Manual High Pressure Water Mist System

Water Mist

Uploaded by

Ngô Duy Vũ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

High Pressure Water Mist System

Technical Documentation

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 1
High Pressure Water Mist System

1. Overview

1.1 Brief Introduction to the Equipment


The high-pressure water mist extinguishing equipment, which uses water as the medium, and special nozzle to
decompose the water flow into drop under a specific pressure (usually 10MPa) for fire extinguishing, is economic and
widely used. Now it has become one of the important technologies to replace gas extinguishing and other extinguishing
equipment, and has a wide application prospect.

Water mist refers to the drop with a diameter Dv0.50 less than 200 pm and Dv0.99 less than 400 μm that are ejected
through the nozzle and formed in a plane 1 m downward the nozzle axis at the minimum design working pressure.

The diameter of the drop is small, so the surface area increases sharply compared with the same volume of water,
which improves the heat exchange efficiency and cooling effect. Meanwhile, the water mist vaporizes rapidly in the fire
scene, the volume expands rapidly, absorbing a large amount of heat, which can quickly cool the combustion surface,
surrounds and covers the combustion area as water vapor after vaporization, so as to extinguish the fire due to oxygen
deficiency. In addition, the water mist has a superior effect of blocking the transfer of heat radiation.

1.2 Performance Characteristics


The main characteristics of the unit are as follows:
1) It is environment-friendly and ideal for environmental protection;
2) Good electrical insulation performance, which can put out the fire of live equipment;
3) Less water consumption for fire extinguishing and less water stain residue;
4) It can greatly reduce the smoke content and toxicity in fire, which is conducive to safe evacuation;
5) Good extinguishing performance and wide application;
6) Water can easily used and is cheap as a fire extinguishing agent;

1.3 Application site


The unit is mainly applicable to:
1) Fires on the combustible solid surface in archives, libraries, archives databases, museums, cultural relics museums
and ancient buildings, etc.;
2) Fires of combustible liquid in hydraulic station, oil-immersed power transformer room, lubricating oil station and
warehouse, turbine oil warehouse, turbine room, diesel generator room, fuel oil boiler room, paint spraying and
baking production line, fuel oil boiler room, fuel oil direct-fired machine room, liquor and alcohol warehouse, oil switch
cabinet room and other places;
3) Fires of electrical equipment in power transformation and distribution room, generator room, computer room, data
center room, communication room, central control room, large cable room, cable tunnel (gallery), cable interlayer,
cable shaft and other places;
4) Fires of engine test room, tobacco warehouse, subway station hall, tunnel, airport terminal, hospital parking lot,
underground space and large-space warehouse, etc.;
5) Cooling of some chemical facilities and temperature and dust control in environmental protection.

This equipment is not suitable for extinguishing the following fires:


1) Deep fire of combustible solids;
2) Fire of active metals and their compounds that can react violently with water or produce a large amount of harmful
substances;
3) Combustible gas fire.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 1
High Pressure Water Mist System

2. Equipment Composition and Working Principle

2.1 Composition
The high-pressure water mist extinguishing equipment (open type) is mainly composed of high-pressure pump supplied,
relay water tank, pump supplied control cabinet, stabilized pressure pump supplied, open section valve, open water mist
nozzle and other components and high-pressure water supply pipes, which can automatically and manually start and
spray water mist for fire extinguishing or fire control.

2.2 Working Principle


Under the condition of standing by, a certain pressure (between 0.8MPa and 1.2MPa) is maintained in the pipeline
between the header pipe and the section valve, which can be started through the linkage startup of the fire alarm
controller and its own pressure stabilization function.

Pressure stabilization function startup: When the section valve is started, the pipeline pressure drops, and when it is
lower than 0.8MPa, the stabilized pressure pump starts, when it runs for more than 10S and the pressure in the pipeline
is still under 0.8MPa, the high-pressure pump supplied starts, and the stabilized pressure pump stops, then the
high-pressure water is sprayed through the water mist nozzle to extinguish the fire.

The working principle diagram of the equipment is as follows:

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 2
High Pressure Water Mist System

2.3 Control Mode


Fire extinguishing equipment has three control modes: automatic start, manual start and mechanical emergency start.

2.3.1 Automatic Start


When the fire alarm controller is placed in the "automatic" position, the extinguishing equipment is in the automatic
state.

