REQUEST FOR INSPECTION
LTA
MNERALS,
SMTPA PJT (Fuel Storage Tank Stage 1)
[Project UTPA PUT Fuel Storage Tark Stage 1) [Discipline Eretial Work
[Contractor PT. Lintech Duta Pratamay [Request date 15 aug 2024
IRFINo LDP.221100826-E10-RFI-Ig6
Location Lampunut
ITP No. {LDP 221 100326-PRE-09
INSPECTION DETAIL
[i Inspection Date/Time 1 1610S 2024
[2 Construction Activity No Activity
3. Inspection Aativity Inspection Gable NYY 4exd,Smim2
[&. Description
Cable Used for Route Panel it Trap 0 3GPO
[5 DWG No. Reference > LOP-721100829-£10-01
5 Inspection Point Witness W)
Remark
Items of inspection
{Iran Cale specton nd Coninuy Tex
2. Visual Check Cable —
3. Check Cable Color Code
Signature for Notification / Acknowledgement
PT: Lniech Data Patara PT. PT. Adare Maniwal Coal
Name KUSMAWAN Name ian
=e Se q
Date SHOW2026 [Date 1
‘ACCEPTED 7 REJECTED POSTPONED ‘CANCELLED
‘Signature for inspection Execution
FT. Lntech Duta Pratama PT. Adar Wawa Coal
Nene? Coamcas an Name
Date le -28 tag, [Date eft Fixaadaro® DJLINTECH
CABLE INSTALLATION INSPECTION
Eien Pr Wars Coal Panties Came gonre
PO No. TO30007353 Equipment WO GCx UR
conirac Tie. Expasin Fol Songs Tk Cop RETR ATOR Location _Pock Tap ko SP RO.
Brewing Ne GOP -AUSo ym CLD Gon Dee EDP WTO
Heck ust CHECKED BY. Dave
1 Check that cable tray or conduit is free of sharp edges. €~ Kromowar / 4
2 Check thatnumberof pling poinisadeguateandthenumberot | CJunt_ [88
bends between pulling points does not exceed specification =
requirements,
3 Inspect cable for jacket damage prior toppling. U~
4 Perform insulation Resistance Test (megger) on power cables after
Installation and record.
5 Cables identified as per specification and drawings. (~~
6 Cable markers installed as specified. ~~
7 Check that cable is correct size ~~
8 Check that cable gland tight. \~
9 Earthing & Bonding installed correctly —~
REMARKS
cerririep By: Grourausern, Yh uP pare (e028 - ey
PTLINTECH DUTA PRATAMA
AccePrep py f are (6/08/24
CLIENT REPRESENTATIVE,
‘Loe wo-002
Version
Now?adaroW
MINING LINTECH
CABLE CONTINUITY TEST
cient. PTMaruwal Coal Pant Area/lat No” LAMPUNUT —]
Conta Doe ! LDP Wi02 008 Location: Fon Tap & SE GPO
[Contract Title. : Expansion Ful Storage Tank Cop2xiS00KT._[Megger Voltage: STOUAG
[erticate calibration No - BO7232296 [Test Equipment Used & Serial No > FLUKE.B7.S
Continay
cations, | rompoin | torcints | 12™ |contniy | checked By/0ue
Q | checkea
SReo-wensi | Coola (eu CT Nemes 4
Coa © | Ginine Mya | 2 | | Rivar
Cola Hoe ervte
rae re aul eo
cra | enieg Hyacl 2 |
Fae Gu yew | Ope = 7
REMARKS
(CERTIFIED BY Kusmawan DATE
PTLINTECH DUTA PRATAM:
Jaccerren py va bh /og
Form LDP Wi02-005
Version No.2adaroW REQUEST FOR INSPECTION
6MTPA PJT (Fuel Storage Tank Stage 1)
Project TPA IT Fel Sorape Tank Siege 1) —[Discipine Teal Work
Contracor inten Duta Prats Request dato 15 Aug 2008
FIN Top. 221 100800 AES
lection Campy
[It No oP 22 TODS PROT
INSPECTION DETAIL
1 Inspection Date/Time > Aug 16.28
2 Consrucon Aciviy No Acti
inspection Acviy inspection Cable NYY 4603 Sm
a Descrpton Coble Used for Route Panel Oi ap te 3GPO
5 DWG No./ Reference LDP-221100826.10-01
e. nspecton Point Wess (W)
Covtivuytear |
PEREL OL TRAE
3eaPo
RON BCR ap
Comnuuy res
| Pier or TRAP ee
Covtiwoy reer | Comte tear
f vitauan seece Poiana
karo | =) 3eaPo :
WOT Beene Ot pene
Bee | — AIT Ae
Cote tes"
DiseL rl THERE
3earo
HITAM — KUNING HUAU ‘ABU ~ KUNING WAUadaro&
CABLE INSULATION TEST
tient. PT Marawal Coal [Plant Area/Lot No + LAMPUNUT
[Control Doc. : LDP W102-005 Location: 2.AL_That> ke_AP APS
[Contract Tile: Expansion Fi Songs Tonk Cop 2iSW0KL_[Megger Voltage: 00 AC. |
a Test Equipment Used & Serial No SNSULATION TEST
(Certificate Calibration No : 07232228 KYORITSU SU07A SN esizi0s
Tasufation
able No. rom Poin 0 Poin powest | tnsuaton
Cable N From Point A Toroinee | eu Checked By/Date
MU | Checked
300 -wospgeie | Coe Lae Ate Ow — _| cree
Cae Samy ttyl OC T= [Won [a
Collate ikaw ow |
Shawn Be OU —
thom | nu Myo | Oc | —
Den Gong Ayes] OM |
J
[REMARKS
CERTIFIED BY Gana DATE (6-08 ~n0uq
PTLINTECH DUTA PRAT:
|ACCEPTED BY vate 16 /6@/e. 9
Form LDP W102-005
Version No:2REQUEST FOR INSPECTION
~ MINERALS.
GMTPA PUT (Fuel Storage Tank Stage 1)
Project SMTPA PIT (Fuel Storage Tank Stage 1) [Discipline Electrical Work
[Contractor PT. Lintech Duta Pratama [Request date: 15 Augi 2024
FINO UDP-221100328-E1D-RFI-146
Location ‘Lampunut
[ITP No. LDP-221100826-PRG-O9
INSPECTION DETAIL
[1 Inspection Date/Time Aug 16, 24
2. Construction Activity No Activity
'3 Inspection Activity
“4. Deseription
Inspection Cable NYY 4ox2,Smm2
(Cable Used for Route Panel Ol rap to SGPO
[5. DWG No. /Refference _. UDP-221100829-E10-01
(6. Inspection Point
Witness (W)
HITAM — KUNING HMAU
ABU KONING HAVNOWOMSNOO BOs
“Tanah Diam SI
“aL FGOLS ERE WPORPOREONSS
“yoo MMM Ona a
Savivar vita isan ts (Gl)