;

• Capacitated 1,680 Civil Servants and Citizens in ICT’s;

• Provided connectivity to 9 Public Service Commission Training

Centres;

• Established 11 Community Information Centres.

40. To fully benefit from the rapid growth in ICTs and unlock the digital

transformation of the economy, strategic investments in enabling

21
infrastructure, digital skills, financial services and entrepreneurship will

need to be upscaled.

41. The overall support towards the ICT sector of ZWL$56.7 billion during

2023 is meant to improve ongoing initiatives in the sector, with ZWL$1.3

billion having been set aside for various e-Government programmes and

ZWL$45 billion for backbone infrastructure implemented by Telone.

Digital Infrastructure

42. Despite the multiple benefits of connectivity to communities, fibre

backbone only connects major cities and urban areas, with the rural

areas still to be connected. Furthermore, the last-mile fixed infrastructure

deployments to end-user premises is limited, forcing users to depend on

costly mobile and user networks to access the internet.

43. To address the limited use of broadband services in the absence of

infrastructure, Government introduced infrastructure sharing as a strategy


to open access and limit duplication of infrastructure and redirecting
resources to under-served communities.

44. Through the Universal Services Fund (USF), POTRAZ has channelled

resources towards network expansion in underserved areas, by

targeting presence of mobile networks to more rural areas, deployment

of a microwave radio backhaul network, telemedicine, smart agriculture,

internet connectivity for schools, e-learning, and the building of

22
Community Information Centres. These interventions are consistent with

Government’s thrust of leaving no-one and no place behind.

45. Mobile operators remain the main providers of broadband connections,

with an estimated combined population coverage of 93.4 percent for 2G

mobile networks, 83.9 percent for 3G networks, and 34.9 percent for

Long Term Evolution (LTE) networks, according to POTRAZ.

46. Attracting further investments in the sector would require the

implementation of a cost reflective and affordable tariff, competitive

market environment and policy measures to drive demand for broadband

services.

E-Government

47. Government digital platforms, such as the PFMS, the HRMIS, and the

payroll and pensions systems, facilitate uptake of technologies and the

digital economy, help drive public sector operational efficiencies, reduce

opportunities for fraud and corruption as well as increase accountability.

48. Most MDAs have established their own digital platforms, operating largely

in isolation from each other, resulting in fragmentation and fractured

landscape of digital systems and services whilst making interoperability

and data sharing between systems difficult.

23
49. Through the e-Government Standards Development Technical Working

Group, Government is establishing a framework to standardise the

development and operation of ICT systems within the public service,

including strengthening coordination and inter-operability for data sharing

among the various MDAs, and optimise on the available technical skills

across government.

50. To sustain current public sector systems development and improvements,

fiscal outlays towards e-Government interventions during 2023 amount

to ZWL$1.3 billion as shown in the table below.

2023 e-Government Fiscal Interventions


Project Name Implementing Targeted works Budget
Entity Provision
(ZWL$)
Smart Health Min of ICT Deployment of Telemedicine system, 312,000,000
warehouse inventory system and e-HR
system
Smart Government Min of ICT Development of online import and export 212,000,000
licensing system for Ministry of Industry
and Commerce, labour and social welfare
online services and the development of a
system for the Ministry of Defence and War
Veterans affairs
Smart Government Min of ICT Procurement of VoIP equipment and 312,000,000
Communication extension to 10 MDAs
Suite
Smart Agriculture Min of ICT Development of Agriculture Information 360,000,000
Management System (AIMS) and Land
Information Management System (LIMS).
Smart City Min of ICT Computerisation of processes within the 112,000,000
Ministry of Transport and Infrastructural
Development
Community Min of ICT Installation of LAN and deployment of 175,000,000
Information Centres computers and printers to 5 information
centres

24
Project Name Implementing Targeted works Budget
Entity Provision
(ZWL$)
PFMS Kiosk Min of ICT Provision of access to government Public 175,000,000
Finance System to remote users who don’t
have access to the system
Last Mile Min of ICT Provision of connectivity to the PFMS 290,000,000
Connectivity platform remote users

Mining Cadastral System

51. A computer-based cadastre mining system adopted by Government

provides instant and up to date information on mining claims status

including ownership of mining claims. This initiative is expected to

provide impetus to the realisation of the US$12 billion mining industry by

the year 2023.

52. The system has since been successfully rolled out in Manicaland
Province and is expected to be fully operational in other provinces during

2023. Once complete, the system will bring transparency in licensing of

claims and improve management of mining titles, critical for attracting

investment in the sector.

53. Accordingly, in support of the aforesaid programme, an amount of

ZWL$1.6 billion has been set aside under the 2023 National Budget for

that purpose.

25
Digital Entrepreneurship

54. The country has potential for the development of digital entrepreneurship,

given its well-educated population, presence of private sector actors and

improvements in the regulatory environment.

55. This will be complemented by establishment of dialogue between the

public and private sector on how entrepreneurship can be accelerated.

Zim-Digital Migration Project

56. The nation embarked on a journey to migrate the broadcasting sector


from the analogue to digital transmission in line with the international
best practice. Progress to date stands at 43% with 18 transmitter sites

out of a target of 48 having been established.

57. In the region, Zimbabwe is among the countries which are yet to fully
digitalise the broadcasting services. As a way of deriving benefits from
the initial investment, in 2022, 50 000 set top boxes were purchased,
now awaiting pre-shipment inspection with US$504,000 being disbursed
towards high end upgrade, which is expected to enable households to
enjoy the new digital broadcasting services This may be mitigated by
smart TVs that now come with “in-built capacity” to receive digital signals.
This should be the way forward.

58. To ensure that the society continue to reap the benefits from the project

investments, ZWL$1.5 billion has been provided for in the 2023 National

26
Budget targeting the construction of base stations, installation of radio

and TV transmitters, procurement of High-End upgrade and capacitation

of ZBC through upgrading of the broadcasting studios.

Integrated Electronic Case Management System

59. Government is currently implementing the Integrated Electronic Case

Management system targeting the digitalisation of all courts in line with

new technologies and the need to ensure efficiency in the delivery of

justice with consistency and collective effort by all justice delivery players.

60. Key to note is that, once fully embraced and operationalised, the system

will bring in a justice serving mechanism that is transparent, efficient,

affordable whilst protecting the interests of witnesses, reducing the

backlog of pending cases, and most importantly reducing the number of

corrupt activities.

61. Phase 1 of the project has been completed and commissioned by His

Excellency, President E. D. Mnangagwa covering the Constitutional


Court, Supreme Court, High Court and Commercial Court.

62. In order to support ongoing works under phase 2 of the programme

targeting Labour Court, Administration Court, Sheriff of the High Court

as well as Magistrates Court, resources amounting to ZWL$500 million

are being set aside for this purpose.

27
Development Projects Management Information Systems

63. Government is in the process of establishing the Development Projects


Management Information Systems (DevProMIS), which is a web-based
system with three (3) modules namely, the Development Assistance
Database, Public Investment Management Suite and Monitoring and
Evaluation Module.

64. The System is intended to improve the management of development


assistance, enhance comprehensive monitoring and evaluation of
all development projects, as well as, provide a database of all public
investment projects.

65. To date system installation and user acceptance training have since
been completed whilst the entire system is expected to be operational in

the first quarter of 2023.

ENERGY

66. The sector is key to sustainable economic growth and development and
hence the need to promote the management of both renewable and now

renewable energy sources.

67. Electricity generation has however, faced a number of challenges over


the years, including obsolete generation equipment and infrastructure,

inadequate financing, and other structural bottlenecks, exerting pressure

on the supply side that has manifested through load shedding.

28
68. In this regard, our strategic objective under the sector remains centered

on a cost reflective tariff critical for ensuring a reliable and adequate

power supply.

69. Investments towards plant optimization at Hwange Thermal Power

Station as well as increased generation at Kariba Power Station has seen

local electricity generation output increase to 7 038.52 GWh during the


period January to September 2022, up from the 6 229.20 GWh recorded

during the same period last year.

70. Kariba Power Station contributed 67.24%, Hwange Power Station added

26.94% whilst the Small Thermals only contributed 1.40% to the total

energy production. The Independent Power Producers contributed

4.41% to local electricity generation.

71. The table below indicates electricity generation for the country.
Installed Capacity
Plant Actual Generation (GWh) 2023 Target (GWh)
(MW)
Hwange 920 1,896 9,108

Kariba 1,050 4,733 10,199

Munyati 120 50 140

Harare 120 34 84

Bulawayo 135 15 84

IPPs 99 311 437

Total 2,444 7,039 20,051

72. To this end, Government will embrace bold strategies to ensure

investments in power generation, transmission and distribution

29
infrastructure at the same time increasing private sector participation

with the view of promoting Independent Power Producers.

73. Progress on the Hwange 7 and 8 Expansion Project is proceeding


smoothly and is on course for Unit 7 to be completed by year end and
provide an additional 300MW to the grid. Unit 8 is also expected to come
onstream during the first quarter of 2023 and will add another 300MW to
the national grid.

Installed steam turbine and generator for unit 7    Cooling tower for units 7 & 8

74. The overall progress of the project as at end of September 2022 stood at
94.57% with Commissioning and Synchronising works remaining.

75. The above progress notwithstanding, additional electricity generation


output is required that addresses the energy shortfall and ensures energy
security for the economy.

76. During 2023, an amount of US$472 million will be injected on the project

from the China Exim Bank loan facility to support ongoing works, with an

30
additional ZWL$20.1 billion being mobilised by the parastatal for local
works whilst ZWL$3 billion will be channeled from the fiscus towards

meeting counterpart financing for the project.

77. The above progress notwithstanding, additional electricity generation


output is required that addresses the energy shortfall and ensure energy

security for the economy.

Independent Power Producers

78. ZERA has licensed more than 60 IPPs in the renewable energy space,
with a capacity of around 2000MW, however, off take of the projects
has been low owing to viability challenges. With the technical assistance
of the African Legal Support Facility (ALSF) Government is working to
improve the bankability of IPP projects, reduce currency related risks

and accelerate the implementation of renewable energy projects.

79. In addition, the AfDB has granted Zimbabwe a US$1.5 million-dollar


facility to help the country develop solar, hydropower and thermal power
projects that are bankable.

Rural Electrification Programme

80. It is envisaged that rural development will be accelerated through


electrification of rural areas. Efforts are being made towards promotion

of the use of renewable energy for power generation in order to achieve

ZERO harm to the environment.

31
81. Rural Electrification Programme has been a topical issue in as far as
trying to improve access to electricity for the rural population mainly
through solar grid and mini grid extensions as well as biogas projects.

82. To date, 437 solar grids, 430 solar micro-grids, 1 community solar and 89
biogas digesters have been installed.

83. For the year 2023, a combined allocation amounting to ZWL$19.3 billion
will be availed (ZWL$18.3 billion from Rural Electrification Fund) and
(ZWL$1 billion from the fiscus) to accelerate electricity transmission and
off-grid solutions to rural areas in order to improve electricity access.

84. This intervention will also help rural schools to cope up with education 5.0
that focuses on innovation and industrialisation a catalyst for achieving
Vision 2030.

85. The table below indicates the targeted interventions under the
programme.

2023 Rural Electrification Programme


Rural Rural
Electrification Targeted Scope Fiscus Electrification Total Resources
Programme Fund
3299 Rural Institutions
connected to modern forms
of energy
5054km Power distribution 13,245,000,000
lines constructed HV
1474km Power distribution 13,245,000,000
lines constructed MV
79383kVA Substation Capacity
Grid extension installed

56 Community solar mini grids


Installed 1 144,781,680 2,095,900,000 2,240,681,680
Solar panel Assembly Plant 1
Midlands Gweru 1,103,750,000 1,103,750,000
2 x 5MW Solar Power Plant
Installed 440,208,320 1,000,000,000 1,440,208,320
184 Institutional solar micro-
Solar projects grids installed 567,440,000 567,440,000

32
Rural Rural
Electrification Targeted Scope Fiscus Electrification Total Resources
Programme Fund
89 Institutional Biogas
Biogas Digesters constructed 282,560,000 282,560,000

2 x Mini Hydro Power plants


Mini Hydro Power Installed 132,450,000 132,450,000

Grand Total 1,000,000,000 18,294,650,000 19,294,650,000

86. The Zimbabwe Power Company and the Zimbabwe Electricity

Transmission & Distribution Company using own resources will prioritise

the following key interventions, among others:-

• Refurbishment and new installations for the Public Lighting System

in the major cities of Harare, Bulawayo, Gweru and Mutare;

• Hwange 1-6 life extension;

• Sherwood-Manhize 400kV line and substation project.

TRANSPORT

87. Transportation infrastructure supports economic growth and development


by increasing trade and promoting electronic governance, connectivity,
and simplification. In line with the national vision, Government’s
interventions in the transport sector seek to address bottlenecks affecting
access to major centers in order to foster economic development and
trade facilitation.

88. Therefore, priority is on ensuring road, rail and air services are seamlessly

connected within the country as well as the region. This will enhance

33
economic competitiveness while facilitating domestic, regional as well

as international trade.

89. The focus in the sector will also include the harmonization of traffic signs

to meet the agreed uniform signage in line with SADC agreed standards.

This standardisation programme is aimed at reducing road accidents

resulting from mis-interpretation of the traffic signs by the drivers.

90. The commissioning of Phase 1 of the modernised Beitbridge Border

Post through a public private partnership framework demonstrates

Government’s commitment to the transformation of transport services

from landlocked to a land linked country.

91. Such a framework is already being considered for rolling out to other

ports of entry as measures to reduce costs related to the country’s import

and export of commodities as well as transit cargo.

92. Overall support towards the transport sector during 2023 amounts to

ZWL$194.8 billion, of which ZWL$177.4 billion is earmarked for the roads


sector, ZWL$13.4 billion and ZWL$4 billion being channeled towards

rehabilitation and upgrading of airports and rail system, respectively.

Roads

93. The Road Development Programme continues to be prioritised. In this

regard, support has mainly been targeted at the upgrading of the Harare-

34
Masvingo-Beitbridge Road and rehabilitation of other trunk roads linking

border posts and major centres as well as those being implemented

under the Emergency Road Rehabilitation Programme II.

94. Lack of routine maintenance for extended periods has invariably led

to deterioration of the road network which is a cost to the economy in

the form of long travelling hours, high vehicle operating costs and road
carnage.

95. Admittedly, due to underperformance of the rail sector, heavy goods

vehicles now transport more than 90% of cargo in and out of Zimbabwe

thus, putting pressure and damage to the road network as well as causing

congestion.

96. Going forward, policy measures are being pursued to ensure road

authorities adequately maintain the network, including recently upgraded

and rehabilitated road assets by leveraging resources being mobilised

through the Road Fund.

97. In the absence of external support, Government will continue to use

domestic resources to undertake construction and rehabilitation of

roads across the country. To make meaningful progress, this will require

concerted efforts for domestic resource mobilisation to support the

desired economic transformation.

35
98. The 2023 National Budget is therefore, setting aside ZWL$194.8 billion
towards interventions in the road sector, covering construction upgrading
and rehabilitation.
98. The 2023 National Budget is therefore, setting aside ZWL$557.8 billion towards interventions
in Beitbridge–Masvingo–Harare Road and rehabilitation.
the road sector, covering construction upgrading

99. The widening, reconstruction and rehabilitation of the 580km Beitbridge-


Beitbridge – Masvingo – Harare Road
Harare Highway is a critical component of the North-South Corridor as

99.
the country is expecting over 100 international freighters ferrying different
The widening, reconstruction and rehabilitation of the 580km Beitbridge-Harare Highway is a
minerals
critical and industrial
component output Corridor
of the North-South to global
as destinations
the country is through
expecting the
over highway
100
daily. freighters ferrying different minerals and industrial output to global destinations
international
through the highway daily.
100. Implementation of the targeted works is progressing well with a total of
355km having
100. Implementation been
of the opened
targeted works istoprogressing
traffic whilst the
well with remaining
a total section
of 355km having is now
been
opened to traffic
targeted forwhilst the remaining
completion sectionthe
during is now targeted
year 2023.for completion during the year
2023.
101. In support of the target to complete the entire stretch by 2023, an amount
101. Inof
support of the target
ZWL$43 to has
billion complete the set
been entireaside
stretchfor
by 2023, an amount of ZWL$43 billion
the project.
has been set aside for the project.

Part of the 20km Masvingo Urban along Harare-Masvingo-Beitbridge road

36
Part of the 20km Masvingo Urban along Harare-Masvingo-Beitbridge road
Section of the completed Beitbridge-Harare Road

Mbudzi Traffic Interchange

102. The construction of Mbudzi Traffic Interchange meant to complement the


ongoing widening and reconstruction of the Beitbridge-Harare-Chirundu
highway by eliminating vehicle congestion at the intersection of Simon
Mazorodze Road and roads linking Chitungwiza and surrounding
residential areas with traffic along the Harare-Masvingo Road is
progressing well and is expected to be complete and opened to traffic in
2023.

103. The engineering works involve construction of 13 major bridge structures,

with 4 of them having been completed whilst works are ongoing on 5


bridges.

37
38
Mbudzi Interchange Bridge

104. Targeted works for 2023 include the following:—

• Construction of 9 bridges, including the main bridge;

• Backfilling of bridge approaches; and

• Construction of 14 approach roads, including diversion routes of

Amalinda road and its bridge.

Bridges and Other Roads

105. The year 2023 will also see the construction, rehabilitation and upgrading

of other priority bridges and road projects as follows:

• Upgrading of 7.8 km of Harare-Chirundu Road through a Japan

International Cooperation Aid (JICA) with resources amounting to

JPY97 million (approximately) USD$1.7 million;

39
• Construction of 10 km on Harare-Kanyemba starting with the missing

link between Mahuhwe and Mushumbi area;

• Construction of 8km on Golden Valley Sanyati Road;

• 5km road construction on Alaska Copper Queen Road;

• 11km road construction on Mushandirapamwe – Hwedza; and

• Rwenya bridge construction.

Section of the 6.5km constructed along Makuti - Chirundu Road

Rural Feeder Roads

106. In an effort to ensure increased access and coverage of road network

especially in underserviced and marginalised areas of the country,

40
Government through the District Development Fund (DDF) is regravelling

and maintaining rural feeder roads. This has seen works covering over

134km having been rehabilitated and re-gravelled, whilst 16 wash aways

were reclaimed during the year 2022.

