SCSC Reply Merged Modified
SCSC Reply Merged Modified
References:
1. Your letter F.No. 1-808/AICTE/PGRC/DSKIET/2023/1033-1035 Dated
20/08/2024
2. Your letter F.No. 1-808/AICTE/PGRC/DSKIET/2023/972 Dated
05/08/2024
3. Our reply dated in response to your letter letter F.No. 1-
808/AICTE/PGRC/DSKIET/2023/972 Dated 05/08/2024 submitted on 13th
August 2024 (Submitted through speed post and Centralized Public
Grievance Redress And Monitoring System.
4. Several Complaints forwarded through Centralized Public Grievance
Redress And Monitoring System (online system) (after February 2022 till
date)
5. Several Complaints forwarded through Central Vigilance Commission
through its portal (online system) (after February 2022 till date)
6. Several complaints by Vikramshila Polytechnic Teaching and Non-
Teaching staff Multipurpose Union (after February 2022 till date)
We regret to inform you that we are unable to physically present all the evidence
before the Standing Scrutiny and Complaint Committee (SCSC) due to the
arbitrary withholding of our salaries by the institute for over 20 (twenty) months,
which has led to severe financial distress. Despite repeated instructions from the
AICTE to the Secretary and President to resolve service-related issues through
the Grievance Redressal Committee (GRC), the management has intentionally
neglected these directives.
P a ge |2
at Bombay, Nagpur Bench, which pointed out the intentional delay in obtaining
the Extension of Approval for the Polytechnic.
Despite several RTI applications, both the Engineering and Polytechnic institutes
operated by Shri Dadasaheb Gawai Charitable Trust on the same campus have
repeatedly denied consent for the disclosure of information to WR (RB), AICTE
HQ-New Delhi, indicating an attempt to conceal information. We are submitting
one such email as proof of our claim.
We have already submitted documents related to the violation of EPF dues
payment by both institutes.
There is several concerns with building infrastructure as many buildings have
developed severe cracks and structural stability is at question. Non-availability of
sewage disposal system has created potential danger for the buildings. Some
cracks in the building have propagated throughout the entire building.
We do not find any point in submitting detail-building infrastructure of total built
up area of both AICTE approved institute as both institute for obtaining EOA on
AICTE portal has already submitted it.
We, therefore, request the Standing Scrutiny and Complaint Committee (SCSC)
to aggregate all complaints submitted through the Centralized Public Grievance
Redress and Monitoring System as well as the Central Vigilance Commission
portal and recommend a surprise visit to verify the facts against the allegations
and complaints filed by us.
Thanking you
P a ge |4
Yours sincerely,
Saturday, 27 July 2024
ित,
ा मनीष मनोहर पाटील
भारी ाचाय (अित र कायभार )
िव मिशला तं िनके तन दारापरु
संदभ: Extension of Approval (EoA) F.No. Western/143660840238/2024/EOA Date of Approval: 25-
Jul-2024(attached for ready reference)
िवषय: APH 2024-25 ते 2027 (अ याय-VI) म ये िदले या सव िनदशाचं े अिनवाय पालन कर याबाबत ...
महोदय,
सदं भाम ये नमदु EOA नसु ार खाली नमदु मािहती सं थे या संकेत थळावर सवासाठी गत / कािशत करणे आव यक
आहे
As per mandatory Disclosure of APH, 2024-27(Annexure-18, page180) Institutions must disclose the
following information submitted to Council at the prominent location on its website.
1. Department wise availability of Infrastructure along with approved courses and intake
approved by the Council.
2. Faculty details: Department wise: Name& Designation of the faculty members/teaching staff
along with their qualification, tenure of service in your organization, total experience, Institution
should also disclose Student Faculty Ratio, Cadre Ratio.
3. Additionally Audited Financial Statements for last three financial years.
आपणास या प ा ारे िवनतं ी आहे िक वरील नमदु मािहती संकेत थळावर व रत उपल ध क न ावी तसेच याची एक त
आम या सघं टनेला यायालयीन कामकाजाक रता दान करावी.
आपले कृ पािभलाषी
All India Council for Technical Education
(A Statutory body under Ministry of Education, Govt. of India)
Nelson Mandela Marg,Vasant Kunj, New Delhi-110070 Website: www.aicte-india.org
To,
The Secretary,
Tech. & Higher Education Deptt.
Govt. of Maharashta, Mantralaya,
Annexe Building, Mumbai-400032
Ref: Online application of the Institution submitted for Extension of Approval for the Academic Year 2024-25
Sir/Madam,
In terms of the provisions under the All India Council for Technical Education (Grant of Approvals for Technical Education), Powers
delegated in AICTE ACT 1987, (No 52 of 1987) chapter II - u/s 2(g) to regulate Technical and subsequent Regulations of AICTE, I am
directed to convey the approval to:
To conduct following Programs/Courses with the Intake indicated below for the Academic Year 2024-25
FN / Gulf
Affiliating Body Intake Intake NRI
quota/ OCI/
Level Program Course (University Approved Approved Approval
Approval
/Body) for 2023-24 for 2024-25 Status
Status
ELECTRONICS
ENGINEERI Maharashtra State
AND
NG AND Board of Technical
DIPLOMA TELECOMMUNIC 60 60 No No
TECHNOLO Education,
ATIONS
GY Mumbai
ENGINEERING
All AICTE approved Institutions are empowered to nurture ecosystems for Skilling (through Vocational courses) via making effective use of
existing infrastructure facilities and human resources.