In this state, the fire detector detects fire in the enclosure and sends an alarm signal to the fire alarm controller, which
confirms the enclosure suffering fire according to the address of the fire detector and sends a linkage signal to start the
section valve of the corresponding enclosure (according to the situation, a delay of 0 to 30s can be set). After the
section valve is fully opened, the feedback valve opening signal is sent to the fire alarm controller, which will then send
a linkage signal to the pump supplied control cabinet. The cabinet starts the high-pressure pump supplied according to
the prefabricated procedure, and the high-pressure pump supplied delivers high-pressure water to the nozzle to spray
water mist for fire extinguishing. At the same time, the pressure switch in the section valve detects the rise of water
pressure in the pipeline and sends a feedback signal to the fire alarm controller. After receiving the feedback signal, the
fire alarm controller sends a linkage signal to light up the spray indicator.

2.3.2 Manual Start


When the fire alarm controller is in placed the "manual" position, the extinguishing equipment is in the manual state.

Start mode I:
After a fire is found, the fire alarm controller can be manually operated, and the section valve and the pump supplied
control cabinet can be started respectively to spray water mist for fire extinguishing.
Start mode II:
After a fire is found, press the start button of the section valve, which will be automatically started through the pressure
stabilization function to spray water mist for fire extinguishing.

2.3.3 Mechanical Emergency Start


In case of emergency, the handle on the section valve can be operated manually by machinery, which will be automati-
cally started through the pressure stabilization function to spray water mist for fire extinguishing.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 3
High Pressure Water Mist System

3. Main Technical Parameters


The main technical parameters of the high-pressure water mist extinguishing equipment are shown in the following
table.

Product Model LF-WMS (rated flow)/14-PL (imported Danfoss nine-plunger pump series)

Product Model LF-WMS (rated flow)/14-PAVLN (domestic nine-plunger pump series)

Rated Flow (L/min) 112 224 336 448 560 672 784 896 1008

Rated Working Pressure 14 MPa


Rated flow of Single Pump
Supplied 112 L/min

Rated Power of Motor of


Single Pump Supplied 30 kW

Working Power Supply AC 380V, 50 Hz

Starting Mode Automatic, manual, mechanical emergency


Operating Ambient
4 oC ∼ 50 oC
Temperature

Note: Model representation of high-pressure water mist extinguishing equipment: such as LF-WMS-112
LF: LIFECO Product series;
WMS: water mist system;
112: Rated flow of the equipment (L/min);

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 4
High Pressure Water Mist System

4. Main Components of the Equipment


4.1 Pump Supplied Unit
It consists of high-pressure pump, pressure relief regulating valve, safety valve, pressure gauge, water inlet pipeline,
high-pressure water outlet pipeline, overflow pipeline, relay tank, stabilized pressure pump, control cabinet, etc., and
is used for water supply of high-pressure pump supplied, pressure stabilization of pipeline and control of extinguishing
equipment. as shown in the figure.

1.Control cabinet mounting rack 2. Control cabinet


3. Main water inlet pipe of pump supplied 4. Water outlet hose of pump supplied
5. Water inlet hose of pump supplied 6. High-pressure pump
7. Pump supplied mounting bracket 8. Motor
9. Relay water tank 10. Liquidometer
11. High precision filter 12. Water tank inlet pipe group
13. Header 14. Stabilized pressure pump
15. Safety valve 17. Pressure relief regulating valve

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 5
High Pressure Water Mist System

Main technical parameters:

Dimensions Water Inlet HP Water


Product Model Flow Pressure
(L x W x H) mm Pipeline Outlet Pipeline

XSWBG112/14 112L/min 14MPa 1010X2855X2000 DN50 Flange DN32

XSWBG224/14 224L/min 14MPa 1010X3360X2000

XSWBG336/14 336L/min 14MPa 1010X3540X2000 DN65 Flange DN40

XSWBG448/14 448L/min 14MPa 1010X4045X2000

XSWBG560/14 560L/min 14MPa 1010X4195X2000 DN80 Flange DN50

XSWBG672/14 672L/min 14MPa 1010X4700X2000

XSWBG784/14 784L/min 14MPa 1010X4780X2000 DN100 Flange DN50

XSWBG896/14 896L/min 14MPa 1010X5365X2000 DN100 Flange DN65

XSWBG1008/14 1008L/min 14MPa 1010X5365X2000

4.2 Section Valve


4.2.1 Type A
It consists of pressure switch, high-pressure manual ball valve, high-pressure electric stop valve, junction box, pressure
gauge and box. The working power supply is DC24V, 0.15A, and the rated working pressure is 16MPa.