107. The 2023 Budget will continue to deepen investments in rural road

infrastructure with an allocation of ZWL$3 billion being made in support

of this critical agenda to be implemented through DDF.

Emergency Roads Rehabilitation Programme II

108. The commuting public is now realizing the fruits from the ongoing roads

rehabilitation works by Government which commenced in February

2021. This noble intervention has since resulted in cost savings in vehicle

operation and maintenance costs as well as travelling time savings.

109. Already, resources amounting to ZWL$45.9 billion have been availed,

with ZWL$30.7 billion being disbursed from the budget and ZWL$15.2

billion from the Road Fund managed through ZINARA.

110. Overall progress realised under the programme is as follows:

• Over 2 000km roads have been rehabilitation and gravelled;

• 6 628km have been graded;

• 701 drainage structures constructed or repaired;

41
• 184 wash aways reclaimed;

• 4 491.5km of drains have been opened;

• 6 141km of verges have been cleared with progress continuing on

the patching of potholes with a cumulative of 4 794,8km having been

attended to.

111. The above progress has seen attainment of specific milestones, through
the respective Road Authorities, among others, as indicated below:

Ø Completion of restoration works on Cyclone Idai damaged


roads;

Ø Completion of Masvingo Urban Dualization (4 lanes);

Ø Surfacing of Granges Road in Belvedere, Harare;

Ø Construction of 11km Delport road in progress in Epworth,


Harare; and

Ø Rehabilitation of the following road networks: -

Ø Norton Road (3km), Galloway Road (2.6km) and Shukrun


road (2.8km);

Ø Gudza-Tumba Way in Chitungwiza (7.8km);

Ø Knightsbridge and Glencary roads in Harare;

Ø Amaveni road 5.5km in Kwekwe – surfacing with Asphalt


concrete is in progress;

Ø Harare–Kanyemba Road construction - 2km Mahuwe to


Mushumbi stretch now complete and opened to traffic;

42
Ø Primmed 2km of Tipperary Road in Shamva;

Ø Nyakasikana-Masango-Karanda Road, Mt Darwin—

subgrade compaction and surfacing of 17km stretch road

is still in progress;

Ø Camperdown Road, Mt Darwin - resurfacing completed on

2km stretch;

Ø Completed Somgolo bridge, 178m connecting Lupane and

Tsholotsho;

Ø Construction of Bindura - Matepatepa Road 11kms are still

in progress;

Ø Westgate Sliplane, Lomagundi Road is 100% complete

with the 2 slip lanes constructed and opened to traffic;

Ø Chakari road in Chegutu resealing of a 3 km stretch and 2.4

km have been completed;

Ø Harare-Mutare Road Dualisation Project—Melfort 6kms

section construction is in progress

43
̧

Matepatepa Mountain side road under construction

44
Camperdown Road resurfacing completed on 2km stretch

Bridge works at Harare-Mutare Road Dualisation Project – Melfort section

45
Current works at Harare-Mutare Road Dualisation Project - Melfort section

112. The Emergency Road Rehabilitation Programme II will continue to be

accorded priority as Government seeks to improve the entire country’s

road network.

113. In order to ensure value for money in the implementation of works under

Emergency Road Rehabilitation Programme II, the Ministry of Transport

and Infrastructural Development will develop a Standardised Framework

for adoption and use by all road authorities.

114. Resultantly, to fully consolidate the implementation of Emergency Road

Rehabilitation II, resources amounting to ZWL$155 billion have been

allocated and will be availed as follows:

46
Emergency Road Rehabilitation Programme II

Road Authority 2023 Allocations (ZWL$) Billion

Road Fund

Urban Local Authorities 7.9

Rural Local Authorities 6.9

Department of Roads 15.3

District Development Fund 10.9

Infrastructure Development 43.5

Sub-total 84.5

Fiscus

Department of Roads 68.1

District Development Fund 2.4

Sub-total 70.5

Grand total 155

Aviation

115. Construction works on the Robert Gabriel Mugabe International Airport

Expansion Project is progressing well and now at an advanced stage of

completion (around 75.26%), with the contractor now focusing on the

following works:

• Decoration of new terminal buildings;

• Procurement and installation of equipment such as secondary radar,

boarding aerobridges, baggage handling system, docking system

and scanners.

47
116. The expected date of completion for the new terminal buildings is May

2023. After that, construction of VVIP Pavalion and rehabilitation of the

existing International and domestic Terminal buildings will be carried out

immediately.

117. The project involves the construction of a new airport terminal, and

aprons, four new bridges, a secondary radar system, a VIP pavilion, an


airfield ground lighting, and communication system among other things.

118. On completion, the airport will be a game changer as this will handle

an additional 3.5 million passengers annually from the current capacity

of 2.5 million being handled by the existing facilities. With no doubt, the

airport will become one of the regional aviation hubs that should attract

more airlines and thereby facilitating tourist arrivals in the country.

119. Additionally, plans are underway to facilitate the modernization of the

Victoria Falls International Airport given that Victoria Falls is a regional

hub for tourism.

Rail

120. Rail infrastructure network remains key towards the provision of bulk

raw materials, finished goods and even passengers by connecting both

domestic and regional major economic centres.

48
121. Concern is however on the current network challenges associated with

aging track infrastructure and obsolete rail signaling and communication

equipment which require urgent rehabilitation and upgrading.

122. Accordingly, it remains critical that tangible actions and measures be

implored and implemented towards the revamping of the sub-sector as

this can save the damage to the road infrastructure.

123. Ensuring that NRZ recovers capacity has, therefore, become very

urgent through rehabilitation and expansion of rail infrastructure and the

acquisition of new wagons and locomotives.

124. Under the initial NRZ Recapitalisation phase, funding options are being

considered for procurement of locomotives, wagons and passenger

trains that will be used to improve the generation of cashflows to support

the recovery.

Border Posts

125. Recognising the importance of border posts in facilitating movement and

connectivity critical for international trade, Government will facilitate the

refurbishment of three major land border posts through Public Private

Partnerships (PPPs) targeting Chirundu, Plumtree and Forbes.

49
126. Already, works under the second phase of the expansion and

modernization of the Beitbridge Border Post were launched in September

2022 by by His Excellency Cde E.D Mnangangwa giving an impetus

on the ongoing infrastructure development programme and plans to

develop a second bridge across the Limpopo to enhance movement and

connectivity.

127. The project scope of modernization of the Beitbridge Border Post includes
upgrade of the entire border post commercial facilities (freight terminal,
bus terminal, pedestrian terminal), Information Communication and
Technology infrastructure, construction of a number of social projects to
improve the town of Beitbridge infrastructure such as a fire station, plant
and animal quarantine facility, residential buildings, a sewage dam, and

new water reservoirs.

128. Works on the Beitbridge Border Post Modernization Project is progressing


in earnest with Phase 1 and 2 works having been completed and now
operational. Current works relate to Phase 3 activities which comprise
construction of 11.5 megalitres water tank, houses and dualization of
the road from the Border Post to Harare-Bulawayo Road Junction and
access road to the new residential housing project are advancing well
and should be completed in the year 2023.

50
Megalitres reservoir superstructure is awaits roofing and other ancillary works

Staff Houses and road under construction at Beitbridge Border Post

51
Staff Houses and road under construction at Beitbridge Border Post

129. Additionally, Government is further exploring ways to relocate Forbes

Border Post, the port of entry linking Zimbabwe and Mozambique, to the

east with the dualisation of Mutare -Plumtree Road remaining a priority

to facilitate vehicle movement.

130. With regards to Chirundu, expansion and refurbishment of the existing


border infrastructure facilities will be given priority given its strategic
location and preferred gateway for the North-South corridor. This will

entail modernisation of surrounding amenities such as health centres,

warehouse facilities and supermarkets, among others.

52
Beitbridge border post warehouse

131. Works to align the country’s border at Kazungula with Botswana and

Zambia will also be accelerated, benefiting from the construction of

the road connecting Kazungula Bridge, in order to support trade and

transport along the North-South Corridor, as well as the Trans-African

Highway on the Cape to Cairo route.

132. The long-term objective by Government is to ensure a smooth and

continuous network coupled with requisite ancillary infrastructure such

as world class roads that meet international standards and eliminate all

forms of trade bottlenecks at ports of entry. That means all infrastructure

53
and major roads linking all border posts must be made to international

standards.

WATER AND SANITATION

133. Water is a critical enabler for different sectors of the economy and a

basic human right essential for improving the standard and quality of life

among the citizens of Zimbabwe.

134. The country’s national water supply situation is characterised by low

coverage and limited access to water with only 63% of the population

having access to at least basic water supply. Regrettably, there is notable

rural-urban divide with 48% of the rural population having access to at

least basic water supply as compared to 93% in urban.

135. In addition, there is high incidence of aged, obsolete, and overloaded

infrastructure with high water losses and limited service in some


communities, in both rural and urban areas.

136. Specifically, urban water supply is mainly affected by the following:

• Shortage and limited access to water treatment chemicals;

• Lack of planned maintenance, upgrading, and construction of new

water infrastructure;

• Non-cost reflective water tariffs making it difficult for reinvestments to

sustain service delivery;

54
• Poor billing and low collection efficiency which undermine revenue

generation and financial performance;

• Unplanned peri-urban settlements with no access to WASH services;

• Pollution of raw water sources;

• Reduction in raw water sources due to climate change induced

droughts;

• Power shortages at treatment plants; and

• High non-revenue water (39.8%).

137. In view of the above, provision of clean and safe water is at the heart

of ensuring that communities have proper sanitation facilities which are

important for health and wellbeing.

138. Government’s focus under this sector has been towards dam construction,

rehabilitation & upgrading of water supply schemes, as well as borehole

drilling and rehabilitation.

Dam Construction

139. Resources amounting to ZWL$35.1 billion were availed during the

period January to September 2022 targeting dam construction projects

with priority being on sustaining on-going works on key projects such as

Chivhu and Gwayi-Shangani dams.

55
140. Specifically, an amount of ZWL$2.6 billion was channeled towards the

implementation of Chivhu dam which is now at 98% completion level and

ready for commissioning.

Chivhu dam

141. In addition, an amount of ZWL$11.4 billion was expended on Gwayi

Shangani Dam which is now scheduled for completion during 2023

and now at 69%. The availed resources enabled the contractor to cast

concrete on the dam wall to a height of 31m out of the target of 72m,

among other critical activities.

56
Construction of Gwayi Shangani Dam

142. In 2023, the Government will upscale investment in water infrastructure

to improve service access by communities as well as open opportunities

in the other sectors of energy, agriculture, manufacturing, tourism, and

industry, that will positively drive the country’s economic transformation.

143. While priority will be accorded to key interventions that will mitigate the

effects of climate change to ensure adaptation and resilience, the 2023

Budget will specifically focus on the following key intervention areas:

• Sustaining ongoing dam construction projects;

• Supporting the development of a master plan for all dams;

• Implementing a clear programme to progressively utilise capacity of

already existing water bodies for industrial, domestic and irrigation

purposes;

• Intensification of rehabilitation and upgrading of existing water and

sanitation infrastructure, among others, with focus on the integrated

57
water supply development approach already adopted by Government;

and

• Ensuring sustainability on the provision of water through ensuring

that the User-Pay-Principle is applied across all water using sub-

sectors.

144. In view of the above, the 2023 Budget makes a provision of ZWL$30.4

billion towards the above.

145. Execution of the Gwayi-Shangani dam will be prioritised given that

its completion is a significant milestone in the implementation of the

National Matabeleland Zambezi Water Project which, when complete,

will bring significant improvement in the water situation in Matabeleland

North including the City of Bulawayo.

146. In this regard, an amount of ZWL$6.3 billion is being proposed to sustain

ongoing works and ensure completion of the project during 2023.

147. Government will also facilitate ongoing works at other dam construction

projects such as Kunzvi, Tuli-Manyange, Semwa, Ziminya, and Vungu,

with an overall allocation of ZWL$15.4 billion.

148. The Table below indicates the specific allocations and works targeted

during 2023.

58
PROJECT LOCATION PROGRESS 2023 TARGETED WORKS 2023 BUDGET
NAME (%) ALLOCATION
Gwayi-Shangani Matebeleland 69% Construction of 46m 6,297,000,000
Dam North
of the dam to reach full height of
72m, construction of outlet works,
and apron concrete placing.
Bulawayo Pipe- Matebeleland 5% Construction of two pump houses, 2,798,000,000
line North and laying of 104km of pipeline.
Muchekeranwa Mashonaland 0% Establishment of Engineer’s camp 600,000,000
Pipeline (Harare East and commencement of pipeline
East Water Aug- construction
mentation)
Semwa Dam Mashonaland 41.6% River diversion works, construc- 2,897,000,000
Central tion of the cofferdam, main dam
excavations, and main dam concrete
placing.
Tuli Manyange Matebeleland 34% Saddle dam construction, excava- 1,797,000,000
Dam South tions of main dam, concrete placing,
and construction of outlet works.
Kunzvi Dam Mashonaland 17% Finalisation of site establishment, 2,098,000,000
East cut off trench excavation, main
dam excavations, and main dam
construction.
Ziminya Dam Matebeleland 9% Site establishment, excavation of 1,123,000,000
North core trench, river diversion works,
construction of main dam, and spill-
way construction.
Vungu Dam Midlands 3% Completion of site establishment, 1,498,000,000
excavation of core trench, outlet
works excavations, and construction
of main dam.
Dande Dam Mashonaland 20% Completion of hard excavations, 600,000,000
Central grouting of main dam, backfilling,
and blasting of 7km tunnel.
Mbada Dam Mashonaland 13% Completion of site establishment, 600,000,000
Central access road construction, founda-
tion excavations, and main dam
construction.
Defe Dam 0% Preliminary works including detailed 1,000,000,000
designs, procurement and site estab-
lishment.
Bindura Dam Mashonaland 38% Main dam grouting, outlet works 400,000,000
Central establishment, and construction of
main dam.
Grand Total 21,708,000,000

59
149. Noting the number of existing idle water bodies in the country including
Tugwi-Mukosi, Marovanyati, and Muchekeranwa dams, a deliberate

programme targeted at maximising benefits from such investments, will

be undertaken.

150. In this regard, an amount of ZWL$42.5 billion has been set aside towards

development of irrigation infrastructure, fisheries and water conveyancing

systems, among other interventions.

Borehole Drilling

151. Under the Presidential Rural Development Programme, a total of 50 rigs

(ZINWA 40 and DDF 10) were procured with 10 under ZINWA having

been delivered and allocated to each of the country’s 10 Provinces. The

rigs have already commenced work and to date 270 boreholes have

been drilled countrywide.

152. Moreover, a total of 747 boreholes (ZINWA 275, DDF 230, and

Development Partners 242) have been drilled country wide at community

and institutional levels.

153. With regards to rehabilitation works, a total of 4,788 hand pumps have

been rehabilitated & repaired to enable access to water to all communities.

60
Rural WASH

154. Adaptation to the effects of climate change and climate variability has

resulted in the development of 51 solar powered piped water schemes

across the country, rehabilitation and uprating of 4 water supply schemes

(Chivhu, Parirewa, Gokwe, and Nyanga) and development of irrigation

schemes using existing water bodies.

155. In view of sanitation and hygiene, four hundred and seven (407) villages

have been triggered for behavior change and for the attainment of an

Open Defecation Free (ODF) status with community sanitation & hygiene

structures having been set up.

156. During 2023, priority will be towards strengthening sector information

management through rolling out the Rural WASH Information

Management System, Urban WASH Information Management System,

and ground water modelling.

Rural Development Programme

157. In line with the focus of NDS1 on rural development, the Government

has a commitment to accelerate the Presidential Rural Development

Programme, which covers interventions including borehole drilling,

solarisation, development of horticulture gardens, water supply, livestock

production and fisheries in order to improve livelihoods and quality of life

for rural communities.

61
158. The programme has a target of drilling of 8,600 boreholes which will be

equipped with solar powered systems as the country moves towards

climate smart forms of energy and efficient technologies.

159. In addition, there is also a new component aimed at rehabilitating and

equipping 2,500 existing boreholes with hand pumps and equipping

another 2,500 boreholes with solar pumps in order to empower our rural
communities.

160. In order to support the above interventions, the 2023 Budget makes a

provision of ZWL$2.1 billion towards the Rural Development Programme.

Water Supply Schemes for Small Towns and Growth Points

161. In line with the thrust of “leaving no one behind”, focus during 2023 is

directed towards improving access to water in small towns and growth

points through provision of water supply schemes to communities

experiencing water challenges.

162. In addition, rehabilitation and upgrading of existing water supply schemes

is among the strategic interventions being targeted to ensure availability

of clean, and safe drinking water for the communities.

163. The 2023 Budget makes a provision of ZWL$2.1 billion to ensure

achievement of the above interventions specifically targeting projects

indicated in the Table below:

62
PROJECT 2023 PLANNED WORKS 2023 BUDGET
NAME ALLOCATION
Dema Water Supply and install pump sets, construction of 200mm, raw water 74,717,000
Supply abstraction pumping main, completion of a 50m³/h radial filter and
sedimentation unit, backwashing system & sump, pumping main to Dema,
Construction of 1000m³ tank.
Nyanga Construction of a new treatment plant (50m3/hr). 19,925,000
Water Supply
Hauna Water Completion of 3 500km of 200mm PVC clear water main from the 54,793,000
Supply treatment works to Hauna, completion of twin 75m³/h radial filter and
sedimentation, completion of upholding weir.
Filabusi Completion of construction of a new treatment plant (50m3/hr), upgrade 44,830,000
Water Supply clear water pumps, and construction of 2 880 reinforced concrete
reservoir.
Colleen Bawn Construction of a new sedimentation tank and filter tank (100m3/hr), 149,435,000
Water Supply installation of new raw water pumps, laying of pumping main of 315mm
diameter and PVC pipes and construction of clear water sump.
Parirewa Construct 1000m³ Tank, reticulation Extension. 99,623,000
Water Supply
Inyathi Water Supply and install pump sets, completion of clear water main, clear water 24,906,000
Supply pumping main, and installation of elevated tanks at booster station.
Vic Falls Construction of 100m3/hr new treatment plant, sedimentation and 2 filter 24,906,000
Airport Water tanks and 250m3 sump, electrification and transformer upgrading.
Supply
Mataga Water Construction of 2 x 60m³/h new treatment plant filter and sedimentation 64,755,000
Supply unit, and construction of 1 000 reinforced concrete reservoir.
Mberengwa Construct raw, clear water and water pump house, supply and install pump 134,491,000
Water Supply sets, construct a 150m³/h reinforced concrete filter and sedimentation unit,
and construct 500m³ brick reservoir.
Jerera Water Construction of a new treatment plant 50m3/hr sedimentation and filter 49,812,000
Supply unit, and supply and install water pump sets.
Mhangura Construction of raw water pump house, reticulation of Damba and 79,699,000
Water Supply Chebanga high density, construction of sewer trunk mains, construction of
waste water stabilisation ponds, and construction of 1 000m3 RC reservoir
Goromonzi Construction of 150m3/hr reinforced concrete sedimentation and filter 174,340,000
Water Supply unit, supply and install pump sets, construction of 500m3 brick reservoir at
Chinyika school, and construction of 2 280m3 reinforced concrete reservoir
at Goromonzi Centre.
Lutumba Construction of 20km pumping main from Beitbridge Lutumba, 500 m3 498,116,000
Water Supply reservoir, and booster pump station.
Nyabira Construct raw, clear and booster station pump houses, supply and install 547,928,000
Water Supply raw water pump sets, construction of 450mm raw water pumping main,
7km long of 315mm clear water pumping main, and 15km of 200mm from
Nyabira to New Parliament.