It is mandatory to comply with all the essential requirements as given in APH 2024-25 to 2027 (Chapter-VI)
a
Note: EOA as per Court order W.P. NO. 3541 OF 2023.
ii. Faculty details: Department wise: Name& Designation of the faculty members/teaching staff along with their qualification,
tenure of service in your organization, total experience, Institution should also disclose Student Faculty Ratio, Cadre Ratio.
2. Reservation Policy of the Central Government (Including EWS) / Respective State Government/ UT as the case shall be applicable
to all the Programmes. The concerned State Government/ UT Admission authority shall decide Modalities of Admission.
3. The Institution offering courses earlier in the Regular Shift, First Shift, Second Shift/Part Time are now amalgamated as total
intake and shall have to fulfil all facilities such as Infrastructure, Faculty and other requirements as per the norms specified in the
Approval Process Handbook 2024-25 to 2027 for the Total Approved Intake.
4. In case of any differences in content in this Computer generated Extension of Approval Letter, the content/information as approved
by the Executive Council / General Council as available on the record of AICTE shall be final and binding.
5. All AICTE institutions are highly encouraged to get NBA/NAAC accreditation. All eligible AICTE institutions are thoroughly
encouraged to participate in NIRF ranking process.
6. Deemed to be University: Institutions Deemed to be Universities (Running Technical Education Programmes), it is mandatory to
have AICTE approval from the Academic Year 2018-19 in compliance of the Hon'ble Supreme Court Order dated 03-11-2017
passed in CA No.17869- 17870 /2017.
7. AICTE Approved Institutes are encouraged to utilize SWAYAM PLUS Courses up-to 40%
9. AICTE Approved Institutes are encouraged to make efficient use of the flagship schemes like:
d. ATAL FDPs: Faculty training for Emerging areas and cutting edge Technologies.
Prof.Rajive Kumar
Member Secretary, AICTE
Copy to:
4. Guard File(AICTE)
** Individual Approval letter copy will not be communicated through Post/Email. However, a consolidated list of Approved Institutions(bulk) may be downloaded
from the respective login id's.
This is a computer generated Statement. No signature Required
Heard.
…..
Handbook.
of.
Sir/Madam,
1. All documents from year 2010 till date (including certified copy of affidavits, application form, details of faculty, EOA payment details
enclosures) uploaded for obtaining EOA from AICTE
2. Details of payment (certified copies) TER charges payment from year 2010 till date.
Submitted by your institute i.e. Shri Dadasaheb Gawai Charitable Trust, Vikramshila polytechnic Whether you would like to share the
documents to 3rd party as per sec11(1) of RTI Act or not. You are requested to give your consent, and if yes please provide copy for
the same.
--
Regards,
WR (RB), AICTE HQ- New Delhi
Western HQ <[email protected]>
I am not interested.
[Quoted text hidden]
P a ge |1
To,
Narender Singh
Dy. Director (PGRC)
All India Council for Technical Education
Nelson Mandela Marg, Vasant Kunj,
New Delhi-110070
Respected Sir,
In response to the letter referenced above, received on 13th August 2024, we
hereby submit the following facts:
1
P a ge |2
The All India Council for Technical Education (AICTE) permits the sharing of
infrastructure among several institutes operating on the same premises, subject to
specific guidelines and conditions. According to AICTE’s approval process,
institutions under the same trust, society, or company operating in the same
location or city can merge into a single institution, allowing them to share
facilities such as classrooms, laboratories, libraries, and other infrastructure.
We wish to bring to your attention that the aforementioned institutes are operating
as separate entities despite being under the same trust. They have not merged into
a single institution to date. Consequently, the combined shared infrastructure does
not meet the requirements for all the programs and levels offered.
The AICTE conducts surprise visits to ensure that institutions comply with its
standards and regulations. These visits are part of the Expert Visit Committee
(EVC) process, which verifies the availability of facilities, faculty, and other
resources at AICTE-approved institutions. We request AICTE to conduct
physical visits due to several complaints from the employees of both the
engineering and polytechnic colleges, recent directions from the Nagpur High
Court to Vikramshila Polytechnic, Darapur for affiliation, and other extraordinary
circumstances, including several cases filed by employees regarding salary
arrears/non-payment of salary as per AICTE norms. The surprise visit will
address all allegations and claims made by both parties.
We also wish to inform you that the management is aware of the available
infrastructure and the false claims made in the affidavit submitted to AICTE for
obtaining EOA. Consequently, they have not paid EOA charges for Vikramshila
Polytechnic, Darapur even after the deadline, intending to merge the polytechnic
infrastructure with the engineering college. However, the Bombay High Court,
Nagpur Bench, passed an order on 22nd July 2024 for mandatory EOA payment
as a special provision. The receipt of payment attached as proof of the above
claim along with the court order. Moreover, there is a violation of EPF dues
payment, and a public notice in a daily newspaper attached as proof to support
our complaint.
Thanking you
2
P a ge |3
Enclosure:
Relevant documents to support our complaint and claims
3
4
5
6
7
8
9
10
11
16
17