It starts automatically when receiving the linkage signal from the fire alarm controller and the feedback valve opening
signal is sent to the fire alarm controller, then the high-pressure pump supplied starts to release water mist to the
enclosure for fire extinguishing, the pressure switch sends a spraying feedback signal to the fire alarm controller, as
shown in the figure.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 6
High Pressure Water Mist System

1. High-pressure welded union (water inlet) 2. High-pressure manual ball valve (normally open)
3. Pressure gauge 4. High-pressure electric stop valve (normally closed)
5. Pressure gauge 6. High-pressure welded union (water outlet)
7. Junction box 8. High-pressure manual ball valve (normally open)
9. Pressure switch 10. Test valve (normally closed)
11. Box

Main technical parameters:

Product Model LF-SVA-(Nominal Diameter)

Nominal diameter DN 15 20 25 32 40 50
Pipe Specification (mm)
(outer diameter X φ22×2.5 φ27×2.5 Φ34×3 Φ42×3.5 Φ48×4 Φ60×5
thickness)

Rated Working Pressure 160 Bar


Working Power Supply ≥ DC24V, 0.15A
Overall Dimensions H=950mm W=600mm D=220mm
Pipe Connection Size Wl=390mm DI = 701nm

Note: Model Representation of Section Valve: Such as LF-SVA-32


LF: LIFECO Product Series;
SVA: Section Valve Type A
32: Nominal Diameter.

4.2.2 Type B
It consists of pressure switch, high-pressure electric stop valve, junction box and box. The working power supply is
DC24V, 0.15A, and the rated working pressure is 16MPa.

It starts automatically when receiving the linkage signal from the fire alarm controller and the feedback valve opening
signal is sent to the fire alarm controller, then the high-pressure pump supplied starts to release water mist to the
enclosure for fire extinguishing, the pressure switch sends a spraying feedback signal to the fire alarm controller, as
shown in the figure.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 7
High Pressure Water Mist System

1. High-pressure welded union (water inlet) 2. Box body


3. Junction box 4. High-pressure electric stop valve (normally closed)
5. Pressure switch 6. High-pressure welded union (water outlet)

Main technical parameters:

Product Model LF-SVB- (Nominal Bore)

Nominal Diameter DN 15 20 25 32 40 50 65
Specification ff Welded
Pipe (mm) (Outer Diameter φ22×2.5 φ27×2.5 Φ34×3 Φ42×3.5 Φ48×4 Φ60×5 Φ76×6
X Thickness)

Rated Working Pressure 160 Bar


Working Power Supply ≥ DC24V, 0. 15A
Overall Dimensions
(DN15~DN50) H=540mm W=380mm D=220mm

Installation Dimension
(DN15~DN50) W1=105mm D1=70mm

Overall Dimensions (DN65) H=650mm W=450mm D=220mm

Installation Dimension
W>150mm DI=110mm
(DN65)

Note: Model Representation of Section Valve: Such as LF-SVB-32.


LF: LIFECO Product Series;
SVB: Section Valve Type B
32: Nominal Diameter.

4.2.3 Wiring of section valve


Internal wiring of section valve box:

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 8
High Pressure Water Mist System

Description of external wiring of section valve box:

S/N Terminal Name Purpose and Description


Module valve Normally open passive contact, output contact closing signal after the section
1 open feedback valve is fully opened
Normally open passive contact, input contact closed signal when energized,
2 Input passive section valve open
+-24V power
3 Control valve power supply of zone 0, ≥ DC24V, 0.15A
supply
Output feedback Normally open passive contact, output contact closing signal when the water
4
signal pressure in the pipeline reaches the set value
Normally open passive contact, connected with the pump supplied control cabinet,
Remote control the section valve is fully opened, and the output contact closing signal directly starts
5
startup the pump supplied control cabinet

Valve closing Normally closed passive contact, output contact opening signal after the section
6 valve is opened
feedback

4.3 Water Mist Nozzle


Connect with water mist pipe through special connectors for nozzles, which is used for high-pressure water mist, as
shown in the figure.