63
PROJECT 2023 PLANNED WORKS 2023 BUDGET
NAME ALLOCATION
Checheche Construct 100 m3 new treatment plant sedimentation tank, filter tank and 74,717,000
Water Supply 250m3 sump, 1.6km raw water pumping main, 6.5km clear water pumping
main, 13km reticulation main, Supply and install water pump sets,
Construction of 2 280 reinforced concrete reservoir.
Murambinda Construction of 250m3 clear water sump, construction of booster pump 24,907,000
Water Supply house, supply and install booster pumping plant, trench, lay 3km of
reticulation main, and construction of 2 280m3 reinforced concrete tank
Grand Total 2,142,000,000

HEALTH AND WELL-BEING

164. Health and well-being are fundamental pre-requisites to, as well as


beneficiaries of socio-economic development, towards attainment of
Vision 2030.

165. The global Covid 19 pandemic, which has since subsided, presented
an opportunity for our health delivery sector to reflect on its efficiencies
and capacities in infrastructure, prerequisite curative and diagnosis
equipment, and rapid response services. Government has, therefore,
over the past 2 years invested significantly in health infrastructure, medical
equipment and ambulances, covering all levels of care, increasing its
readiness for any future pandemics.

166. On 13th May 2022, His Excellency, President E.D Mnangagwa presided-
over the ceremonial opening of the NMS-built Stoneridge Health Centre,
that will see the construction of thirty 22-bed Health Centres Facility.

167. Significant progress has been made on Cowdry Park Health Centre
in Bulawayo and is expected to be completed by year-end, whilst

64
preparatory works are underway for other facilities in Mberengwa and
Chimanimani.

Stoneridge Health Centre

Manyame Hospital

168. The President also commissioned 32 state-of-art fully equipped

ambulances. This development is set to contribute greatly towards

reduction in avoidable maternal deaths, road traffic accident causalities,

as well as improving the general patient transportation and referral

65
systems.

169. The supply, delivery and installation of high-tech medical equipment

under a Programme to modernise the health sector and ensure world-

class services was a major stride towards the implementation of NDS1.

170. Pieces of equipment under this programme included magnetic resonance

imaging machines, image intensifiers, fixed digital X-ray machines, mobile

digital X-ray machines, anaesthetic machines, ophthalmic microscopes,

dental sets, vital signs monitors, Covid-19 virtual hospital equipment,

ventilators, theatre lights, multi-parameter monitors and ultrasound scan

machines.

171. In its endeavor to increase access to health services in marginalised

areas, Government completed the construction of seven rural health

centers, whilst the procurement of assorted basic medical equipment

is currently underway. Through the support of our development partner

(UNICEF), boreholes were drill at 10 primary health facilities, whilst 14

other centers are now solar powered.

172. The rehabilitation and expansion of wards, kitchens, and laundry facilities

at Chiredzi, Binga, Chipinge, Gokwe South, Guruve, and Kariba district

hospitals were completed. Critical sections, comprising the maternity,

theatres and out-patient and casualty departments at Masvingo and

Victoria Provincial Hospitals were also rehabilitated during 2022.

66
173. The renovations of two medical residential suites at Mpilo Central

Hospital were completed during the first half of 2022 and whilst three

more, with a total capacity of 18 apartments, will be ready for occupation

before year-end.

174. The 250-bed Lupane Provincial Hospital in Matabeleland North, is now

nearing completion and ongoing works include the development of


central stores, a pharmacy, a casualty section, an outpatient department

and an administration block. Also under construction are junior staff flats,

a maternity block, a surgical ward, a pediatric ward, a dental and eye

clinic, as well as antenatal and post-natal sections.

175. Implementation of the First Phase of the Health Informational

Management System (HIMS) is underway, with Mpilo and Chitungwiza

Central Hospitals now connected. The System is now being rolled to all

Central Hospitals by year-end.

176. As the country accelerates progress towards ending AIDS and public

health therapy by the year 2030, in September 2022, Government

also commissioned Gweru provincial hospital opportunistic infections

antiretroviral therapy center that will cater for over 3 500 people who are

in need of HIV specialized care and support.

177. During the year 2023, public health investment thrust will mostly
be focusing on consolidating and strengthening the critical health

67
interventions which have received lesser attention in the past two years,
as the country concentrated mainly on the Covid 19 pandemic. This
rejuvenation drive will ensure the full utilisation of excess capacities and

related co-benefits in infrastructure and equipment utility steered by the

COVID-19 fight.

178. The resuscitation of operating theatres, expansion of all diagnostic

units at Central and Provincial Hospitals and establishment of adequate

blood banks and storage facilities, expansion of dental units and support

services such as staff accommodation, canteens and medical waste

incinerators, among others will be prioritised.

Central and Quinary Hospitals

179. Our Central hospitals have transited into lower entry-point, mainly due

Covid 19 emergencies and some inefficiencies that had crept into the

referral system. Therefore, massive investments in the renovation and

rehabilitation at these institutions has become paramount.

180. In this regard, the 2023 Budget makes a provision of ZW$19.8 billion

towards the rehabilitation of the 6 central hospitals.

181. Following the establishment and accreditation of additional medical

schools, the Ministry of Health and Child Care, in collaboration with

the Ministry of Higher and Tertiary Education, Science and Technology

68
Development and related stakeholders, is establishing a stand-alone

research and teaching hospital. To kick-start this programme, an amount

of ZW$1.2 billion has been set-aside towards the project.

Provincial Hospitals

182. The transformation of Gweru Provincial Hospital into a Medical Centre

of Excellence through the provision of modern equipment has motivated

Government to replicate the model to Masvingo and Chinhoyi Provincial

Hospitals. Resources amounting to ZW$716 million are hereby being

allocated on these facilities targeting the procurement of high-tech

equipment and refurbishment activities.

183. The establishment of the long-awaited Gwanda and Bindura Provincial

Hospitals have become imminent due to rapidly expanding populations

and absence of district hospitals within these major urban centres. In this

regard, the 2023 Budget proposes to avail ZW$792 million for the pre-

requisite preparatory works.

184. The completion of Lupane Provincial Hospital under phase 1, which has

been on the cards since 2007 is becoming a reality for Matabeleland

North Province. To ensure seamless delivery for corresponding

services, ZW$3.5 billion will be channelled towards the final touches and

procurement of equipment, before works on Phase 2 commence.

69
Casualty Block Outpatients Block

District Hospitals and Mission Hospitals

185. District hospitals, being the mainstay of the health referral system, play

a critical role in ensuring that quality health services are delivered closer

to the rural populace.

186. Accordingly, Government has taken a deliberate decision to target 12

hospitals in 2023 at a cost of ZW$1.8 billion. Targeted works will include

replacement of now inefficient plant and equipment laundry, kitchens,

incinerators among others.

187. In addition, mission hospitals have played a crucial role in the provision
of medical services in some rural areas, where Government, is yet to
establish comprehensive secondary care facilities. In this regard, an
amount of ZW$154 million will be allocated to selected 5 faith-based
hospitals in 2023.

70
Primary Health Care

188. In line with leaving no-one and no place behind philosophy, Central
and Local Governments, in 2023, will continue to roll out more primary
health facilities aimed at ensuring that all settlements are within the
recommended 5-kilometre radius to health services.

189. Government in 2023, will spearhead the completion of the rural health
centre projects through an allocation of ZWL$9.3 billion as indicated in
the table below:

Project Targeted works Amount (ZW$)


Completion of clinics under Completion of Sai, Kezi, Kanyemba,
6,000,000,000
construction Odzi and Msapakaruma Health centres
Rehabilitation of clinics Rehabilitation of 120 clinics 1,100,000,000
Security fencing Security fencing of 160 clinics 660,000,000
Drilling and/or upgrading of 300
Water supply 595,000,000
boreholes
Health Posts Construction of 100 health posts 980,000,000
Total 9,335,000,000

190. Local Authorities are urged to continue developing rural health centres

and health posts in their jurisdiction utilising the IGFT allocation.

Ambulances & Medical Equipment

191. During 2023 Government will procure additional ambulances, service

vehicles as well as essential medical equipment. An amount of ZW$3

billion has been set aside for this purpose.

71
HUMAN CAPITAL DEVEPOPMENT AND WELL-BEING

Basic Education

192. As part of Government efforts to improve access to quality and inclusive

education, resources amounting to ZWL$270 million were channelled

towards construction of 35 new schools across the country whose

implementation modalities have been agreed upon through an Inter-

Ministerial Committee.

193. Already under the programme, preparatory works such as school site
establishment and clearance have been completed and tendering

processes for the supply and delivery of materials is currently underway.

194. During 2023, focus will be on completion of the 35 schools which


incorporates equipping them with requisite furniture and equipment

which include science laboratories equipment in order to align them with

modern institutions.

195. In addition, resources amounting to ZWL$210 million were availed

targeting the rehabilitation of storm damaged infrastructure with works

such as repair of windows and blown away roofs done on 230 classroom

blocks and teachers houses countrywide.

72
196. Government will also prioritise investments towards the ICT services and

provision of digital tools in schools in line with technological advancement.

Already the responsible Ministry has engaged educational partners like

UNICEF, and Microsoft through a program called GIGA to connect schools

in the country.

197. In this regard, the 2023 National Budget will allocate ZWL$600 million

to source the required ICT equipment for all schools as part of the

digitization drive.

198. Riding on the Rural Electrification Programme, the 2023 Budget will

prioritise the electrification of selected rural schools through the Rural

Electrification Agency which will be complimented by solarisation

exercise through Development Partner support.

Tertiary Education

199. The 2022 National Budget kick started the implementation of Gender

Responsive Budgeting aimed at ensuring that Budgets are gender

responsive in line with our Constitution, regional and international gender

equality and women empowerment conventions/protocols to which our

government has acceded to.

200. In line with this thrust, Bindura University of Science Education has

successfully completed the construction of a student female hostel which

is set to ease accommodation challenges for 352 female students who

73
might be susceptible to abuse if they fail to secure decent accommodation

in the surrounding suburbs.

201. Additionally, priority by Government under the sector has been towards

the provision of teaching and learning infrastructure mainly focusing on

the construction of lecture theatres at new state universities as well as

provision of additional infrastructure at already established universities.

202. In support of this drive, resources amounting to ZWL$5.1 billion were

availed, which have seen the successful completion of lecture theatre

at Manicaland University of Applied Sciences and the Simon Mazorodze

School of Medical and Health Sciences at Great Zimbabwe University

with the capacity to enrol 40 medical students as well as construction of

other facilities at State Universities, Teachers Colleges and Polytechnics.

74
Simon Mazorodze School of Medical and Health Sciences, Great Zimbabwe University

203. Consistent with the NDS1 strategic objectives, the focus during 2023

will therefore be on construction, rehabilitation and upgrading of facilities

as well as provision of equipment and ICT services in order to embrace

e-learning at institutes of higher education.

204. Accordingly, in support of the infrastructure interventions under the

education sector, an amount of ZWL$14 billion has been allocated

towards activities as indicated in the table below.

75
2023 Allocation
Name of Institution Project
(ZWL$)
State Universities
Male halls of residence 700,000,000
Bindura University of Science Education Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 830,000,000
Faculty of Humanities 800,000,000
Lupane State University Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 930,000,000
Student Admissions 200,000,000
Manicaland University of Applied Halls of Residence 360,000,000
Sciences Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 690,000,000
Pathology Laboratory 400,000,000
Construction of faculty of Law 300,000,000
Midlands State University Industrial Park 50,000,000
Innovation Hub 80,000,000
Halls of Residences 320,000,000
Sub Total 1,150,000,000
Industrial Park 50,000,000
Chinhoyi University of Technology Innovation Hub 80,000,000
Engineering workshops Phase 1 300,000,000
Sub Total 430,000,000
Library 600,000,000
National University of Science and Students Service Centre 500,000,000
Technology Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 1,230,000,000
Rehabilitation of infrastructure 100,000,000
Lecture Block 150,000,000
Gwanda State University Mining Lab 150,000,000
Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 530,000,000
Teaching Hospital 100,000,000
Great Zimbabwe University Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 230,000,000
Rehabilitation of infrastruc-
50,000,000
ture
Harare Institute of Technology Laboratory Plaza 200,000,000
Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 380,000,000

76
2023 Allocation
Name of Institution Project
(ZWL$)
Students Affairs Building 200,000,000
Halls of residence 200,000,000
University of Zimbabwe
Industrial Park 50,000,000
Innovation Hub 80,000,000
Sub Total 530,000,000
Office block 150,000,000
Marondera University of Agriculture
Industrial Park 50,000,000
Sciences and Technology
Innovation Hub 80,000,000
Sub Total 280,000,000
Administration, Teaching and
100,000,000
Learning Block
Zimbabwe Open University
Multipurpose Hall 100,000,000
Innovation Hub 80,000,000
Sub Total 280,000,000

Polytechnics, Teachers’ and Industrial Training Colleges


Marymount Teachers’ College Female Hostel 100,000,000
Msasa Industrial Training College Student Hostel 100,000,000
Hwange Campus College Lecture Blocks 100,000,000
Hwange Teachers’ College Administration Block 150,000,000
Madziwa Teachers’ College Rehabilitation of infrastructure 50,000,000
Belvedere Teachers College Rehabilitation of infrastructure 50,000,000
Belvedere Teachers College Library 50,000,000
Mutare Teachers’ College Rehabilitation of infrastructure 50,000,000
United College of Education Rehabilitation of infrastructure 50,000,000
Management Training Bureau Rehabilitation of infrastructure 50,000,000
Mutare Teacher’s College Baobab Workshop Block 50,000,000
J.M. Nkomo Polytechnic Home Economics Block 60,000,000
J.M. Nkomo Polytechnic Lecture Theatre 100,000,000
Mkoba Teachers’ College Science Centre 50,000,000
Gweru Polytechnic College Fabrication Workshop 50,000,000
Bulawayo Polytechnic College Rehabilitation of infrastructure 100,000,000
Harare Polytechnic College Library 50,000,000
Mutare Polytechnic College B- Tech Block 100,000,000
Plumtree Polytechnic College Lecture Blocks 200,000,000
School of Hospitality Designs 150,000,000
Chivi Industrial Centre Lecture Blocks 200,000,000
Binga Industrial Centre Lecture Blocks 200,000,000
Kwekwe Polytechnic College Lecture Blocks 50,000,000
Hillside Teachers’ College Multipurpose sportsfield 60,000,000
Waterfalls Incubation Centre Workshop Block 150,000,000
Sub Total 2,320,000,000
Basic Education
Construction of 35 new
Construction of new schools 1,810,000,000
schools
Drilling of boreholes Drilling of boreholes 400,000,000
Laboratories Provision of laboratories 200,000,000

77
2023 Allocation
Name of Institution Project
(ZWL$)
Construction of new classroom
Construction of classroom blocks 815,000,000
blocks
Rehabilitation of schools Rehabilitation of infrastructure 415,000,000
Sub total 4,180,000,000

Grand Total 13,990,000,000

205. In order to complement Government efforts towards provision of student


accommodation, the Infrastructure Development Bank of Zimbabwe
working with the private sector embarked on the construction of the
Bulawayo Student Accommodation Complex which comprise three
blocks of flats with the capacity to house 1 032 students.

206. The intention for the Bulawayo Student Accommodation Complex is to


alleviate accommodation challenges for tertiary institutions in Bulawayo
which include the National University of Science and Technology,
Zimbabwe School of Mines and Hillside Teachers Collage among others.

207. Notable progress has been achieved with the construction of two blocks
[B3 and B1] having been completed and now ready for occupation before

end of 2022.

208. Upon completion, the project will provide a commercial centre on the
ground floor of each block that should allow the operationalisation of

restaurant, supermarket, entertainment centre, bookshop, doctors’

rooms, saloon, pharmacy among others.

78
Bulawayo Student Accommodation Complex Completed Block

209. Under the same arrangement of crowding in private sector and institutional

investors on infrastructure projects, the year 2023 will see the construction

of Lupane Student Accommodation Complex that should accommodate 1

836 students, warden’s houses including a commercial centre in Lupane.

High Performance Computing Center Phase II

210. Government successfully completed the construction of the High

Performance Computing System at the University of Zimbabwe with the

grant of the People’s Republic of China. Phase II of the project, which

would entail increasing the computing power and storage capacity for

the HPC system, has completed letter exchange between Zimbabwean

and Chinese side.

79
211. Phase II shall address the development of meteorological monitoring,

mineral explorations, life sciences, agriculture and e-government among

other services. The capacity development of local engineers who would

maintain the system has already been done.

Modernisation of Public Service Academy Institutions

212. The Public Service Academy (PSA) is an integration of 14 public service

training institutes including the Zimbabwe Institute of Public Administration


and Management (ZIPAM). It is the principal vehicle through which all
public sector human capacity development are executed.

