IBM CE Projects One Note
IBM CE Projects One Note
Program Positioning (Things to Remember) 1. Since the IBM projects are Java Based, therefore the first and foremost thing that needs to be checked is the students comfort with Java as a programming language, Core Java and JSP/Servlets concepts followed by RDBMS concepts. He needs to know at least one database 2. For this the student either should show you some certificates proving that he has the knowledge or a technical round with the faculty would help you decide the same. 3. If the student fulfills the any of the above criterion, position IBM CE projects, if not, the Platinum projects program should be positioned. Please Note 1. Both programs would first start with a bridge module in which the student would be trained on important IBM tools which would enable him to work on the project. 2. The bridge module includes SDLC/DB2 (IBM Database), Rational Software Architect (IBM tool that helps in designing a software) and Rational Application Developer Web sphere (IBM tool that helps in developing RAD applications) 3. The students would do their projects in groups of 3 in complete MR
IBM CE Projects Ver 1.0 4. In order for the student to receive the Project Completion Certificate from NIIT, he needs to score >= 60%. Failure to do so he will get a transcript which would contain section wise details of project evaluation 5. Upon enrolment for the program the student can get a letter from NIIT with NIIT and IBM logo on it mentioning the name of the project he has enrolled for, which he can submit to his college HOD 6. In the Platinum program the student would get a graded certificate from NIIT on Java and Oracle 7. The Java content in this module is not the same as CJEV4 or DJVTV3, however does cover all the necessary elements required for the student to work on the project further on 8. The students would have to submit their projects by February since the evaluation is scheduled in March. Therefore November is the right time for the student to enroll for the project to get over on time 9. In case of the platinum projects program, NIIT would conduct fast track batches to ensure the program along with the project gets over by February. (centers to ensure the fast track batches are launched in case of platinum program) Certificate of Completion from IBM