0% found this document useful (0 votes)
33 views77 pages

IIAR Standards

20190214 IIAR Standards

Uploaded by

Yutt Watt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views77 pages

IIAR Standards

20190214 IIAR Standards

Uploaded by

Yutt Watt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 77

Providing Solutions. Simplifying Regulation.

Overview of IIAR Standards


Peter Thomas, P.E. | Resource Compliance
2007
Providing Solutions. Simplifying Regulation.

RAGAGEP Citations
2008

Normative Informative
Prescriptive Descriptive
Required Supplemental
Shall Should
Must May
Will Could/Can
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
IIAR 1 IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
Providing Solutions. Simplifying Regulation.

Definitions – IIAR 1
• piping: The interconnecting parts of a closed-circuit refrigeration system
that contain and convey the refrigerant. Piping includes pipe; flanges;
bolting; gaskets; valves; fittings; the pressure-containing parts of other
components such as heat transfer components; expansion joints;
strainers; filters; and devices that serve such purposes as mixing,
separating, snubbing, distributing, metering or controlling flow; pipe
hangers; supporting fixtures; and structural attachments.
Providing Solutions. Simplifying Regulation.

Definitions – IIAR 1
• pressure vessel: Any refrigerant containing receptacle in a closed circuit
mechanical refrigerating system designed and manufactured under the
rules of ASME Section VIII, Division 1, Boiler and Pressure Vessel Code.
See also receiver: receiver and controlled-pressure receiver.
EXCEPTIONS per ASME Section VIII, Division 1, Boiler and Pressure
Vessel Code:
a. Compressors
b. Pumps
c. Controls
Providing Solutions. Simplifying Regulation.

Definitions – IIAR 1
• Machinery Room: An enclosed space that, where required by this
standard to contain equipment, must comply with the requirements set
forth in Chapter 6.
• Trained Operator: An individual having training and experience that
qualify that individual to operate and perform basic system inspections on
a closed-circuit refrigeration system with which he or she has become
familiar.
IIAR 2 IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
Providing Solutions. Simplifying Regulation.

IIAR Standard 2
• ANSI/IIAR 2 Standard for Safe Design of Closed-Circuit Ammonia
Refrigeration Systems
1974-78 1984 1999 2008 2014
Providing Solutions. Simplifying Regulation.

Overview
• Part 1 – General (Chapters 1-3)
• Part 2 – Design and Installation Considerations
(Chapters 4-7)
• Part 3 – Equipment (Chapters 8-17)
• Part 4 – Appendices (Appendix A – Appendix N)
Providing Solutions. Simplifying Regulation.

Outline
• Part 1
o Chapter 1 – Purpose, Scope, and Applicability
o Chapter 2 – Definitions
o Chapter 3 – Reference Standards
• Part 2
o Chapter 4 – Location of Ammonia Refrigeration Machinery
o Chapter 5 – General System Design Requirements
o Chapter 6 – Machinery Rooms
o Chapter 7 – Refrigeration Equipment in Areas Other Than
Machinery Rooms
Providing Solutions. Simplifying Regulation.

Outline
• Part 3 Systems and Equipment
o Chapter 8 – Compressors o Chapter 15 –
o Chapter 9 – Refrigerant Overpressure Protection
Pumps Devices
o Chapter 10 – Condensers o Chapter 16 –
Instrumentation and
o Chapter 11 – Evaporators
Controls
o Chapter 12 – Pressure
o Chapter 17 – Ammonia
Vessels
Detection and Alarms
o Chapter 13 – Piping
• Part 4 (Informative
o Chapter 14 – Packaged
Appendices)
Providing Solutions. Simplifying Regulation.

Normative vs. Informative


Normative Informative
Parts 1-3 (Chapters 1-17) Part 4 (Appendices)
Prescriptive Descriptive
Required Supplemental
Shall Should
Must May
Will Could/Can
Providing Solutions. Simplifying Regulation.

IIAR 2 vs. ASHRAE 15


IIAR 3 IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
IIAR 4 IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
LP Side HP Side Components
Components Including Valves, Sensing
Compressors Including Devices, Heat Exchangers,
Hot Gas Condensers, Pumps &
Vessels,
Defrost Piping
Heat
Evaporators
Exchangers,
LP Side & Piping
HP Evaporators, Water-cooled Air-cooled
& Pumps &
Side Systems Systems
Boosters Piping

Psig 250 300 250 250 250 300

kPa
1724 2069 1724 1724 1724 2069
gauge
IIAR 5 IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
IIAR 7 IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
IIAR 8 IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
Bulletin No. 109
Bulletin No. 110
Bulletin No. 114
Bulletin No. 114

Pre-March 2014

Post-March 2014
ASME A13.1
Bulletin No. 114
PSM/RMP Guidebook
ARM-LC Guidebook
Piping Handbook
IIAR 1
Definitions

IIAR 3
Valves

IIAR 2 IIAR 4
Design Installation

IIAR 6
Inspection, IIAR 8
Testing, and Decomm.
Maintenance

IIAR 7 IIAR 9
IIAR 5 Start-
Operating Existing
Up
Procedures Systems
Providing Solutions. Simplifying Regulation.

Questions?
Peter Thomas, P.E.
[email protected]