213. To this end the PSA endeavors to contribute to economic growth


through modernizing the infrastructure and architecture of training
and development in the Public Service. This will be achieved through
upgrading training, residential and conferencing facilities to standards
obtaining in the hotel and conferencing sector.

214. To this end, the 2023 Budget has set aside ZWL$2 billion to support the
planned modernization programmes as indicated in the table below.

PROJECT ALLOCATION
(ZWL$)
Equipment for training centres and academies 345,000,000
Rehabilitation of training centres
Domboshava 120,000,000
Highlands 90,000,000
Elangeni 100,000,000
Rowa 90,000,000
Toronto 100,000,000

80
Inyati 100,000,000
Eskoveni 100,000,000
Bikita 90,000,000
Senga 100,000,000
Murewa 90,000,000
Chinhoyi 120,000,000
Alford 100,000,000
Zimbabwe Institute of Public Administration and Management 473,000,000

TOTAL 2,018,000,000

HOUSING DELIVERY

215. In line with the Zimbabwe National Human Settlement Policy aimed at

providing guidance on the development of housing and social amenities

in the country and the NDS1, Government intends to facilitate the

construction of 225 000 new housing units drawing funding from both

the public and private sector as well as international funders by the year

2025.

216. This thrust entails densification of settlements that include the creation of

smart cities, adoption of cost-effective housing units that are affordable to

citizens and the use of alternative building technologies and designs that
confirm to climatic changes shocks and generally speak to modernity.

217. Resources amounting to ZWL$14.3 billion have been channeled towards

the housing sector between January and September 2022 in support

of various housing delivery projects in an effort to address the current

housing backlog.

81
218. Supported projects range from the construction of residential flats,

institutional accommodation and Government composite office blocks

as well as servicing of residential stands.

Residential Accommodation

219. With regards to construction of flats, work is progressing well in the

construction of residential accommodation in Marondera, Senga and

Dzivarasekwa.

220. In this regard, the initial four blocks of flats for Senga and Marondera

are targeted for completion in 2023. In addition, 3 blocks of flats at

Dzivarasekwa have been roofed whilst 1 block is still under construction.

82
Block of flats under construction in Marondera

221. The focus during 2023 will continue to be on ensuring that our settlements
are well organized whilst at the same time having the requisite
infrastructure that defines a properly structured settlement.

222. Given the above and also taking into consideration settlements such
as Caledonia, Harare South and Garikai/Hlalani Kuhle which were
developed without onsite and offsite infrastructure, among other ancillary
services, Government will continue to work with our institutions of higher
learning to develop settlement plans for such areas in fulfillment of the
agenda of regularising illegal settlements.

223. In terms of servicing of stands, Government with the assistance of the


private sector will continue to develop offsite and onsite infrastructure for
various housing development programmes across the country.

83
224. Already, the Infrastructure Development of Zimbabwe working with a

private landowner has entered into a contract to service 114 ultra-low

density stands in Willsgrove area of Bulawayo which should see the

provision of surfaced roads, water and electricity reticulation, among

other offsite and onsite infrastructure requirements.

225. The same arrangement will be undertaken in Gwanda which will involve

the servicing of 133 high density stands measuring an average of 300

square metres.

226. The new modern and cost-effective alternative housing building

technologies that are resilient to climate change already adopted by

Government will continue to be accorded priority during the year 2023.

227. Furthermore, Government has supported the construction of houses for

victims of floods in Binga and Chimanimani which will go a long way in

ensuring that the affected families have a solution to their accommodation

challenges.

84
Completed Binga Flood Victim house

Institutional Housing

228. Construction of the New Parliament Building through a grant from the

People’s Republic of China in Mt Hampden, Harare has since been

completed and now awaiting finalisation of the following enabling works

by Government, among others:

• Construction of additional parking bays;

• Additional parking slope protection;

• Landscaping;

• Permanent water tank;

• Dedicated powerline; and

• ICT connectivity to the building.

85
229. Completion of the remaining works will pave way for occupation for both

Senate and National Assembly, as well as, other ancillary facilities.

Completed New Parliament Building

230. Government has also been constructing 4 story blocks of composite


offices in Lupane which are intended to house various Government
Ministries and Departments which at the moment are operating from
Bulawayo and Hwange.

231. Construction of the four blocks have been completed with outstanding
works including installation of Telone cables, substation dressing, laying
of cables from feeder pillar to the substation, installation of gutters and
completion of sunscreens as well as balustrading.

86
Lupane Provincial Composite Office Block

232. The focus during 2023 will be on completion of ongoing works at various
composite offices including Mutoko and Siakobvu District Composite
Offices, among other projects countrywide.

233. Notwithstanding resource limitations, support towards construction of


staff accommodation for Zimbabwe National Army, Zimbabwe Prisons
and Correctional Services, ZIMRA and Immigration, among other key

Government Departments amounting to ZWL$6.6 billion will be provided.

234. Critical interventions were also undertaken towards prison and court
infrastructure resulting in the completion of Lupane Magistrates Court,
Chikurubi female open prison as well as rehabilitation and upgrading

87
of various buildings under the same that are now at different stages of
completion.

Recently completed Lupane Magistrates Court

Completed Epworth Magistrate Court

88
Gwanda Magistrates Court under construction

235. In 2023 Government will accelerate the upgrading and construction of

court and prison infrastructure in order to improve the face of the existing

infrastructure in these institutions.

236. With regards to institutional accommodation for the Zimbabwe National

Army and Airforce of Zimbabwe, focus has mainly been on construction

and rehabilitation of existing facilities across the barracks.

237. Already, at Dzivarasekwa, a total of 30 houses have been completed


whilst the other 30 are at various stages of completion. In addition, 18
housing units were successfully completed at Imbizo.

238. Below is a pictorial view of the works that were undertaken at Dzivarasekwa
in 2022:—

89
Housing Units at Dzivarasekwa under construction

239. In 2023, Government is targeting construction of 100 housing units and


20 flats at Dzivarasekwa, whilst the target for Imbizo is 15 housing units
and 20 flats.

240. Resources amounting to ZWL$3.3 billion is being set aside for these

projects during 2023.

241. Furthermore, Government has embarked on enhanced maintenance


and rehabilitation of infrastructure programme for ZNA and AFZ and to
date, significant progress has been registered with various cantonment
areas already face lifted and renewed.

242. Among the supported cantonment areas under the programme is


Amaganyana Barracks in Plumtree, Gimboki Barracks in Mutare, William
Ndangana in Chipinge, Imbizo Barracks, Charles Gumbo Barack in
Harare, and Manyame Air Base.

90
243. In order to upscale our intervention under this noble programme,

ZWL$3.1 billion has been set aside in support of the already identified

cantonment areas.

244. In honour of the fallen veterans of Africa’s liberation wars and as a way of

documenting wars fought in the continent, Government in concurrence

with other African States began the construction of the Museum of

African Liberation in July 2022 which will also be complimented by the

construction of the Liberation mall through private sector participation.

245. In this regard, foundation works mainly targeting excavations have since

been undertaken whilst the contractor during 2023 will be focusing on

the superstructure of the building, roofing, mechanical and electrical

installation, among others.

246. The 2023 Budget has therefore, made an allocation of ZWL$4.9 billion

for this project.

Civil Service Housing Fund

247. As a way of motivating public officials, Government will continue to

capitalize the revolving Housing Loan Schemes for both Senior and

Junior officials with resources for on lending to beneficiaries. These

facilities continue to make great strides in ensuring that public officials

acquire decent residential accommodation.

91
248. The 2023 National budget is allocating resources amounting to ZWL$7.5

billion towards resourcing both the Senior Officers Housing Scheme and

the Junior officers housing scheme.

249. Government, through the institutional set ups for both senior officers and

junior officers will work on measures that should ensure full recoveries

from eligible beneficiaries whilst at the same time addressing sustainability

issues to the Fund.

FOOD AND NUTRITION

Irrigation Development

250. Improved food security and nutrition remains at the core of Government’s

initiatives under the National Development Strategy 1. In this regard,

interventions towards the same have mainly been focused on the National

Accelerated Irrigation Development and Rehabilitation Programme

targeting irrigation rehabilitation and development, maintenance of

communal irrigation schemes and capacitation of A2 farmers.

251. In support of the above intervention an amount of ZWL$3.5 billion was

expended during between January to September 2022 targeting the

following:

i. Development of 21 Irrigation projects through the Turnkey Phase 1

programme wherein to date 16 projects covering 1 005ha out of the

92
target of 1 592 ha have been completed and construction works are

ongoing on 5 projects covering 432ha;

ii. Turnkey Phase 2 which is targeting 5 415ha of land on 32 projects

with 3 projects covering 350ha having been completed whilst works

are in progress on 4 projects covering 552 ha;

iii. Pedstock Center Pivot Facility where a total of 61 pivots have been

delivered out of a target of 80. A total of 52 pivots have been installed

with 47 of them now irrigating a combined area of 2 020ha out of the

targeted 2 900ha;

iv. Smallholder Irrigation Revitalisation Program (SIRP) being co-funded

by the Government of Zimbabwe and IFAD where 2 800ha are now

irrigating out of the targeted 6 100ha; and

v. Completion of feasibility studies and detailed designs for 10 out of

21 projects under the Green Climate Fund. Implementation of the

projects is expected to commence in 2023.

93
Maize crop under a 50ha centre pivot at Mtorazeni Farm, Muzarabani District

Romsely Irrigation Scheme

252. The 2023 Budget has set aside ZWL$55.3 billion towards irrigation

development targeting the following projects as indicated in the Table

below:

2023 Targeted Irrigation Projects


Project Name Potential Targeted Fiscal Resources Development Special
Hectarage Hectarage (ZWL$) Partner Drawing
Support (ZWL$) Rights (US$)
Development 42,500.00 10,500.00 22,772,440,000 20,000,000
of Irrigation
Infrastructure
Zhove (KUWAIT) 2,500.00 50.00 300,000,000

Smallhold- 6,100.00 2,000.00 800,000,000 7,013,866,000


er Irrigation
Revitalisation
Programme
(IFAD)
Green Climate 1,786.00 358.00 1,291,680,000 7,594,228,000
Fund Projects
(GCF, UNDP)

94
Project Name Potential Targeted Fiscal Resources Development Special
Hectarage Hectarage (ZWL$) Partner Drawing
Support (ZWL$) Rights (US$)
Operations and 15,000.00 10,000.00 1,620,000,000
Maintenance
of Irrigation
Schemes
Pedstock Irriga- 2,900.00 880.00 1,056,000,000
tion Equipment
Facility
Upgrading of 20,000,000
Fels Demonstra-
tion Center
Upgrading and 5,000,000
Rehabilitation
of Irrigation
Demonstration
Plots
Off-grid Small- 100,000,000
holder Farmer
Led Irrigation
Systems
Grand Total 70,786.00 23,788.00 27,965,120,000 14,608,094,000 20,000,000

253. Specifically, the support is targeting counterpart financing on SIRP,


Green Climate Fund, and Zhove irrigation scheme which are targeting a
combined hectarage of 2,480 and 200ha per District projects categorized

as follows:

Ø 50 ongoing projects covering 4,055 ha;

Ø 13 new projects covering 3,775ha;

Ø 5 projects under Turnkey Phase 1 covering 480ha;

Ø 25 projects under Turnkey Phase 2 covering 2,190ha;

Ø Installation of 33 Center Pivots covering 880ha; and

95
Ø Operations and maintenance of irrigation schemes.

254. Under the Green Climate Fund, a total of US$3 million will be availed

during 2023 targeting the rehabilitation, upgrading and climate proofing

of 651ha on 12 existing communal irrigation schemes in Masvingo and

Manicaland as provided in the Table below.

2023 Green Climate Fund Supported Projects


IRRIGATION PROVINCE DISTRICT HECTRAGE
SCHEME
Bindamombe Masvingo Chivi 34
Bwanya Masvingo Masvingo 150
Chizumba Masvingo Mwenezi 20
Matezva Masvingo Gutu 6
Nyahombe Masvingo Chivi 50
Pikinini/Jawanda Masvingo Mwenezi 150
Zvinyaningwe Masvingo Masvingo 100
Veneka/Farai Manicaland Chipinge 30
Mhakwe Manicaland Chimanimani 20
Mudzimwa Manicaland Chipinge 40
Musirizwi Manicaland Chipinge 16
Vimbanayi Manicaland Chipinge 35
Grand Total 651

255. In addition, through the support from International Fund for Agricultural

Development (IFAD), a total of US$11 million will be availed aimed at


rehabilitation of 2 000ha out of the targeted of 6 100ha under the Small

Holder Irrigation Revitalisation Programme (SIRP).

256. Furthermore, resources amounting to US$20 million will be availed from

the Special Drawing Rights (SDR) in support of works at various irrigation

schemes as detailed in the Table below.

96
SDR Support towards Irrigation Development
PROVINCE NAME OF IRRIGATION SCHEME TARGETED TARGETED WORKS
HECTRAGE
Mash Central Morefields Irrigation Scheme 170 Turnkey Supply, Delivery
and Installation of Pumping
Units,3 Centre Pivots covering
140ha, 315kva Transformer
and Infield equipment for
a semi portable sprinkler
irrigation on 30ha
Mwenje Irrigation Scheme 100 Supply and Installation of an
800m PVC pipeline
Mat North Bubi-Lupane Extension Irrigation 200 Turnkey Supply and
Scheme Construction of Pumping
Station, Pipeline, Centre
Pivots and Related Ancillary
Equipment
Manicaland Murambinda Irrigations Scheme 200 Turnkey Supply and
Construction of Pumping
Station, Pipeline, Centre
Pivots and Related Ancillary
Equipment
Ruti Irrigation Scheme 80 Construction of a Solar
Pumping Station, Pipeline,
Storage Tanks and Drag
Horse Sprinkler Irrigation
Upper Lesapi irrigation Scheme 130 Turnkey Supply and
Construction of Diversion Weir,
Conveyance Canal, Booster
Pumping Station, Pipeline,
Centre Pivots and Related
Ancillary Equipment
Mash West Muzvezve Irrigation Scheme 200 Turnkey Supply and Con-
struction of Pumping Station,
Pipeline, Centre Pivots and
Related Ancillary Equipment
Riversdale 110 Turnkey Supply and Con-
struction of Pumping Station,
Pipeline, Centre Pivots and
Fencing
Mat South Mtshabezi Irrigation Scheme 100 Extension of the existing
project by installation of
centre pivots
Smith Block Irrigation Scheme 150 Turnkey Supply and
Construction of Mainline,
Night Storage Dam, Booster
Pumping Station, Pipeline,
Centre Pivots and Fencing

97
PROVINCE NAME OF IRRIGATION SCHEME TARGETED TARGETED WORKS
HECTRAGE
Masvingo Nyahombe Irrigation Scheme 60 Turnkey Supply and
Construction of Pumping
Station, Pipeline and Infield
Irrigation Equipment
Munjera (Ruti) Irrigation Scheme 100 Turnkey Supply and
Construction of Pumping
Station, Pipeline and Infield
Irrigation Equipment
Gororo Irigation Scheme 150 Turnkey Supply and
Construction of Pumping
Station, Pipeline and Infield
Irrigation Equipment
Midlands Chaora Block Irrigation Scheme 230 Construction of a Pumping
Station, 2,9km Mainline,
Night Storage Reservoir,
Booster Pump Station, Infield
Pipelines, Centre Pivots and
Fencing
Mutange Irrigation Scheme 134 Completion of land Clearing
on 60ha and Transformer
upgrading
Mabwematema Irrigation Scheme 640 Turnkey Supply and Con-
struction of Pumping Station,
Pipelines and Infield Irrigation
Equipment on various blocks
Mash East Mutawatawa Irrigation Scheme 100 Turnkey Supply and Con-
struction of Pumping Station,
Pipeline and Infield Irrigation
Equipment
Total 2,714

257. The list of irrigation schemes to be supported through the fiscus is shown

in annexure II

Animal Disease Prevention and Control

258. Government’s continued effort in preventing loss of cattle from theileriosis,

commonly known as January disease caused by ticks, is evidenced by the

construction of new as well as rehabilitation of existing dipping facilities

across the country and the increasing frequency of dipping sessions.

98
259. The country has a total of 4,099 dip tanks out of which 3,969 are

functional, with 400 having been rehabilitated during 2022 and targeted

for commissioning this summer season.

260. An amount of ZWL$590 million has been set aside targeting construction

of 40 dip tanks and rehabilitation of 500 dip tanks across the country.

261. Additionally, in order to minimise cases of human and wildlife conflict

and the outbreaks of diseases such as anthrax and foot and mouth, an

amount of ZWL$514.2 million has been set aside targeting fencing of the

remaining 42km at Gonarezhou National Park.

CLIMATE CHANGE MAINSTREAMING

262. A changing climate and the resulting more extreme weather events are

presenting a direct threat to the design and lifespan of critical public

infrastructure, as well as significant knock-on effects for those relying on

the services these assets deliver.

263. Government takes cognisance of these climate-related shocks which

have become more frequent and extreme in recent years posing

serious threats to sustainable development with adverse impacts on

99
the environment, human health, agriculture, food security, economic

activities, natural resources and physical infrastructure.

264. The 2022 Budget laid a strong foundation for creating a more climate-

resilient, prosperous economy through formally mainstreaming climate-

related expenditures in the National Budget.

265. As the world emerges from the Covid 19 pandemic, the 2023 Budget will

build on that foundation, with a goal of accelerating the pace of progress

while considering the challenging global and regional ecological and

economic conditions.

266. The mainstreaming of climate mitigation and adaptation innovations and

strategies will continuously buffer the impacts of climate change, through

diversifying economic activities targeted at reducing vulnerability whilst

increasing the resilience of communities.

267. In 2023, a financial resource tracking tool (DevPromis) will be deployed to

assist in the monitoring of the Government’s climate action expenditures.