Nozzle

Special connector for nozzle

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 9
High Pressure Water Mist System

1. Connect with nozzle thread 2. Connect with pipeline weld (the outer diameter 6 of connecting pipeline shall
be provided)

Main Technical Parameters

Maximum installation Maximum installation


Specification and Rated Flow Rated Working
spacing and height spacing and height
Model (L/min) Pressure/MPa (spacing X height) for local (spacing X height) in total
application/m flooding application/m

LF-WMN-03 3 100 / 3X4.5

LF-WMN-05 5 100 / 3X4.5

LF-WMN-07 7 100 3x3 3X4.5

LF-WMN-09 9 100 3x3 3X4.5

LF-WMN-10 10 100 3X3.5 3X7.5

LF-WMN-12 12 100 3X3.5 3X7.5

LF-WMN-15 15 100 3X4.0 3X7.5

LF-WMN-17 17 100 3X4.0 3X7.5

LF-WMN-20 20 100 3X4.0 3X7.5

LF-WMN-25 25 100 3X4.0 3X7.5

Note: The Model Representation of Water Mist Nozzle: Such as LF-WMN-25


LF: LIFECO Product Series.
WMN: Water Mist Nozzle.
25: K-Factor/10.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 10
High Pressure Water Mist System

5.Installation
5.1 General Requirements
Before installation of the system, the design unit shall make technical disclosure to the construction unit, and shall
meet the following conditions:

1) Through review, the approved design and construction drawings, design specifications, design changes and other
technical documents are complete;
2) Data on the installation and use of the system and its main components, etc. are complete;
3) The types, specifications and models of system components, pipe fittings and other equipment and materials shall
meet the design requirements;
4) The configuration conditions of the enclosure or protected object and equipment room are consistent with the
design document;
5) Embedded parts and reserved holes, etc. required by the system shall meet the design requirements;
6) The water, electricity and gas used on the construction site and during the construction shall meet the construction
requirements;
7) Construction of the system shall be undertaken by qualified professional construction teams;
8) Construction and installation shall be carried out in accordance with relevant engineering design documents and
relevant national construction technical standards.

5.2 Installations
5.2.1 Installation of Pump Supplied Unit
1) The placement of the pump supplied unit shall comply with the requirements of the design drawings;
2) The levelness deviation of foundation of the pump supplied unit should not be greater than ±2mm/m;
3) If the pump supplied unit is fixed with anchor bolts, the bolt diameter is 16mm, the bolt exposed from the base is 60
~ 70mm high, and rubber shock cushion should be used between the pump supplied unit and the foundation;
4) The maintenance channel should be set around the pump supplied unit, and the width of the channel should not be
less than 0.7m;
5) When making the inlet and outlet of the control cabinet, the protection level of the control cabinet should not be
damaged;
6) The overflow pipe and sewage pipe of the trunk tank are connected to the drainage ditch through the pipe.

5.2.2 Installation of Section Valve


1) The installation position of section valve shall comply with requirements of the design drawings;
2) The installation position of the observation instrument and operating valve of the valve group should be determined
according to the design requirements, and should be easy to observe and operate. The opening and closing mark
on the valve group shall be easy to identify, and the permanent sign indicating the controlled enclosure shall be set
and indicated on the control valve;
3) The installation height of section valve should be 1.2m ~ 1.6m (based on the operating surface of electric globe
valve), and the distance between the operating surface and the wall or other equipment should not be less than
0.8m, and should meet the requirements of safe operation, the installation height of the valve box suggested by us
is 1.3m, and the bottom of the valve box is 0.9m from the ground;
4) The section valve is fixed on the wall with expansion bolts with diameter of 12mm, 4 expansion bolts for each valve
box.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 11
High Pressure Water Mist System

5.Installation
5.2.3 Installation of Pipeline
5.2.3.1 In addition to the relevant provisions of the current national standards《Code for construction of industrial
metallic piping engineering》GB 50235 and《Code for construction of field equipment,industrial pipe welding
engineering》GB 50236, the installation of pipes and pipe fittings shall comply with the following provisions:

