Construction Method Statement - Bridge
Construction Method Statement - Bridge
Introduction Legend
This sketch relates to the Cavan Regional Sports Complex. Granular Working Platform / Access Ramps
STAGE 3
Project: CAVAN REGIONAL SPORTS COMPLEX Document Title: CONSTRUCTION METHODOLOGY STATEMENT Page Nr: 1
Project: CAVAN REGIONAL SPORTS COMPLEX Document Title: CONSTRUCTION METHODOLOGY STATEMENT Page Nr: 2
An indicative construction sequence for the proposed bridge Granular Working Platform / Access Ramps
carriageway surface. In the long term this system will ensure 8a Construction Sequence Reference
that the sensitive river environment is protected against any
potential surface contaminants arising at carriageway level. Please note, the layout detailing the locations of each
stage of the construction sequence should be
Stage 8 – Installation of kerbing to the carriageway extents, considered indicative only and subject to
followed by the construction of the proposed road build-up. 7 development at detailed design stage. All in ground
and foundation works are proposed to be carried out
The road-build up would be constructed to suit drainage falls in Spring / Summer, where the probability of adverse
as required by the design. weather conditions is considered low.
8b
STAGE 8b
Project: CAVAN REGIONAL SPORTS COMPLEX Document Title: CONSTRUCTION METHODOLOGY STATEMENT Page Nr: 3