268. To this end, the 2023 National Budget has streamlined ZWL$182.1 billion

towards climate resilience building programmes:

100
Sector Programme/Project Allocation (ZW$)
Energy Electrification of rural areas and mini-grid solar projects 1,000,000,000

Water Dam construction 31,065,120,648


Catchment protection and management 2,986,456,000
Agriculture Research in Climate-resilient crops and livestock varieties and 1,355,628,000
and Food protection
Security Climate-Smart Agriculture (Pfumvudza/Intwasa) Programme 77,000,000,000

Fertiliser Development 102,698,000


Farmer climate-resilience extension services capacitation 3,789,204,000
Emerging Livestock diseases surveillance 3,141,000,000

Irrigation development and rehabilitation 60,130,240,000


Forestry Forestry and environmental management 1,500,000,000
Total 182,070,346,648

269. The National Adaptation Plan (NPA), expected to be launched later this

year, will provide a detailed roadmap towards steering the implementation

of robust and coordinated resilience-building programmes in infrastructure

development, livelihoods and transition safeguard guides, including

associated financing strategies.

270. Government appreciates the support from the Development Partners in

adaptation activities which are currently underway as indicated in the

table below:

PROGRAMME TARGETED ACTIVITIES PARTNERS AMOUNT (US$)


Integrated Climate Risk Increasing food security Green Climate Fund
Management for Food and livelihoods focusing and World Food 8,860,000
Security and Livelihoods on Masvingo Rural and Programme
in Zimbabwe Rushinga Districts
Building Climate Increasing agriculture Green Climate Fund
Resilience of Vulnerable productivity and agricultural and UNDP 26,600,000
Agricultural Livelihoods in livelihoods safeguards
Southern Zimbabwe

101
PROGRAMME TARGETED ACTIVITIES PARTNERS AMOUNT (US$)
Zimbabwe Resilience Hazard maps in Southern European Union,
Building Fund Zimbabwe, transformative UNDP and the 88,400,000
adaptation and disaster Governments of
risk management (DRM), Sweden and the
solarized water provision, United Kingdom
climate-smart agriculture,
and post-harvest
processing.
Support to Zimbabwe Improve Government World Bank
Recovery and Resilience systems and develop 2,000,000
capacity for DRM in
Cyclone-affected provinces,
national DRM operational
guidelines, and training
curriculum.
Idai Recovery Project The early and medium-term World Bank, UNOPS
resilient disaster recovery and Cordaid 72,000,000
and the rehabilitation
of critical community
infrastructure.
Smallholder Irrigation Improve climate-resilient IFAD 52,034,000
Revitalization Programme crop production in
Manicaland and Masvingo
Provinces.
Smallholder Agriculture Designing climate-smart IFAD 67,440,000
Cluster Project and nutrition-sensitive
investments
TOTAL 317,334,000

Source: Zimbabwe’s Initial Adaptation Communication to the UNFCCC (November 2022)

271. Opportunities lie in the private sector, where corporates can not only
reduce their own risks from the impacts of climate change but also take
advantage of new markets and businesses in the adaptation space.

DISASTER RISK MANAGEMENT

272. As we endeavour to improve disaster risk management in view of climate


change and other contemporary hazards, there is need to strengthen our

102
preparedness, recovery and resilience building through capitalisation of
Disaster Risk Management structures up to village level.

273. Appropriate equipment and supporting infrastructure such as evacuation


centres and warehouses should be put in place. The recovery projects of
Chimanimani, Tsholotsho and Binga are to be fully funded to completion
as they are degenerating into an eyesore, thereby building backlogs in
our recovery and resilience building efforts.

274. In this regard Treasury is setting aside resources amounting to ZWL$3


billion targeting the completion of houses being constructed for flood
victims in Chimanimani, Tsholotsho and Binga as well as capacitation of
the Civil Protection Unit (CPU)

DEVOLUTION

275. The year 2023 marks the fourth year since the fiscus started allocating
resources to the lower tiers of Government through the 5% Inter-
Governmental Fiscal Transfers as enshrined in the Constitution.

276. Within this context, Inter-governmental Fiscal Transfers made by the


Central Government to lower tiers of Government continues to bear positive
fruits as evidenced by a greater number of high impactful completed and
ongoing projects and programmes within various sectors of the economy.

277. Targeted interventions were on projects and programmes in the Health,


Education, Water & Sanitation, Transport and other social amenities

103
with the main focus being on construction and rehabilitation of roads,
schools, clinics and boreholes, as well as procurement of equipment
among others.

278. During the year 2022, resources amounting to ZWL$16.7 billion have so
far been disbursed as indicated in the table below.

2022 DISBURSEMENTS TO
PROVINCE 2022 BUDGET SEPTEMBER
Provincial Councils 5,913,904,100 7,740,810
Sub-Total 5,913,904,100 7,740,810

Bulawayo Metropolitan 1,348,383,000 387,997,868


Manicaland 5,665,497,200 1,637,489,376
Mashonaland Central 4,822,189,400 1,481,389,412
Mashonaland East 4,855,000,400 1,575,589,412
Mashonaland West 6,060,477,700 2,323,185,040
Matabeleland North 4,133,505,400 1,590,689,412
Matabeleland South 3,874,612,800 1,332,416,412
Midlands 6,289,184,000 2,164,645,910
Masvingo 4,976,291,800 1,464,990,496
Harare Metropolitan 4,599,954,300 2,736,705,708
Sub-Total 46,625,096,000 16,695,099,046
Total 52,539,000,100 16,702,839,856

279. The overpricing of goods and services by contractors did not spare
the devolution programme. In this regard, it affected the coverage of

programmes and projects being implemented.

280. Outlined below is also the picture collage of selected completed and

ongoing projects as well as equipment procured by local authorities

under their respective jurisdictions:

104
Key project milestones through devolution
Province Local Name of Project Pictures
Authority

Matabeleland South Gwanda RDC Mandihongola RHC

Matabeleland Gwanda Mandihongola


South RDC RHC- Staff
Houses

Matabeleland Insiza RDC Bekezela Primary


South School

105
Province Local Name of Project Pictures
Authority

Matabeleland Matobo Umlugulu Clinic


South RDC

Masvingo Masvingo Chisase clinic


RDC staff house

Masvingo Masvingo Garikai Market


Town

106
Province Local Name of Project Pictures
Authority

Midlands Vungu Rural Mobile Clinic-


RDC Vungu Rural
Health Centre

Masvingo Chivi Chombwe piped -


water scheme-
water tank

Midlands Redcliff Torwood Clinic


Painting

107
Province Local Name of Project Pictures
Authority

Mashonaland Nyaminyami Munamata


West RDC Primary School

Mashonaland Mhondoro Binya Road


West Ngezi RDC Surfacing 4.6 Km,
Turf Township in
Ward 11

Mashonaland Kariba Kariba People’s


West Market

108
Province Local Name of Project Pictures
Authority

Manicaland Chipinge Mbire Primary


RDC School

Manicaland Chipinge Towed Grader


RDC

Manicaland Mutasa RDC Backhoe Loader

109
Province Local Name of Project Pictures
Authority

Manicaland Mutasa Chirarwe


District - Nyamazi
Causeway in

Matabeleland Binga RDC Chibondo Primary


North School

110
Province Local Name of Project Pictures
Authority

Matabeleland Binga RDC Chipale Clinic


North Equipment

Masvingo Zaka RDC Benzi Clinic

111
Province Local Name of Project Pictures
Authority

Mashonaland Murehwa Gukwe ECD Block


East RDC

Midlands Gokwe Bengwe


South RDC Secondary School

112
Province Local Name of Project Pictures
Authority

Mashonaland Hwedza Chinei Clinic


East RDC

Manicaland Mutare RDC Madanga clinic

Masvingo Bikita RDC Budzi Clinic

Masvingo Bikita RDC Mupakwa School

113
Province Local Name of Project Pictures
Authority

Matabeleland Hwange Nechibondo ECD


North Block

281. Whilst notable progress has been witnessed in the implementation of the

devolution programme, the current Intergovernmental Fiscal Transfer

formula is not adequately addressing the issues of marginalisation in

various lower tiers of government.

282. Pursuant to the above, work is at an advanced stage through wider

stakeholder consultations to develop the Intergovernmental Fiscal

Transfer Administrative Manual that should see the review of the current

formula and come up with the one that brings fairness in terms of resource

allocations and utilisation thereof.

283. Additionally, Government is in the process of developing the requisite

policy, regulatory and institutional frameworks necessary to fully

operationalize and entrench implementation of the devolution agenda.

This initiative will also ensure accountability and transparency of the

fiscal grant.

114
284. To ensure smooth implementation of programmed works, capacity building

programmes will be rolled out to ensure that Government officials both

within Central Government and Local Tiers of government responsible for

spearheading the implementation of community-based projects will acquire

the requisite expertise and skills.

285. Pursuant to the above, the 2023 National Budget will provide resources

amounting to ZWL$195.5 billion being 5% of the anticipated revenues

during the year for Inter-Governmental Fiscal Transfers to local tiers of

Government as indicated in the table below:

2023 Estimates Indicative Estimates


2024 2025

Operational Capital
Grant Grant Total Grant Total Grant Total Grant
Entity (ZWL$) (ZWL$) (ZWL$) (ZWL$) (ZWL$)
Provincial
Councils 7,820,146,000 11,730,217,000 19,550,363,000 28,267,244,000 34,050,069,000

Local Authorities
Bulawayo
Metropolitan Province 508,851,000 4,579,661,000 5,088,512,000 7,357,317,000 8,862,454,000
Manicaland
Province 2,138,036,000 19,242,333,000 21,380,369,000 30,913,194,000 37,237,319,000
Mashonaland
Central Province 1,819,790,000 16,378,118,000 18,197,908,000 26,311,776,000 31,196,021,000
Mashonaland
East Province 1,832,173,000 16,489,560,000 18,321,733,000 26,490,805,000 31,910,214,000
Mashonaland
West Province 2,287,095,000 20,583,843,000 22,870,938,000 33,068,356,000 39,833,379,000
Matabeleland
North Province 1,559,895,000 14,039,061,000 15,598,956,000 22,954,033,000 27,804,923,000
Matabeleland
South Province 1,462,195,000 13,159,756,000 14,621,951,000 21,141,412,000 25,466,461,000

115
2023 Estimates Indicative Estimates
2024 2025

Operational Capital
Grant Grant Total Grant Total Grant Total Grant
Entity (ZWL$) (ZWL$) (ZWL$) (ZWL$) (ZWL$)
Midlands
Province 2,373,402,000 21,360,615,000 23,734,017,000 34,316,252,000 41,836,568,000
Masvingo
Province 1,877,944,000 16,901,506,000 18,779,450,000 27,152,608,000 32,707,409,000
Harare
Metropolitan
Province 1,735,943,000 15,623,485,000 17,359,428,000 24,699,443,000 29,595,893,000

Sub-Total 17,595,324,000 158,357,938,000 175,953,262,000 254,405,196,000 306,450,641,000

Total 25,415,470,000 170,088,155,000 195,503,625,000 282,672,440,000 340,500,710,000

286. Priority under the devolution thematic area will continue to support

construction, upgrading and rehabilitation of facilities in the health,

transport, education, water & sanitation including procurement of

plant and equipment aimed at improving service delivery within local

authorities.

287. Detailed breakdown allocations per local authority is provided under

Annexure I.

YOUTH AND WOMEN EMPOWERMENT

Women Empowerment

288. Government is implementing various initiatives that impact positively on

women. The ongoing initiatives include the following:

116
• Funding of women’s projects through the women Development Fund

and the Zimbabwe Women Microfinance Bank,

• Capacity building of women enterprises or projects in order to provide

business, technical and life skills,

• Revitalisation of women empowerment clubs,

• Creation of market linkages and exposing women ‘s products to

local, regional and international markets,

• Value chain development to promote rural industrialisation and

benefit women in rural areas,

• Development of infrastructure for provision of workspace to women

entrepreneurs,

• Formulation of policy, gender mainstreaming, fighting Gender Based

Violence and formation of an umbrella or Apex body for women

business associations.

289. In support of the above-mentioned initiatives, during the year 2022

Government through the Zimbabwe Women Microfinance Bank

disbursed ZWL$250 million to 7 150 projects comprising 6 193 women

and 957 men which resulted in the creation of 11 700 jobs and livelihoods

transformation of many societies.

290. In addition, to date 85 projects have been funded through the Women

Development Fund valued at ZWL$153 million which benefited 260

women. The year 2022 also witnessed a total of 4 000 women who were

117
exposed to markets through participation at shows, fairs and exhibitions

including Dubai Expo 2020.

291. Furthermore, Construction of the Guruve Women Gold Milling Centre

is almost complete and this will benefit 125 women as owners of this

project.

292. In terms of capacity building, 154,252 women were trained in financial

literacy and other skills such as business, technical, life, leadership and

value addition skills amongst others. This has improved business

operations and viability of projects.

Guruve Gold Milling Plant, 95% complete.

118
293. The focus during 2023 will be on recapitalisation of the Zimbabwe
Women’s Micro Finance Bank and funding of 9 150 women ‘s projects
through disbursement of funding from the Bank, supporting 120 projects
through the Women Development Fund, capacity building of 350 000
female enterprises, promotion of market access for 3 000 women including
participation and registration of women on digital platforms among others.

294. To this end, the budget is setting aside resources amounting to ZWL$3
billion targeting the capitalisation of the Zimbabwe Women Micro Finance
Bank and ZWL$3 billion for SMEDCO.

Youth Empowerment

295. Government is also implementing various initiatives that are aimed at

improving their livelihoods of the youth.

296. In this regard, Government will, in 2023, continue to prioritise the


capacitation of the youth through availing resources ZWL$3 billion for
the Youth Empower Bank and ZWL$900 million for the construction of
various Vocational Training Centres.

PUBLIC INVESTMENT MANAGEMENT

297. Strengthening of the existing institutional frameworks is key in order to


ensures sustainable infrastructure delivery that is affordable and provide
value for money.

119
298. The above thrust is necessitated by recent project delivery inefficiencies
which include cost and time overruns emanating due to poor early project
development processes coupled with institutional weaknesses.

299. There is, therefore, need to upscale requisite public investment management

capacities in the entire project cycle which covers the following:

• Project concept note;

• Pre-feasibility study;

• Feasibility study;

• Implementation, Monitoring, Reporting and Accountability; and

• Asset Registry, Management, and Evaluation

300. Emphasis by MDAs should also be directed towards procurement and

contract management processes that provide value for money on public

resources.

301. The 2023 Development Budget will continue to reinforce project


implementation strategies, meant to improve project delivery and service
outcomes to citizens including the following, among others:

• Utilisation of available technical skills within other Government

departments with the expectation to even tap into those beyond

resident in Government towards infrastructure delivery;

• Central procurement through direct purchase from manufacturers on

commonly used materials to enable economies of scale to be realised;

120
• Strengthening of Monitoring and Evaluation systems within MDAs for

the purpose of ensuring that beneficiaries derive immediate benefits

from the interventions;

• Accelerate the already adopted Quick Win Targeted Approach in the

implementation of projects and programmes in those sectors that

have not adopted it with the intention of allowing limited funding be

directed to key interventions to derive maximum impact.

• Use of Inter-Ministerial Committees to project planning and execution

in order to enable quick decision making.

• Mandatory for all Implementing Agencies to submit detailed quarterly

progress reports covering both financial and physical performance in

order to guide the next disbursement of funding.

302. This, therefore, calls for MDAs to abide with the dictates of the Zimbabwe

Public Investment Management Guidelines in order to improve

infrastructure delivery at large.

303. Going forward, Treasury will be cautious on its decision to fund submitted

projects in accordance with the provisions of these Guidelines.

Project Preparation Development Fund

304. In 2017, Government establishment the Project Preparation Development

Facility targeting the development of bankable projects which should

enable potential investors to make appropriate decisions.

121
305. Ordinarily, the purpose of the Fund is to finance project development

costs which covers the following:

• Pre-feasibility and feasibility studies;

• Environmental and social impact assessments; and

• Detailed project designs.

306. Notwithstanding the existence of this Fund since 2017, resource uptake

and utilisation by Implementing Agencies has remained very minimum

despite the country’s huge infrastructure deficit and the subsequent

funding requirements.

307. In view of the above, the 2023 budget will target capacitation of the fund

& MDAs as well as dissemination of information on the existence and

purpose of the Fund to implementing agencies.