1) The layout of pipelines shall comply with requirements of the design drawings;
2) The pipeline should comply with austenitic stainless steel seamless steel pipe of Grade 022Crl7Nil2Mo2 stipulated
in the current national standard《Stainless and heat-resisting steels—Designation and chemical composition》GB/T
20878 (generally called 316L), or other metal pipe with corrosion resistance and pressure resistance of no less than
the grade 022Crl7Nil2Mo2;
3) The material of pipe fittings should be the same as that of pipeline, and the pipe should be connected with special
joint or flange, or Argon arc welding;
4) The nominal pressure of pipelines and pipe connectors should not be less than the maximum design working
pressure of the system, and the nominal pressure of pipelines, pipe connectors and valves between the pump
group inlet and the water storage tank should not be less than 1.0 Mpa;
5) For those set in system with environment of explosion risk, the pipe and pipe fitting shall take the measures of
electrostatic conductivity removal;
6) Pipelines should be cleaned in sections before installation. During the construction process, the interior of the
pipeline shall be kept clean, without welding slag, welding burr, oxide skin, impurities or other foreign bodies., and
the openings in the construction process shall be closed in time;
7) If flange connection is used, side-by-side pipe flange should be convenient to disassemble and assemble, with
space of no less than 100mm;
8) The welding between pipes or between pipes and pipe fittings shall be butt-welded, the Argon arc welding process
shall be used for pipe welding, and a compatible electrode shall be used. The joint preparation form, processing
method and size shall conform to the relevant provisions of current national standard《Recommended joint
preparation for gas welding manual metal arc welding gas-shield arc welding and beam welding》GB/T 985.1
9) Casing should be used at place where the pipe crosses the wall and floor; the length of casing crossing the wall
should not be less than the thickness of the wall, and the length of the casing crossing the floor should be 50mm
above the floor. The gap between the pipe and the casing shall be filled densely with fireproof sealing materials;
10) The pipeline shall be fixed on the building components with anti-shaking metal supports and hangers. The support
and hanger shall be able to withstand the weight and impact of the pipeline when it is filled with water, and the
spacing shall not be greater than that regulated in the following table. The support and hanger shall be subject to
anti-corrosion treatment, and measures shall be taken to prevent electrochemical corrosion with the pipeline.

Space between supports and hangers of the system pipeline

Pipe Diameter DN <16 20 24 28 32 40 48 60 276

Max. Space (m) 1.5 1.8 2.0 2.2 2.5 2.8 2.8 3.2 3.8

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 12
High Pressure Water Mist System

5.2.3.2 After installation and fixing, the pipeline should be flushed and should comply with the following provisions:
1) Before flushing, protective measures shall be taken for the instrument of the system, and pipe support and hanger
shall be inspected, and reinforcement measures shall be taken if necessary;
2) The water quality of flushing water should meet the requirements of the system;
3) Flushing velocity should not be lower than the design velocity;
4) After qualified flushing, fill in the pipeline flushing record.

5.2.3.3 After pipeline flushing is qualified, pressure test shall be carried out on the pipeline, and the following
requirements shall be met:
1) The quality of the test water should be consistent with the flushing water of the pipeline;
2) The test pressure should be 1.5 times of the working pressure of the system, the pipeline is filled with water, and
the air is emptied, and the pressure test device is used to increase the pressure slowly, when the pressure rises to
the test pressure and the pressure is stabilized for 5 minutes, the pipeline shall be free from damage and
deformation, then the pressure is lowered to the working pressure of the system and the pressure is stabilized for
120min, and the pipeline be free from pressure drop, deformation or leakage.
3) The test point is suggested at the lowest point of the system pipe network, and the equipment, instruments, valves
and accessories that cannot be involved in the pressure test should be isolated or installed after the test;
4) After passing the test, the test record should be filled in.
5.2.3.4 After passing the pipeline pressure test, the system pipeline should be purged with compressed air or
nitrogen with purge pressure not greater than the working pressure of the pipeline, and the flow rate should not be
less than 20m/s. The end of the pipeline is set with target plate coated with white cloth or white paint, and the target
plate is qualified if it is free of rust slag, dust, water stains and other debris within 5 minutes.

5.2.4 Installation of nozzle


1) Nozzle installation shall be carried out after pressure test and purging are qualified;
2) When installing nozzle, check the nozzle type, specifications and the orifice direction one by one according to the
design document, do not disassemble and assemble or modify nozzle;
3) Special wrench shall be used for nozzle installation;
4) The installation height and space of nozzle, the distance between nozzle and the ceiling, door, window, mouth, wall
or obstacle should meet the design requirements;
5) For nozzle without decorative cover, the end thread of the connecting pipe should not expose from the ceiling, and
nozzle with decorative cover should closely fit with the ceiling.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 13
High Pressure Water Mist System

6. Commissioning
6.1 Commissioning Preparation
1) The system and other devices, power sources and water sources linked with the system shall be in standby state,
and the safety conditions on site shall meet the commissioning requirements;
2) The inspection equipment required for system commissioning should be complete.

6.2 Commissioning
6.2.1 Device Commissioning
1) Close the collecting pipe control valve, open the control valve of the test pipeline and pressure relief pipeline and
the vent ball valve switch at the top of the filter;
2) Adjust the manual-automatic switching knob of the control cabinet to the manual position, open all the power
switches in the control cabinet, the main electric indicator on the control cabinet is on, the intelligent single loop
measurement and control instrument shows 0, and the water pressure indicator in the stabilization area is on;
3) After the control cabinet is powered, the low liquid level indicator is on, the low water alarm indicator of water tank
will be on and emit an alarm buzzer, the water refill solenoid valve automatically opens for water refill (Note: When
the liquid level is low, water will refill automatically regardless the state of the control cabinet), the water refill will
start and the indicator light is on, when the water level of the trunk tank exceeds the low water level, the low water
alarm indicator of the tank will be off and the alarm buzzer will stop, when the liquid level of the trunk tank exceeds
the low level, the low level indicator will be off, and water will continue to be refilled to high level, the water refill
solenoid valve should be closed to stop water refill, the high level indicator is on. Observe the bleed ball valve
switch at the top of the filter during the water refill process, and close the ball valve after water flows out upon
completion of venting.
4) Open the sewage valve of the relay tank to drain water and clean the relay tank, the liquid level control should be
able to operate automatically during the cleaning process. Close the sewage valve after cleaning and refill the relay
tank to the high liquid level;
5) Open the control valve of the water inlet pipe of the pressurized pump under the relay tank to refill the water to the
pressurized pump. The next step can be proceeded only after confirming that the pipeline is full of water;
6) Press the start and indication buttons of the stabilized pressure pump on the control cabinet to start the stabilized
pressure pump and confirm the normal operation and the correct phase sequence of the power supply of the
stabilized pressure pump. Press the stop button of the stabilized pressure pump to stop the operation of the stabi
lized pressure pump and test two stabilized pressure pumps one by one;
7) Loosen the air release bolt on the pimp supplied unit, and then tighten the air release bolt when the water sprays
from the bolt hole, then press the start and indication buttons of the high pressure pump on the control cabinet to
start the high-pressure pump supplied, confirm the normal operation of the high-pressure pump supplied, then
press the stop button of the high-pressure pump supplied, the high-pressure pump supplied will stop running, all the
high-pressure pump supplied are tested one by one, if the operation of pimp supplied unit is noisy, the operation
and commissioning of the pimp supplied unit should be carried out after secondary venting treatment;
8) Press the start and indication button of the high pressure pump on the control cabinet to start the high-pressure
pump supplied, slowly close the test pipeline control valve, check the value displayed by the intelligent single loop
measurement and control instrument, the output pressure of the high-pressure pump supplied should reach 14MPa,
press the stop button of the high-pressure pump supplied and the high-pressure pump supplied will stop running,
and the opening position of the test pipeline control valve will remain unchanged. All high-pressure pump supplied
can meet the pressure requirements through testing one by one, after testing, open the control valve on test pipeline
for pressure relief;

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 14
High Pressure Water Mist System