122
ANNEXURES
Annexure I: Inter-Governmental Fiscal Transfers Allocation
ANNEXURE I: 2023 INTERGOVERNMENTAL FISCAL TRANSFERS
Indicative Estimates
2022 Estimates 2023 Estimates 2024 2025
Operational Capital Grant Total Grant Total Grant Total Grant
Ref Entity Grant (ZWL$) (ZWL$) (ZWL$) (ZWL$) (ZWL$)

PROVINCIAL
A COUNCILS

1 Bulawayo Metropolitan 140,323,400 185,554,000 278,331,000 463,885,000 670,717,000 807,930,000


2 Manicaland 840,003,100 1,110,764,000 1,666,145,000 2,776,909,000 4,015,044,000 4,836,430,000

3 Mashonaland Central 544,400,500 719,879,000 1,079,818,000 1,799,697,000 2,602,123,000 3,134,458,000


4 Mashonaland East 670,432,400 886,534,000 1,329,801,000 2,216,335,000 3,204,528,000 3,860,100,000
5 Mashonaland West 763,097,000 1,009,068,000 1,513,603,000 2,522,671,000 3,647,450,000 4,393,633,000
6 Matabeleland North 445,301,500 588,836,000 883,254,000 1,472,090,000 2,128,448,000 2,563,880,000
7 Matabeleland South 564,340,900 746,246,000 1,119,369,000 1,865,615,000 2,697,433,000 3,249,265,000
8 Midlands 797,152,900 1,054,101,000 1,581,151,000 2,635,252,000 3,810,226,000 4,589,710,000
9 Masvingo 740,545,400 979,247,000 1,468,870,000 2,448,117,000 3,539,654,000 4,263,785,000
10 Harare Metropolitan 408,307,000 539,917,000 809,875,000 1,349,792,000 1,951,621,000 2,350,878,000

B Total 5,913,904,100 7,820,146,000 11,730,217,000 19,550,363,000 28,267,244,000 34,050,069,000

C LOCAL AUTHORITIES

BULAWAYO
METROPOLITAN
PROVINCE
1 Bulawayo City Council 1,348,383,000 508,851,000 4,579,661,000 5,088,512,000 7,357,317,000 8,862,454,000

MANICALAND
PROVINCE
2 Mutare City 517,800,100 195,407,000 1,758,659,000 1,954,066,000 2,825,320,000 3,403,316,000
3 Chipinge Town Council 263,616,900 99,483,000 895,350,000 994,833,000 1,438,398,000 1,732,660,000
4 Rusape Town Council 245,230,000 92,544,000 832,899,000 925,443,000 1,338,070,000 1,611,808,000
5 Makoni RDC 748,988,800 282,652,000 2,543,872,000 2,826,524,000 4,086,781,000 4,922,842,000
6 Chipinge RDC 825,487,000 311,521,000 2,803,691,000 3,115,212,000 4,504,186,000 5,425,638,000
7 Mutasa RDC 590,623,000 222,889,000 2,005,998,000 2,228,887,000 3,222,676,000 3,881,961,000
8 Nyanga RDC 502,315,400 189,563,000 1,706,066,000 1,895,629,000 2,740,830,000 3,301,540,000
9 Buhera RDC 730,010,900 275,490,000 2,479,413,000 2,754,903,000 3,983,227,000 4,798,103,000
10 Chimanimani RDC 521,832,400 196,928,000 1,772,354,000 1,969,282,000 2,847,322,000 3,429,819,000
11 Mutare RDC 719,592,700 271,559,000 2,444,031,000 2,715,590,000 3,926,384,000 4,729,632,000
Sub-total 5,665,497,200 2,138,036,000 19,242,333,000 21,380,369,000 30,913,194,000 37,237,319,000
MASHONALAND
CENTRAL PROVINCE
12 Bindura Municipality 293,693,000 110,833,000 997,501,000 1,108,334,000 1,602,506,000 1,899,978,000
13 Mvurwi Town Council 253,322,300 95,598,000 860,385,000 955,983,000 1,382,226,000 1,638,808,000
14 Pfura RDC 671,738,100 253,500,000 2,281,497,000 2,534,997,000 3,665,271,000 4,345,654,000
15 Muzarabani RDC 533,021,300 201,151,000 1,810,358,000 2,011,509,000 2,908,376,000 3,448,257,000
16 Mazoe RDC 678,944,500 256,219,000 2,305,973,000 2,562,192,000 3,704,592,000 4,392,274,000
17 BinduraRDC 478,988,300 180,760,000 1,626,839,000 1,807,599,000 2,613,549,000 3,098,701,000
18 Chaminuka RDC 502,925,700 189,793,000 1,708,140,000 1,897,933,000 2,744,161,000 3,253,559,000
19 Mbire RDC 449,563,500 169,656,000 1,526,900,000 1,696,556,000 2,452,996,000 2,908,344,000

123
ANNEXURE I: 2023 INTERGOVERNMENTAL FISCAL TRANSFERS
Indicative Estimates
2022 Estimates 2023 Estimates 2024 2025
Operational Capital Grant Total Grant Total Grant Total Grant
Ref Entity Grant (ZWL$) (ZWL$) (ZWL$) (ZWL$) (ZWL$)
20 Guruve RDC 523,944,000 197,725,000 1,779,526,000 1,977,251,000 2,858,843,000 3,389,530,000
21 Rushinga RDC 436,048,700 164,555,000 1,480,999,000 1,645,554,000 2,379,256,000 2,820,916,000
Sub-total 4,822,189,400 1,819,790,000 16,378,118,000 18,197,908,000 26,311,776,000 31,196,021,000
MASHONALAND
EAST PROVINCE
22 Marondera Municipality 246,166,000 92,898,000 836,078,000 928,976,000 1,343,176,000 1,617,958,000
23 Manyame RDC 422,823,800 159,564,000 1,436,080,000 1,595,644,000 2,307,091,000 2,779,070,000

24 Mudzi RDC 554,143,500 209,122,000 1,882,097,000 2,091,219,000 3,023,626,000 3,642,190,000

25 Mutoko RDC 553,906,100 209,032,000 1,881,292,000 2,090,324,000 3,022,332,000 3,640,632,000

26 Murehwa RDC 624,635,600 235,724,000 2,121,518,000 2,357,242,000 3,408,261,000 4,105,512,000

27 Hwedza RDC 394,044,100 148,704,000 1,338,335,000 1,487,039,000 2,150,061,000 2,589,914,000

28 Goromonzi RDC 651,917,000 246,020,000 2,214,176,000 2,460,196,000 3,557,118,000 4,284,822,000

29 UMP RDC 500,938,500 189,044,000 1,701,392,000 1,890,436,000 2,733,320,000 3,292,494,000

30 Chikomba RDC 472,399,200 178,273,000 1,604,461,000 1,782,734,000 2,577,599,000 3,104,916,000

31 Marondera RDC 434,026,600 163,792,000 1,474,131,000 1,637,923,000 2,368,221,000 2,852,706,000

Sub-total 4,855,000,400 1,832,173,000 16,489,560,000 18,321,733,000 26,490,805,000 31,910,214,000


MASHONALAND
WEST PROVINCE

32 Chinhoyi Municipality 321,389,600 121,286,000 1,091,570,000 1,212,856,000 1,753,629,000 2,112,381,000

33 Kariba Municipality 234,977,700 88,676,000 798,080,000 886,756,000 1,282,131,000 1,544,426,000

34 Karoi Town Council 274,114,200 103,445,000 931,004,000 1,034,449,000 1,495,677,000 1,801,658,000

35 Chirundu Local Board 295,048,000 111,345,000 1,002,103,000 1,113,448,000 1,609,899,000 1,939,247,000

36 Norton Town Council 329,819,000 124,467,000 1,120,199,000 1,244,666,000 1,799,621,000 2,167,782,000

37 Kadoma City Council 331,151,800 124,969,000 1,124,725,000 1,249,694,000 1,806,893,000 2,176,542,000

38 Chegutu Municipality 275,318,600 103,899,000 935,093,000 1,038,992,000 1,502,246,000 1,809,570,000

39 Sanyati RDC 462,495,600 174,536,000 1,570,824,000 1,745,360,000 2,523,561,000 3,039,823,000

40 Hurungwe RDC 890,840,400 336,184,000 3,025,657,000 3,361,841,000 4,860,779,000 5,855,182,000

41 Mhondoro-Ngezi RDC 443,398,300 167,329,000 1,505,960,000 1,673,289,000 2,419,354,000 2,914,299,000

42 Makonde RDC 555,373,700 209,586,000 1,886,274,000 2,095,860,000 3,030,337,000 3,650,273,000

43 Zvimba RDC 750,384,000 283,179,000 2,548,608,000 2,831,787,000 4,094,390,000 4,932,008,000

44 Chegutu RDC 531,590,600 200,611,000 1,805,499,000 2,006,110,000 2,900,570,000 3,493,960,000

45 Nyaminyami RDC 364,576,200 137,583,000 1,238,247,000 1,375,830,000 1,989,269,000 2,396,228,000

124
ANNEXURE I: 2023 INTERGOVERNMENTAL FISCAL TRANSFERS
Indicative Estimates
2022 Estimates 2023 Estimates 2024 2025
Operational Capital Grant Total Grant Total Grant Total Grant
Ref Entity Grant (ZWL$) (ZWL$) (ZWL$) (ZWL$) (ZWL$)

Sub-total 6,060,477,700 2,287,095,000 20,583,843,000 22,870,938,000 33,068,356,000 39,833,379,000


MATABELELAND
NORTH PROVINCE
Victoria Falls
46 Municipality 225,250,000 85,004,000 765,040,000 850,044,000 1,229,052,000 1,480,488,000

47 Hwange Local Board 272,774,300 102,939,000 926,450,000 1,029,389,000 1,888,360,000 2,429,700,000

48 Lupane Local Board 317,653,700 119,876,000 1,078,882,000 1,198,758,000 1,733,246,000 2,087,827,000

49 Umguza RDC 441,074,000 166,452,000 1,498,065,000 1,664,517,000 2,406,671,000 2,899,020,000

50 Bubi RDC 414,809,300 156,540,000 1,408,862,000 1,565,402,000 2,263,364,000 2,726,397,000

51 Nkayi RDC 519,644,400 196,103,000 1,764,924,000 1,961,027,000 2,835,386,000 3,415,440,000

52 Tsholotsho RDC 510,772,700 192,754,000 1,734,790,000 1,927,544,000 2,786,976,000 3,357,127,000

53 Binga RDC 561,971,500 212,076,000 1,908,685,000 2,120,761,000 3,066,341,000 3,693,643,000

54 Kusile RDC 490,168,800 184,979,000 1,664,813,000 1,849,792,000 2,674,556,000 3,221,709,000

55 Hwange RDC 379,386,700 143,172,000 1,288,550,000 1,431,722,000 2,070,081,000 2,493,572,000

Sub-total 4,133,505,400 1,559,895,000 14,039,061,000 15,598,956,000 22,954,033,000 27,804,923,000


MATABELELAND
SOUTH PROVINCE
56 Gwanda Municipality 228,905,200 86,384,000 777,454,000 863,838,000 1,248,996,000 1,504,511,000
57 Plumtree Town Council 236,307,600 89,177,000 802,596,000 891,773,000 1,289,387,000 1,553,166,000
58 Beitbridge Municipality 304,239,800 114,813,000 1,033,321,000 1,148,134,000 1,660,050,000 1,999,659,000
59 Gwanda RDC 490,250,700 185,010,000 1,665,091,000 1,850,101,000 2,675,002,000 3,222,247,000
60 Matobo RDC 455,078,400 171,737,000 1,545,632,000 1,717,369,000 2,483,089,000 2,991,072,000
61 Umzingwane RDC 406,699,200 153,479,000 1,381,315,000 1,534,794,000 2,219,110,000 2,673,089,000
62 Beitbridge DC 415,667,000 156,864,000 1,411,774,000 1,568,638,000 2,268,043,000 2,732,033,000
63 Bulilima RDC 462,948,600 174,707,000 1,572,362,000 1,747,069,000 2,526,031,000 3,042,799,000
64 Mangwe RDC 408,787,900 154,268,000 1,388,408,000 1,542,676,000 2,230,506,000 2,686,816,000
65 Insiza RDC 465,728,400 175,756,000 1,581,803,000 1,757,559,000 2,541,198,000 3,061,069,000
Sub-total 3,874,612,800 1,462,195,000 13,159,756,000 14,621,951,000 21,141,412,000 25,466,461,000
MIDLANDS
PROVINCE
66 Gweru City Council 434,774,800 164,075,000 1,476,672,000 1,640,747,000 2,372,303,000 2,857,621,000
Zvishavane Town
67 Council 257,495,200 97,173,000 874,556,000 971,729,000 1,404,991,000 2,192,420,000
68 Kwekwe City Council 363,939,400 137,343,000 1,236,085,000 1,373,428,000 1,985,796,000 2,392,044,000
69 Shurugwi Town Council 273,767,600 103,314,000 929,825,000 1,033,139,000 1,493,782,000 1,799,376,000
70 Redcliff Municipality 249,138,400 94,019,000 846,173,000 940,192,000 1,359,393,000 1,637,493,000
71 Gokwe Town Council 282,948,900 106,779,000 961,010,000 1,067,789,000 1,543,881,000 1,859,724,000
72 Gokwe South RDC 863,905,700 326,019,000 2,934,175,000 3,260,194,000 4,713,810,000 5,678,148,000
73 Vungu RDC 454,930,300 171,681,000 1,545,127,000 1,716,808,000 2,482,278,000 2,990,094,000
74 Mberengwa RDC 618,999,200 233,597,000 2,102,372,000 2,335,969,000 3,377,503,000 4,068,463,000
75 Zibagwe RDC 561,667,600 211,961,000 1,907,652,000 2,119,613,000 3,064,681,000 3,691,644,000

76 Gokwe North RDC 721,056,500 272,111,000 2,449,000,000 2,721,111,000 3,934,368,000 4,739,249,000


77 Runde RDC 378,011,000 142,653,000 1,283,880,000 1,426,533,000 2,062,578,000 2,484,534,000

125
ANNEXURE I: 2023 INTERGOVERNMENTAL FISCAL TRANSFERS
Indicative Estimates
2022 Estimates 2023 Estimates 2024 2025
Operational Capital Grant Total Grant Total Grant Total Grant
Ref Entity Grant (ZWL$) (ZWL$) (ZWL$) (ZWL$) (ZWL$)
78 Tongogara RDC 408,888,400 154,306,000 1,388,750,000 1,543,056,000 2,231,054,000 2,687,477,000
79 Chirumanzu RDC 419,661,000 158,371,000 1,425,338,000 1,583,709,000 2,289,834,000 2,758,281,000

Sub-total 6,289,184,000 2,373,402,000 21,360,615,000 23,734,017,000 34,316,252,000 41,836,568,000


MASVINGO
PROVINCE
80 Masvingo City 338,828,400 127,866,000 1,150,797,000 1,278,663,000 1,848,779,000 2,226,997,000
81 Chiredzi Town Council 273,050,400 103,043,000 927,390,000 1,030,433,000 1,489,871,000 1,794,664,000
82 Bikita RDC 574,777,500 216,909,000 1,952,177,000 2,169,086,000 3,136,211,000 3,777,808,000
83 Gutu RDC 627,476,900 236,796,000 2,131,167,000 2,367,963,000 3,423,762,000 4,124,186,000
84 Zaka RDC 604,780,200 228,231,000 2,054,079,000 2,282,310,000 3,299,919,000 3,975,007,000
85 Mwenezi RDC 600,314,900 226,546,000 2,038,915,000 2,265,461,000 3,275,558,000 3,945,661,000
86 Chiredzi RDC 766,706,200 289,338,000 2,604,045,000 2,893,383,000 4,183,450,000 5,039,288,000
87 Masvingo RDC 618,615,300 233,452,000 2,101,068,000 2,334,520,000 3,375,408,000 4,065,939,000
88 Chivi RDC 571,742,000 215,763,000 1,941,868,000 2,157,631,000 3,119,650,000 3,757,859,000

Sub-total 4,976,291,800 1,877,944,000 16,901,506,000 18,779,450,000 27,152,608,000 32,707,409,000


HARARE
METROPOLITAN
PROVINCE
89 Harare City 2,952,386,800 1,114,186,000 10,027,675,000 11,141,861,000 16,109,660,000 19,405,326,000
Chitungwiza
90 Municipality 810,319,700 305,798,000 2,752,178,000 3,057,976,000 4,421,429,000 5,325,952,000
91 Ruwa Local Board 318,911,600 120,350,000 1,083,151,000 1,203,501,000 1,340,105,000 1,457,772,000
92 Epworth Local Board 518,336,100 195,609,000 1,760,481,000 1,956,090,000 2,828,249,000 3,406,843,000

Sub-total 4,599,954,200 1,735,943,000 15,623,485,000 17,359,428,000 24,699,443,000 29,595,893,000

D Total 46,625,095,900 17,595,324,000 158,357,938,000 175,953,262,000 254,405,196,000 306,450,641,000

E GRAND TOTAL 52,539,000,000 25,415,470,000 170,088,155,000 195,503,625,000 282,672,440,000 340,500,710,000

Annexure II: 2023 Irrigation Schemes Being Supported Through the Fiscus
NAME OF PROJECT PROVINCE DISTRICT 2023 ALLOCATION
(ZWL$)
Zhove irrigation (Kuwait Fund) Matebeleland South Beitbridge 300,000,000
Calsvale Matebeleland North Umguza 90,000,000
Bengura irrigation Masvingo Bikita 72,000,000
Maparu Velvekia irrigation Mashonaland Central Muzarabani Centenary 380,000,000
Masembura irrigation Mashonaland Central Bindura 120,000,000
Hiltop irrigation Matebeleland North Umguza 72,000,000
Mwenje irrigation Mashonaland Central Mazowe 120,000,000
Chinehasha irrigation Mashonaland Central Mazowe 144,000,000
Gwayi Shangani irrigation Matebeleland North Lupane Hwange 1,920,000,000
Marovanyati irrigation Manicaland Buhera 480,000,000
Manyuchi irrigation Masvingo Mwenezi 192,000,000
Mola irrigation Mashonaland West Kariba 96,000,000
Mopani irrigation Mashonaland West Sanyati 96,000,000
Bulawayo Kraal Matebeleland North Binga 720,000,000

126
NAME OF PROJECT PROVINCE DISTRICT 2023 ALLOCATION
(ZWL$)
Ruti Irrigation Manicaland Buhera 150,000,000
Nyabango irrigation Mashonaland West Chegutu 235,200,000
Gororo irrigation Masvingo Chivi 360,000,000
Riversdale irrigation Mashonaland West Chegutu 264,000,000
Temperly irrigation Mashonaland West Makonde 240,000,000
Smith Block irrigation Matebeland South Matobo 360,000,000
Mufusirwa irrigation Masvingo Bikita 144,000,000
Chilonga irrigation Masvingo Chiredzi 120,000,000
St Josephs irrigation Masvingo Chiredzi 60,000,000
Famona irrigation Matebeleland North Bubi 72,000,000
Maparo Irrigation Mashonaland Central Muzarabani 480,000,000
Makwe irrigation Matebeleland South Gwanda 72,000,000
Chemahororo irrigation Midlands Gokwe 52,800,000
Kachuta irrigation Mashonaland Central Guruve 150,000,000
Low Lands irrigation Masvingo Gutu 150,000,000
Mtshabezi irrigation Matebeleland South Gwanda 240,000,000
Mahute irrigation Mashonaland West Hurungwe 192,000,000
Bita irrigation Mashonaland East Hwedza 384,000,000
Mhakwe irrigation Mashonaland East Hwedza 60,000,000
Igogo Takawira irrigation Midlands Kwekwe 129,600,000
Musena Youth irrigation Midlands Mvuma 72,000,000
Bubi-Lupane irrigation Matebeleland North Lupane 332,000,000
Upper Lesapi irrigation Manicaland Makoni 312,000,000
Muzhwi irrigation Masvingo Masvingo 240,000,000
Bambanani irrigation Midlands Gweru 96,000,000
Bonchance irrigation Mashonaland East Marondera 288,000,000
Nyika irrigation Masvingo Bikita 57,600,000
Vuka irrigation Mashonaland Central Muzarabani 240,000,000
Nyambudzi irrigation Mashonaland Central Mbire 120,000,000
Milsonia irrigation Midlands Kwekwe 48,000,000
Gwingwizha irrigation Mashonaland Central Mazowe 72,000,000
Nyarumwe irrigation Mashonaland Central Mazowe 60,000,000
Chaora block irrigation Midlands Mberengwa 552,000,000
Kanyemba irrigation Mashonaland Central Mbire 538,800,000
Everton irrigation Mashonaland Central Mt Darwin 120,000,000
Sommerset irrigation Mashonaland East Marondera 96,000,000
Mpudzi irrigation Manicaland Mutare 96,000,000
Nyazvikatsi irrigation Mashonaland East Mutoko 72,000,000
Nyambiri irrigation Mashonaland East Seke 144,000,000
Chigara BBH irrigation Mashonaland East Seke 144,000,000
Nyanyadzi irrigation Manicaland Chimanimani 450,000,000
Nyaje irrigation Midlands Gokwe 24,000,000
Laverstork/Ena Vante irrigation Manicaland Mutare 624,600,000
Chikwezvero irrigation Mashonaland East Chikomba 84,000,000
Lapachi irrigation Masvingo Mwenezi 156,000,000
Muzvezve Village 13 irrigation Mashonaland West Ngezi 240,000,000
Chimhanda Extension irrigation Mashonaland Central Mt Darwin 120,000,000
Gowe irrigation Mashonaland West Sanyati 173,000,000
Seke Sanyati irrigation Mashonaland West Sanyati 144,000,000
Chipoli D irrigation Mashonaland Central Shamva 154,000,000
Nhema irrigation Masvingo Zaka 72,000,000

127
NAME OF PROJECT PROVINCE DISTRICT 2023 ALLOCATION
(ZWL$)
Mushaya irrigation Masvingo Zaka 84,000,000
Mabwematema irrigation Midlands Zvishavane 220,000,000
Mutema Taona irrigation Manicaland Chipinge 96,000,000
Mbuya Nehanda Irrigation Mashonaland West Ngezi 720,000,000
(Dorreen’s Pride) irrigation
Karoi irrigation Mashonaland Central Mbire 60,000,000
Biri Irrigation Midlands Mberengwa 282,998,704
Ndiyadzo irrigation Manicaland Chipinge 96,000,000
Lilstock irrigation Mashonaland Central Bindura 140,000,000
Save/Taziwa irrigation Manicaland Chimanimani 72,000,000
Muchekeranwa irrigation Mashonaland East Marondera 144,000,000
Dendere irrigation Masvingo Chiredzi 100,000,000
Katsvenzve irrigation Mashonaland West Zvimba 144,000,000
Morefields irrigation Mashonaland Central Bindura 126,000,000
Emojeni irrigation Mashonaland West Chegutu 120,000,000
Makoshe irrigation Matebeleland South Gwanda 24,000,000
Tugwi Mushandike irrigation Masvingo Masvingo 439,440,648
Portlet irrigation Mashonaland Central Makonde 100,000,000
Osborne irrigation Manicaland Mutate 200,000,000
Mambale irrigation Matebeleland South Matobo 135,000,000
Presidential Drip Irrigation 1,192,000,000
Systems

Muzarabani irrigation Mashonaland Central Muzarabani 480,000,000


Mutekedza irrigation Mashonaland East Chikomba 72,000,000
Ngondoma irrigation Midlands Kwekwe 72,000,000
Nyabvute irrigation Mashonaland Central Guruve 96,000,000
Shangani Sabelo irrigation Matebeland North Bubi 240,000,000
Murambinda irrigation Manicaland Buhera 400,000,000
Munjera irrigation Masvingo Gutu 200,000,000
Mbada irrigation Mashonaland Central Muzarabani 54,000,000
Smallholder Irrigation Revitalisa- National National 800,000,000
tion Programme (IFAD)
Operation and maintenance of National National 1,620,000,000
irrigation schemes
Pedstock Irrigation Equipment National National 1,056,000,000
Facility
Upgrading of Fels Demostration National National 20,000,000
Centre
Green Climate Fund Project(GCF, National National 1,291,680,000
UNDP )
Upgrading and rehabilitation of National National 5,000,000
irrigation demonstration plots
Offgrid Small Holder Farmer Led National National 100,000,000
Irrigation System
VIA(Vitual Irrigation Academy) National National 1,000,000
Technical performance evaluation National National 2,400,000
of irrigation schemes
Project Management & Capacity National National 2,000,000,000
building
Grand Total 27,665,119,352

128
Annexure III: 2023 Priority Infrastructure Projects by Province
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Bulawayo Bulawayo ZITF Exhibition Stand 200,000,000

Bulawayo Imbizo Housing Project 921,587,000

Bulawayo Mhlampapele Offices and fencing 50,000,000

Bulawayo ZIMRA region 2 Office Block 100,000,000

Zimbabwe School of Mines - Geomol-


Bulawayo 1,000,000,000
ogy

Bulawayo Other machinery and equipment 660,000,000

Bulawayo Mpilo Block of flats 1,980,000,000

Ingutsheni Central Hospital General


Bulawayo 132,000,000
refurbishment
Mpilo Central Hospital Laundry
Bulawayo 198,000,000
equipment
Mpilo Central Hospital General refur-
Bulawayo 132,000,000
bishment
United Bulawayo Hospital General
Bulawayo 132,000,000
rehabilitation(ceiling and plumbing)
Bulawayo Cowdray Park 1 ECD block 15,000,000
Bulawayo Cowdray Park 2 Primary 30,000,000
Textile technology and design block at
Bulawayo 20,000,000
Cowdry Park High

Bulawayo Mncumbata Secondary School 20,000,000

Bulawayo Pumula South Secondary School 20,000,000

Bulawayo Library -NUST 800,000,000

Bulawayo Students Service Centre - NUST 500,000,000

Bulawayo School of hospitality -Designs 150,000,000


Multipurpose sportsfield at Hillside
Bulawayo 60,000,000
Teachers’ College
bulawayo Old Bulawayo 100,000,000
Bulawayo Khami Houses - ZPCS 10,000,000

Bulawayo Cowdrey Park 100,000,000

Bulawayo ZEC - Provincial and district offices 75,000,000


Sub-Total 7,405,587,000
Harare Harare Mandara State Residences 913,923,000
Harare Norton District Office 140,000,000

129
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Harare Munhumutapa Building 3,077,572
African Regional Labour Administar-
Harare 218,000,000
tion Centre (ARLAC)
Harare Northcot Children’s Home 75,000,000

Harare Rehabilitation of Defence House 150,000,000

Harare Dzivarasekwa Houses -Defence 2,362,502,000


JM Tongogara Barracks WOS & Sgts
Harare 800,000,000
Mess
Costruction of 2 Medical Company
Harare 800,000,000
Referal Hospital - hre JMT

Harare VVIP Officers Mess (JMT ) 200,000,000

Construction on of ground house -


Harare 10,000,000
AFZ
Harare R31 Flats - AFZ 10,000,000

Harare AF 90 flats - AFZ 20,000,000

Harare Manyame Airbase Hospital 1,500,000,000


Installation of street lights at Manyame
Harare 4,000,000
Air Base
Harare Refurbshment of Messes 50,000,000

Harare Ngungunyana building 800,000,000

Harare Crop Breeding Institute 67,673,000

Harare Horticulture Research Center 34,310,000

Chitungwiza Chitungwiza Road 2,200,000,000

Harare Mbudzi Traffic Interchange 13,000,000,000

Harare Harare - Airport Road (Missing Link)


1,250,000,000

Harare Harare Harare - Kanyemba


5,000,000,000
National Transport Management
Harare
Center 200,000,000

Harare Chitungwiza VID Depot


1,000,000,000
Air Trafic Control Communications
Harare
System 3,100,000,000

Harare Harare City Council


1,500,000,000

130
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
National Pharmacetical Company
Harare
Storage facilities 264,064,000
Chitungwiza Central Hospital Reha-
Chitungwiza
bilitation 15,882,000,000
Sally Mugabe Central Hospital Ren-
Harare ovation of adult hospital, wards and
528,000,000
kitchens
Sally Mugabe Central HospitalMaterni-
Harare ty theatre extension
660,000,000

Sally Mugabe Central Hospital Mortu-


Harare
ary building construction 33,000,000

Harare Parirenyatwa General refurbishment


132,000,000

Harare Ambassador House


800,000,000

Harare Education Service Centre Hostel


400,000,000

Harare Refurbishment of CDTS Centre


220,000,000
ECD Center at St Mary’s Early Learn-
Chitungwiza
ing Center 20,000,000

Chitungwiza Lonely mine classroom


22,000,000

Harare Nyaradza ECD block


20,000,000

Chitungwiza St Marys Infant ECD block


20,000,000

Harare Budiriro 6 Primary


20,000,000

Harare Educational Centre


500,000,000

Harare Educational Centre


200,000,000

Harare Students Affairs Building


200,000,000

Harare Halls of residence - UZ


200,000,000
Zimbabwe Open University’ National
Harare Centre - Administration, Teaching &
100,000,000
Learning Block at

Harare Multipurpose Hall - ZOU


100,000,000

131
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Student hostel at Msasa Industrial
Harare
Training College 100,000,000
Rehabilitation of infrastructure at Bel-
Harare
vedere Teachers College (On-going) 50,000,000

Harare Belvedere Library


50,000,000
Rehabilitation of infrastructure at Man-
Harare
agement Training Bureau 50,000,000

Harare Bulawayo Polytechnic


100,000,000

Harare Harare Polytechnic


50,000,000

Harare Waterfalls Incubation Centre


150,000,000

Harare High Performance Infrastructure


80,000,000

Harare Tugwi Murkosi Research Center


1,500,000,000
Centre for Innovation Research and
Harare
Development 100,000,000
Centre for excellence dryland agricul-
Harare
ture 60,000,000

harare PPU HQ - Penrose


93,996,000

Harare Chikurubi Houses - ZPCS


80,000,000

Harare Agricultural Show Stand - ZPCS


50,000,000

Harare Munhumutapa Offices


73,000,000

Harare Design Centre


200,000,000

Harare National Sports Stadium


811,900,000

Harare Dzivarasekwa flats


1,185,020,218

Harare Southlea Park


100,000,000

Harare Caledonia
100,000,000

Harare Hatcliff
100,000,000

Harare Rehabilitation of buildings


223,920,000

132
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Harare Harare Civil Court


101,000,000

Harare JTIZ Training and Conferencing centre


40,000,000
Construction of Mabvuku Magistrate
Harare Harare
Court 40,000,000

Harare ZEC - Provincial and district offices


475,860,000

Sub-Total
- - 61,694,245,790

Manicaland Chimanimani Chimananimani District Office


168,000,000

Rusape Rusape Residential Accommodation


210,000,000

Mutare Lowden Lodge


20,000,000

Chipinge Construction of 33 RF Battalion


200,000,000

Mutare Rural Forbes Border Staff Accommodation


100,000,000
Forbes Trucks Park and Redeployable
Mutare Rural
Office 50,000,000
Mutare Customs House Refurbish-
Mutare
ment 50,000,000

Chipinge Coffee Research Institute


236,469,000

Nyanga Nyanga experiment Station


138,169,000

Chiredzi Rural Chisumbanje Experiment Station


45,719,000

Save Research Institute


- 171,399,000
Chimanimani District Offices (Animal
Chimanimani
Extn Services) 110,000,000

Nyanga Nyanga Water Supply


19,924,647

Mutasa Hauna Water Supply


54,792,778

Buhera Murambinda Water Supply


24,905,809

Buhera Marovanyati irrigation


480,000,000

Buhera Ruti irrigation


150,000,000

133
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Makoni Upper Lesapi irrigation


312,000,000

Mutare Mpudzi irrigation


96,000,000

Chimanimani Nyanyadzi irrigation


450,000,000

Mutasa Laverstork/Ena Vante irrigation


624,600,000

Chipinge Mutema Taona irrigation


96,000,000

Buhera Murambinda-Birchenough
1,800,000,000

Nyanga Nyanga - Ruwangwe


750,000,000

Makoni Vengere Loop


530,000,000

Chipinge Eastern Boarder Road


419,100,000

Mutare Odzi-Marange-Msasa
720,000,000
Manicaland-Mas-
Masvingo - Mutare Road
vingo 1,100,000,000
Victoria Chitepo Provincial Hospital
Mutare
Theatre and Wards 66,000,000

Buhera Buhera District Hospital upgrading


66,000,000
Rehabilitation of Rural hospitals-(Odzi,
Mutare Rural 66,000,000
Darewndale,)

Makoni Magamba Primary


30,000,000

Chimanimani Demene primary


20,000,000

Nyanga Nyangani 2 Secondary School


20,000,000

Makonde Ruvimbo Secondary


15,000,000

Mutare MSUAS -Student Admissions


20,000,000

Mutare Equipment
20,000,000
Manicaland State University of
Mutare Applied Sciences (MSUAS) - Student
260,000,000
Residence

134
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Female Hostel at Marymount
Mutare
Teachers’ College 100,000,000
Rehabilitation of infrastructure at
Mutare Urban
Mutare Teachers’ College (On-going) 50,000,000
Rehabilitation of infrastructure at
Mutare Urban
United College of Education (On-going) 50,000,000
Baobab Project at Mutare Teacher’s
Mutare Urban
College 50,000,000
B Tech Block at Mutare Polytechnic
Mutare
(On-going) 100,000,000

Makoni Golden Vile


20,000,000

Rusape Rusape Houses - ZPCS


10,000,000

Chipinge Chipinge Houses - ZPCS


10,000,000

Manicaland Rusape Little Kraal Houses - ZPCS


10,000,000

Mutare Mutare Houses - ZPCS


10,000,000
Chimanimani Rural District Council
Chimanimani
Flats 250,000,000

Mutare Gimboki
100,000,000

Sub-Total
10,470,079,234
Mashonal-
Mazowe Mazowe Training School
and Central 3,350,000,000
Kanyemba Special Service District
Mbire
Office 161,000,000
Kanyemba Special Service District
Mbire
Office 56,000,000

Muzarabani Msingwa Bridge


200,000,000

Shamva Construction of Institutional Building


400,000,000

Shamva Shamva Irrigation development


50,000,000
Agronomy Research Institute-
Mazowe
Panmure 174,124,000

Mazowe Henderson Research Institution


107,000,000
Shamva District Extension Services
Shamva
Office 150,000,000

135
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Marondera Provincial offices (Animal
Marondera
Extn Services) 109,005,000

Mbire Mushumbi staff house (Tsetse control)


114,805,000

Rushinga Semwa Dam


2,897,731,152

Bindura Bindura Dam


400,000,000

Guruve Dande Dam


600,000,000

Centenary Mbada (Silverstroom) Dam


600,000,000

Bindura Masembura irrigation


120,000,000

Mazowe Mwenje irrigation


120,000,000

Mt Darwin Chinehasha irrigation


144,000,000

Bindura Maparo irrigation


480,000,000

Guruve Kachuta irrigation


150,000,000

Muzarabani Vuka irrigation


240,000,000

Mbire Nyambudzi irrigation


120,000,000

Mazowe Gwingwizha irrigation


72,000,000

Mazowe Nyarumwe irrigation


60,000,000

Mbire Kanyemba irrigation


538,800,000

Mt Darwin Everton irrigation


120,000,000

Rushinga Chimhanda Extension irrigation


120,000,000

Shamva Chipoli D irrigation


154,000,000

Bindura Morefields irrigation


226,000,000
Rehabilitation of Met Building at
Mt Darwin
Airpports and Met Stations 250,000,000

Muzarabani Ruya Junction - Mukumbura Road


3,000,000,000

136
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Bindura Provincial Hospital Theatre
Bindura
and Wards 528,000,000

Bindura Chiwaridzo Secondary School


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

Bindura Furniture and equipment


20,000,000

mazowe Dambatsoko Community Centre


30,000,000

bindura Bindura SME Market


150,000,000

Manicaland Pfura Dotito police station


50,000,000

Guruve Guruve Houses - ZPCS


5,000,000

Mazowe Mazowe Houses - ZPCS


10,000,000
ICT Security Operations Centre
Mbire
Established 231,000,000

Mbire PSC Training centres connected


175,000,000
ICT enabled Provincial & District
Mbire Disaster Management Centres Estab-
358,000,000
lished

Mbire Smart Solutions


1,310,000,000

Mbire Government intranets project


350,000,000

137
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Bindura Bindura Rural District Council Flats


250,000,000
Constrution of Bindura offices (5
Bindura
roomed) 50,000,000

Sub-Total
18,981,465,152
Mashonal-
Mutoko Nyamuzizi Bridge
and East 200,000,000
Beatrice National Rehabilitation
Beatrice
Centre 115,000,000

Marondera Grasslands Research Institution


175,000,000
Goromonzi/Domboshava Apiculture
Goromonzi
centre 100,000,000
Goromonzi District Extension Services
Goromonzi
Office 100,000,000

Murehwa Kunzvi Musami


2,097,731,152

Goromonzi Goromonzi Water Supply


174,340,660

Goromonzi Parirewa Water Supply


99,623,234

Manyame Dema Water Supply


74,717,426

Hweza Bita irrigation


384,000,000

Hweza Mhakwe irrigation


60,000,000

Marondera Bonchance irrigation


288,000,000

Murewa Sommerset irrigation


96,000,000

Mutoko Nyazvikatsi irrigation


72,000,000

Seke Nyambiri irrigation


144,000,000

Chikomba Chigara BBH irrigation


144,000,000

Chikomba Chikwezvero irrigation


84,000,000
Upgrading of Fels Demostration
Hwedza
Centre 20,000,000

138
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Uzumba Murehwa - Mutawatawa -Mandicheche


1,150,000,000

Hwedza Mushandirapamwe - Wedza


3,500,000,000

Nyamapanda Rwenya bridge


1,800,000,000

Goromonzi Melfort Bridge


500,000,000

Manyame Manyame RDC


550,000,000

Mutoko Mutoko Composite Office


2,740,000,000

Hwedza Hwedza Composite Office


160,000,000
Marondera Provincial Hospital Thea-
Marondera
tre and Wards 66,000,000

Hwedza Mathambo Primary


30,000,000

Hwedza Wedza Primary


30,000,000

UMP Machekera Secondary School


20,000,000

Marondera Office block


150,000,000

chikomba Chikomba
210,000,000

goromonzi goromonzi district registry


750,000,000

murewa Murewa district registry


770,000,000

Mutoko Mutoko Houses - ZPCS


10,000,000

Marondera Marondera Houses - ZPCS


10,000,000

Marondera Ridigita Houses - ZPCS


5,000,000

Marondera Marondera flats


1,755,000,000
Uzumba- Maram-
Mutawatawa Housing Project
ba-Pfungwe 250,000,000
Mashonal- Construction of Mutawatawa Magis-
Mutawatawa
and East trate Court 100,000,000