9) Close the control valve of test pipeline, adjust the control cabinet manual-automatic switch knob to the automatic
position, the stabilized pressure pump should be able to start automatically, the stabilized pressure pump start
and indication light will be on, when the value showed on intelligent single loop measurement and control
instrument is larger than 1.2, the stabilized pressure pump should be able to stop automatically, at the same time,
the water pressure indicator in the stabilization area is off;
10) The control cabinet manual-automatic switch knob is in the automatic position, slowly open the control valve of
test pipeline, and when the value displayed on intelligent single loop measurement and control instrument is
smaller than 0.8, the stabilized pressure pump should be able to start immediately, the start and indication light of
stabilized pressure pump will be on, continue to open the control valve of test pipe and maintain the valued
showed on intelligent single loop measurement and control instrument continuously smaller than 0.8, when such
value can be maintained for more than 10 s, the high-pressure pump supplied should be able to start automatically
while the stabilized pressure pump stops automatically, and continue to start the next high-pressure pump
supplied through linkage of pressure until the pressure in the pipeline meets the design requirements, then stop
the linkage start, press the emergency stop button to stop all the high-pressure pump supplied from starting
automatically. After the test is completed, adjust the control cabinet manual-automatic switch knob to the manual
position and turn the emergency stop button to restore the device;
11) The control cabinet manual-automatic switching knob is in the manual position, open the control valve of test pipe,
press the one-key start and indication button, the high-pressure pump supplied should be able to start automati
cally, and continue to start the next high-pressure pump supplied through pressure linkage, press the one-key stop
button, the high-pressure pump supplied should be able to stop all operation;
12) Close the control valve of the test pipeline, start the stabilized pressure pump until the intelligent single loop
measurement and control instrument shows 21.1. adjust the control cabinet manual-automatic switching knob to
the automatic position, and input the alarm signal, the high-pressure pump supplied should be able to start auto
matically, and continue to start the next high-pressure pump supplied through linkage pressure until the pressure
in the pipeline meets the design requirements, then stop the linkage start and press the emergency stop button to
stop the start of all high-pressure pump supplied. During the test, the fire alarm indicator is on and emits the alarm
buzzer, the operation signal feedback of the pimp supplied unit is normal. After the test is completed, adjust the
control cabinet manual-automatic switch knob to the manual position and turn the emergency stop button to
restore the device
13) Open the control valve of the test pipeline, adjust the control cabinet manual-automatic switch knob to the inspec
tion position, press the inspection start and indication button, and the device enters the automatic inspection state,
upon completion of the inspection, the inspection start and indication button is off, and upon completion of the
inspection commissioning, adjust the control cabinet manual-automatic switch knob to the manual state;
14) Provide DC24V power supply to the open section valve, press the open valve button, the control valve of the
section valve should be able to start immediately, after opening in place and stop, the corresponding valve open
ing signal should be sent out; manually restore the control valve to the closed state, input the alarm signal, the
control valve of the partition valve should be able to start immediately, after opening in place to stop, the corre
sponding valve opening signal should be sent out;
15) Upon completion of commissioning, check the status of all valves of the device.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 15
High Pressure Water Mist System

6.2.2 Spray Test


1) Perform the water mist spray test, adjust the control cabinet manual-automatic switch knob to the manual position,
check and close the electric stop valve and test valve of all section valves, open other valves on the pipeline, close
the control valve of test pipeline in the pump room and open the collecting pipe control valve, start the stabilized
pressure pump to pressurize the pipeline to 0.8MPa, then adjust the control cabinet to the automatic position,
manually open the section valve outside the enclosure that needs to be subject to spray test, and start the
high-pressure pump supplied through the stabilized pressure function, the high-pressure pump supplied delivers
high-pressure water to nozzle to spray water mist. Upon completion of the spray test, press the emergency stop
button on the pimp supplied unit control cabinet to stop, and then restore the device;
2) Link with the fire alarm controller for water mist spray test, adjust the control cabinet manual-automatic switch knob
to manual position, check and close the electric stop valve and test valve of all section valves, open other valves on
the pipeline, close the control valve of test pipeline and open the collecting pipe control valve in the pump room,
start the stabilized pressure pump to pressurize the pipeline to 0.8MPa, and then adjust the control cabinet to the
automatic position, the fire alarm controller sends a linkage signal to start the enclosure section valve which needs
to be subject to spray test. After the section valve is fully opened, the feedback valve opening signal will be sent to
the fire alarm controller, after receiving the valve opening signal, the fire alarm controller will send a linkage signal
to the pimp supplied unit control cabinet, which will start the high-pressure pump supplied according to the preset
program. The high-pressure pump supplied delivers high-pressure water to nozzle to spray water mist, at the same
time, the pressure switch in the section valve detects the rising water pressure in the pipe and sends a feedback
signal to the fire alarm controller, after receiving the feedback signal, the fire alarm controller sends a linkage signal
to lighten the spray indicator. Upon completion of the spray test, press the emergency stop button on the pimp
supplied unit control cabinet to stop, and then restore the device.

7. Maintenance and Management


The user shall formulate the system maintenance management system, and shall execute the system according to the
maintenance system and operation rules, so as to keep the system in normal operation status, and the maintenance
management shall comply with relevant regulations; the maintenance and management of the system should be
undertaken by trained personnel, who should be familiar with the working principles, operation and maintenance
methods and requirements of the system.

7.1 Daily Maintenance


1) Check whether the appearance and opening & closing state of the control valve and other valves meet the design
requirements;
2) Check whether the main and standby power supplies of the system are connected;
3) In cold and severe regions, check the room temperature where the water storage equipment is set, and the
temperature should not be lower than 5OC;
4) Check the control panel and display signal status of the pimp supplied unit control cabinet;
5) Check whether system marks and operation instructions of the system are correct, clear and complete, and they
should be in the correct position.

7.2 Monthly Maintenance


1) Check the appearance of the system components, and there should be no collision deformation and other
mechanical damages;
2) Check whether the operation of section valve is normal;
3) Check whether the valve is in the correct position;
4) Check whether the water level of the water storage tank meets the design requirements;
5) Check whether the nozzle appearance and spare quantity meet the requirements.
In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 16
High Pressure Water Mist System

7.3 Quarterly Maintenance


1) Carry out water discharge test on the system, and check whether the pimp supplied unit startup, switch between
main and standby pumps and alarm linkage function are normal;
2) Check whether the pipe, support and hanger are loose, and whether the pipe fitting is deformed, aged or
cracked, etc.

7.4 Annual Maintenance


1) Regularly measure the water supply capacity of primary system water source;
2) Carry out comprehensive inspection on the system components, pipes and fittings, and shall clean the water
storage tank and filter, meanwhile, the pipes behind the control valve shall be purged;
3) The water storage tank should change water once every six months;
4) Carry out system simulation linkage function test.

6. Precautions
1) The extinguishing equipment should be gently loaded and unloaded during transportation, collision, lying down or
upside down is strictly prohibited.
2) In the process of disassembly and assembly, damage to surface of the device should be avoided to affect the
appearance.
3) Irrelevant personnel are not allowed to touch various components of the device to avoid accidents.
4) The installation and commissioning personnel of the device should be familiar with the basic structure, working
principle, performance and operation procedures of the device, as well as the basic structure and working state of
each component.
5) Maintenance should be carried out in strict accordance with the operating procedures to prevent malfunction.
6) Other safety measures shall follow the relevant national regulations.

9. After-sale Services
1) Service tenet: integrity, speed, speediness and thoughtfulness.
2) Service objectives: superior products, integrity-based, customer first, considerate service
3) Service efficiency: If the device fails during or beyond the warranty period, upon receiving the notice, the supplier
shall assign maintenance personnel on site within the shortest time to quickly troubleshoot the problem for the
demander.
4) Service principle: According to the relevant national laws and regulations, the product implements three guaran
tees, that is, within the warranty period, the supplier will repair and replace the damaged parts free of charge, for
damaged parts beyond the warranty period, only cost price is charged for the provided parts, for equipment
damage caused by human factors of the user, the accessories repaired or provided by the supplier are calculated at
the cost price.
5) Training: Train personnel for the user, so that they can understand the working principle of the device, be skilled in
device operation, and be able to solve common problems.

In line with our policy of continuous product improvement LIFECO reserves the right to modify specifications without prior notice.
Unit 8, Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, WV10 7DZ, United Kingdom T +44 1902 798 706 F +44 1902 798 679 E [email protected] www.lifeco-uk.com 17
Lichfield Fire & Safety Equipment Co. Ltd
Unit 8, Calibre Industrial Park Laches Close, Four Ashes
Wolverhampton, WV10 7DZ, United Kingdom
Tel: +44 (0) 1902 798 706 | Fax: +44 (0) 1902 798 679
Email: [email protected]