Sub-Total
18,984,412,472

139
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Mashonal-
Chinhoyi Chinhoyi
and West 189,000,000

Hurungwe Piriwiri Bridge


200,000,000
Zimbabwe Institute of Public Adminis-
Zvimba
trators (ZIPAM) 473,000,000

Kadoma Kadoma Training Institute


80,000,000

Chegutu Officer’s Mess


75,000,000

Chegutu Water Pump Station


5,000,000

Chirundu Chirundu taff houses


2,300,000,000

Kariba Makuti office


100,000,000

Kadoma Cotton Research


157,366,000

Kariba Siakobvu staff house (Tsetse control)


90,000,000

Zvimba Nyabira Water Supply


547,927,789

Makonde Mhangura Water Supply


79,698,588

Makonde Hiltop irrigation


72,000,000

Kariba Mola irrigation


96,000,000

Sanyati Mopani irrigation


96,000,000

Chegutu Nyabango irrigation


235,200,000

Chegutu Riversdale irrigation


264,000,000

Makonde Temperly irrigation


240,000,000

Kadoma Muzvezve Village 13 irrigation


240,000,000

Sanyati Gowe irrigation


173,000,000

Sanyati Seke Sanyati irrigation


144,000,000

Zvimba Katsvenzve
144,000,000

140
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Emojeni
- 120,000,000

Central Laboratory Refurbishment


- 1,000,000,000

Makonde Alaska - Copper Queen


1,500,000,000

Sanyati Golden Valley Sanyati


1,500,000,000
Kadoma - Chakari-Sanyati-Nembudzi-
Sanyati
ya 800,000,000

Kwekwe Munyati Bridge


800,000,000

Chegutu Serui River Bridge


500,000,000

Zvimba New Parliament Building


1,500,000,000

Siakobvu Siakobvu Composite Office


345,000,000
Chinhoyi Provincial Hospital Theatre
Chinhoyi
and Wards 66,000,000

Kariba Kauzhumba Primary


30,000,000

Kariba Mayovhe Secondary School


20,000,000

Makonde Bosbery Secondary School


15,000,000
Chinhoyi University of Technology
Makonde - Engineering workshops Phase 1
100,000,000
(On-going)
Rehabilitation of infrastructure at
Shamva
Madziwa Teachers’ College 50,000,000

Hurungwe Hurungwe Morden Prison


150,000,000

Hurungwe Hurungwe Houses - ZPCS


10,000,000

Chinhoyi Chinhoyi Houses - ZPCS


10,000,000

Karoi Karoi Houses - ZPCS


10,000,000

Chinhoyi Crowlands
1,000,000,000

Chinhoyi Construction of offices - JSC


132,000,000

141
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Construction of Chegutu Magistrate
Chegutu
Court 40,000,000

Sub-Total
15,699,192,377

Masvingo Gutu Gutu Special Service District Offices


84,000,000

Chiredzi Chiredzi redeployable office


50,000,000

Chiredzi Chiredzi Research Institute


27,589,000

Masvingo Makoholi Research Institution


98,514,000
Rupangwana District Extension Train-
Chiredzi
ing Centre 220,000,000
Foot and Mouth Disease Control
Chiredzi
Fence-Gonarezhou 514,176,000

Mwenezi Jerera Water Supply


49,811,617

Bikita Bengura irrigation


72,000,000

Mwenezi Manyuchi irrigation


192,000,000

Chivi Gororo irrigation


360,000,000

Bikita Mufusirwa irrigation


144,000,000

Chiredzi Chilonga irrigation


120,000,000

Chiredzi St Joseph irrigation


60,000,000

Gutu Low Lands irrigation


150,000,000

Bikita Mahute irrigation


192,000,000

Chivi Muzhwi irrigation


240,000,000

Masvingo Nyika irrigation


57,600,000

Zaka Nhema irrigation


72,000,000

Zaka Mushaya irrigation


84,000,000

Chiiredzi Dendere
100,000,000

142
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Tugwi mashandike
- 639,440,648

Gutu/Chiredzi Chivhu Gutu Chiredzi


3,000,000,000

Masvingo Chilonga Bridge


2,000,000,000

Masvingo Forbes VID


520,000,000

Masvingo Tugwi Murkosi Tower


100,000,000
Masvingo Provincial Hospital Theatre
Masvingo
and Wards 184,800,000

Chiredzi Melborne 2 Primary


30,000,000

Chiredzi Mathambo Secondary School


25,000,000

Chiredzi Muleme Secondary


10,000,000

Masvingo Teaching Hospital


100,000,000

Chivi Chivi Industrial Centre


200,000,000
Tugwi Murkosi Masterplan develop-
Chivi
ment 100,000,000

bikita Duma Community Centre


20,000,000
Masvingo Records Centre - rehabilita-
Masvingo
tion and upgrading 500,000,000

Masvingo Sango Border Post Electrification


20,000,000

Chiredzi Chiredzi Houses - ZPCS


15,000,000

Masvingo Masvingo houses - ZPCS


15,000,000

Masvingo Mutimurefu Houses - ZPCS


10,000,000

Masvingo Nemamwa Phase 2


250,000,000
Construction of Chiredzi Magistrate
Chiredzi
Court 150,000,000

Sub-Total Matabeleland North


10,776,931,265
Matabele-
Nkayi Nkayi Special Service District Offices
land North -

143
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Victoria Falls Special Service District
Victoria Falls
Offices 490,000,000

Victoria Falls Pandamatenga offices


189,000,000

Bubi Upper Mbembesi Bridge


200,000,000

Victoria Falls Victoria Falls border upgrading


50,000,000
Binga District Offices (Animal Extn
Binga
Services) 130,000,000
Nkayi District Offices (Animal Extn
Nkayi
Services) 140,000,000
Matabele-
Hwange Gwayi-Tshangani Dam
land North 4,297,731,152

Hwange Gwayi-Tshangani Pipeline


2,797,731,152

Nkayi Ziminya Dam


1,123,242,576

Hwange Vhungu Dam


1,497,731,152

Bubi Inyati Water Supply


24,905,809

Umguza Calssvale irrigation


90,000,000

Gwayi Gwayi Shangani irrigation


1,920,000,000

Bubi Famona irrigation


72,000,000

Lupane Bubi-Lupane irrigation


332,000,000

Nkayi Bulawayo - Nkayi


1,500,000,000

Tsholotsho Bulawayo - Tsholotsho


1,500,000,000

Nkayi Nkayi-Lupane Shelverts


800,000,000

Victoria Falls Tokwe Murkosi houses


100,000,000

Victoria Falls Tokwe Murkosi harbor


100,000,000

Victoria Falls Victoria Falls Control Tower


100,000,000
Binga Offices and Staff Accommoda-
Binga
tion 145,000,000

144
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Lupane Lupane Composite Office Phase 2


1,755,000,000
Lupane Provincial Hospital construc-
Lupane
tion 3,465,000,000
Tsholotsho Nursing Training School
Tsholotsho
construction 66,000,000

Hwange Chamabondo ECD block


10,000,000

Tsholotsho Tshino Secondary School


25,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000
Faculty of Humanities (On-going) -
Lupane
LSU 800,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


2,550,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

145
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000
Matabele-
Lupane Innovation Fund
land North 10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Industrial Park


50,000,000

Lupane Innovation Hub


80,000,000

Lupane Innovation Fund


10,000,000

Lupane Innovation Hub


80,000,000
Lecture blocks at Hwange Campus
Hwange College Satellite to United College of
100,000,000
Education
Hwange Teachers’ College Admin
Hwange
Block 150,000,000

146
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Binga Binga Industrial Centre


200,000,000

gwanda Gwanda Workspace


150,000,000
kazungula border station (2 bachelor
vic falls
flats) 32,000,000

vic falls victoria falls (3 bachelor flats)


240,000,000

binga Binga Border Post House Electricity


40,000,000

Hwange Hwange 7 & 8 Expansion


414,970,310,000

Hwange Deka Pump Station


25,037,010,000

Hwange Hwange - Empumalanga


1,366,000,000

Binga Binga Houses


90,563,412

Lupane Lupane Civil Servants Houses


149,280,000

Sub-Total
470,375,505,252
Matabele-
Gwanda Esigodini District Office
land South 189,000,000

Matobo Simukwe Bridge


1,085,333,000

Beitbridge Migration Centre


80,000,000

Plumtree Plumtree Reception Centre


50,000,000
Construction of 13 Infantry Battalion
Gwanda
Barraks 200,000,000

Beitbridge Beitbridge blue Flat


100,000,000

Plumtree Staff Acccomodation Maitengwe


50,000,000

Matobo Matopos Research Institution


360,000,000

Beitbridge Beitbridge staff accomodation


100,000,000

Gwanda Tuli-Manyange Dam


1,797,731,152

Gwanda Collen Bawn Water Supply


149,434,852

147
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Insiza Filabusi Water Supply


44,830,455

Beitbridge Zhove irrigation


300,000,000

Mangwe Smith Block irrigation


360,000,000

Gwanda Mtshabezi irrigation


240,000,000

Makoshe
- 24,000,000

Mambale
- 135,000,000

Gwanda Gwanda - Maphisa


1,300,000,000

Matopo Bulawayo-Khami
2,000,000,000

Bulilima Plumtree-Madlambuzi
1,300,000,000

Mangwe Plumtree - Mphoengs


1,300,000,000
Harare-Makuti-Chirundu (Maronga)
Beitbridge
Road section 200,000,000
Beitbridge and Kazungula Border
Beitbridge
Posts Modernisation 1,000,000,000

Beitbridge Beitbridge VID Depot


1,000,000,000
Gwanda Provincial Hospital Theatre
Gwanda
and Wards 264,000,000

Insiza Filabusi Hospital upgrading


52,800,000

Kezi Kezi Rural Health Centre


66,000,000

Umzingwane Ntabende Primary ECD block


25,000,000
Matabele-
Bulilima Gonde Primary School
land South 30,000,000

Matobo St Anna Secondary School


20,000,000

Gwanda Spitzkop North Secondary School


30,000,000

148
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
Gwanda State University - Rehabilita-
Insiza
tion of infrastructure (On-going) 100,000,000

Insiza Lecture Block - GSU


150,000,000
Home Economics block at J.M. Nkomo
Gwanda
Polytechnic (On-going) 60,000,000
Lecture Theatre at J.M. Nkomo Poly-
Gwanda
technic (On-going) 100,000,000

gwanda Matebeleland South Craft Centre


20,000,000

insiza insiza district registry


100,000,000
Mulampapele Border Post
gwanda
Electrification 28,000,000

Gwanda Gwanda Morden Prison


150,000,000

Beitbridge Beitbridge Houses - ZPCS


15,000,000

Plumtree Plumtree Houses - ZPCS


25,000,000

Gwanda Gwanda houses - ZPCS


10,000,000

Gwanda Ntabazinduna Armoury - ZPCS


110,000,000

Gwanda Ntabazinduna Parade Square - ZPCS


10,000,000

Gwanda Staff College Harare - ZPCS


40,000,000

Gwanda Anju Farm Houses - ZPCS


25,000,000
Marondera Female Open Prison -
Gwanda
ZPCS 40,000,000

Beitbridge Beitbridge Civil Servants’ Housing


1,000,000,000

Gwanda Gwanda Rural District Council Flats


250,000,000
Lupane Sanitization of housing
Lupane
scheme 948,011,365
Gwanda Sanitization of housing
Gwanda
scheme 751,000,000

Gwanda Gwanda Magistrates Court


4,300,000,000

Bulililamangwe Plumtree Polytechnic


200,000,000

149
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Sub-Total
22,285,140,824

Midlands Mberengwa Murongwe Bridge


200,000,000

Gweru Procurement Lingerfield Accademy


10,000,000

Gweru Base HQ and ATC Tower


10,000,000

Gweru Guardroom at Thornhill Air Base


10,000,000

Mberengwa Mberengwa Water Supply


134,491,366

Gokwe South Chemahororo irrigation


52,800,000

Kwekwe Igogo Takawira irrigation


129,600,000

Kwekwe Milsonia irrigation


48,000,000

Mberengwa Chaora block irrigation


552,000,000

Gokwe South Nyaje irrigation


24,000,000

Zvishavane Mabwematema irrigation


220,000,000

Mberengwa Mberengwa - Mataga


800,000,000

Gweru Gweru-Lower Gweru


1,500,000,000

Gokwe North Kaonga Shelvert


1,500,000,000
Mberengwa District Hospital Upgrad-
Mberengwa
ing 66,000,000

Zvishavane Zvishavane District Hospital upgrading


52,800,000

Gweru Mathonisa Primary ECD block


15,000,000

Gweru Takunda Primary


30,000,000

Kwekwe Mbizo 3 Secondary School


15,000,000

Gokwe South Mapfungautsi Secondary School


10,000,000

Gweru Pathology Laboratory - MSU


500,000,000

150
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

Gweru Construction of faculty of law - MSU


500,000,000
Midlands State University -Halls of
Gweru
Residences (Stalled project) 300,000,000
Science Centre at Mkoba Teachers’
Midlands Gweru
College (Ongoing) 50,000,000
Fabrication Workshop at Gweru
Gweru
Polytechnic 50,000,000
Classroom block at Kwekwe Polytech-
Kwekwe
nic (Stalled project) 50,000,000

Vungu Maboleni
20,000,000

Mberengwa Mberengwa Houses - ZPCS


10,000,000

Kwekwe Kwekwe Houses - ZPCS


15,000,000

Gokwe Gokwe Houses - ZPCS


20,000,000

Gweru Whawha Houses - ZPCS


15,000,000

Gweru Senga Messanger’s Camp


1,450,000,000

Kwekwe Kwekwe Civil Court


100,000,000

Sub-Total
8,459,691,366

National National Small earth dams


250,000,000

National Small scale irrigation schemes


250,000,000
Construction of Constituency
National
Information Centres 100,000,000
Enehenced Maintenance and
National
upgrading of ZNA Institutional Buildings 2,205,052,000
Rehabilitation and upgrading of
National
institutional buildings 920,000,000
Construction of F14 houses (Crops &
National
Livestock R&D) 246,478,000

National Dip tanks


590,000,000
Smallholder Irrigation Revitalisation
National
Programme (IFAD) 12,568,866,000
Operation and maintenance of
National
irrigation schemes 1,620,000,000

151
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$

National Pedstock Irrigation Equipment Facility


1,056,000,000
Upgrading and rehabilitation of
National
irrigation demonstration plots 5,000,000
Offgrid Small Holder Farmer led
National
Irrigation Systems 100,000,000

National VIA(Vitual Irrigation Academy)


1,000,000
Technical performance evaluation of
National
irrigation schemes 2,400,000

National Harare - Masvingo - Beitbridge Road


43,000,000,000

National Road Construction equipment


1,500,000,000

National Furniture and Equipment


200,000,000
Planning, Training, Research & Devel-
- opment (Zimchem) 1,500,000,000
Airport Infrastructure Maintenance
National
(AIDE) 10,824,000,000
Refubishment of office building
National (Including Isolation Centres as from
3,700,000,000
June )

National Rehabilitation of Lifts


300,000,000

National Procurement of Government buildings


1,800,000,000
Medical Equipment Maintenance
National
Workshops 92,400,000

National Provincial Hospital Medical Equipment


660,000,000
General Rehabilitation of District
National
Hospitals 33,000,000

National Kitchens upgrading


66,000,000
Laundry equipment for district
National
hospitals 460,350,000

National Staff canteens


528,000,000
Waste management facilities
National
(incinerators) 66,000,000

National Mortuaries
330,000,000

152
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
General Rehabilitation of Mission
Hospitals (St michaels, Zhombe, All
National
Souls,Tshelanyemba, Rusitu, St Lukes, 33,000,000
Mogenster,Marymount )

National Security fencing


660,000,000

National New Clinics


7,563,214,000

National Health Posts


980,000,000
Second Education Project-
National
Construction of schools 600,000,000
Second Education Project -Drilling of
National
boreholes 200,000,000
Second Education Project-
National
Rehabilitation 200,000,000
Second Education Project - Provision
National National
of mobile science laboratories 200,000,000
Construction of 40 21st Century New
National
Schools 18,000,000
Rehabilitation of other Government
National
schools 300,000,000

Nationwide Woodlands Primary


20,000,000

National Second Education Project


650,000,000
Rehabilitation of other government
National
schools 115,000,000

National Zimbabwe Space Agency Projects


250,000,000

National Rehabilitation of office buildings


90,000,000
ZPCS - Purchase of residential
National
accomodation 400,000,000

National Solar systems - ZPCS


145,000,000

National Mutare farm - ZPCS


45,000,000
ZPCS - Borehole drilling and rehabili-
National
tation - ZPCS 90,000,000

National Gas project - ZPCS


30,000,000
Rehabilitaion and upgrading of prisons
National
- ZPCS 430,000,000

153
2023 TOTAL
PROVINCE DISTRICT PROJECT NAME RESOURCES
ZWL$
ZPCS - Computerisation project -
National
ZPCS 150,000,000

National Generators - ZPCS


145,000,000

National Broadcasting Authority of Zimbabwe


1,500,000,000
Rehabilitation of Youth Interact Cen-
National
tres 338,500,000
Multipurpose sport and recreation
National
facilities (40) 100,000,000

National Biogas
1,000,000,000

National Transport equipment


88,000,000

National Maintenance of National Systems


1,688,000,000
Establishment of Community
National
Information Centres (CICs) 175,000,000
Computerisation of Schools- ICT Lab
National 1,455,000,000
Per School

National PFMS Kiosk 175,000,000

National Last mile connectivity to MDAs 290,000,000

National Rural Flushable Toilets 340,599,999

Rehabilitation and upgrading of court


National 200,000,000
facilities
Rehabilitation and upgrading of court
National 67,000,000
facilities
E Justice System (Intergarated
National Electronic Case Management System 500,000,000
(IECMS))

National PSC Training Centres Guardrooms 1,545,521,000

National Construction of Office Blocks 120,000,000

Sub-Total 107,871,380,999

Grand Total 753,003,631,732