Cable Diary
Cable Diary
Development
إدارة ربط مشاريع الطاقة المتجددة
R. E. Interconnection Projects
Department
الغربية- ربط مشاريع الطاقة المتجددة
R. E. Interconnection Projects - والجنوبية
WOA&SOA
Cable Diary
CONTRACT NO: CONTRACTOR:
PROJECT NAME: SECTION:
CABLE TYPE: CABLE MANUFACTURER:
Sub Station Breaker No. Joint Bay No. Drum Detail Cutting Length in
(M)
Name of Section No. Section Phase Actual Cable
Date Laid
Circuit Length Length in (M)
From To From To From To Number Length in (M) From To
270 Red
270 Yellow
270 Blue
C1 270 Red
270 Yellow
270 Blue
270 Red
270 Yellow
270 Blue
C2
270 Red
270 Yellow
270 Blue
270 Red
270 Yellow
270 Blue
C3
270 Red
270 Yellow
270 Blue
270 Red
270 Yellow
270 Blue
C3
270 Red
270 Yellow
270 Blue
'
شركة الكهرباء السعودية لتطوير المشاريع
Saudi Electricity Project Development
R. E. Interconnection Projects Department إدارة ربط مشاريع الطاقة المتجددة
R. E. Interconnection Projects - WOA&SOA الغربية- ربط مشاريع الطاقة المتجددة
والجنوبية
PROSECT TITLE: 380KVA UGC CONNECTION RELATING TO INTEGRATION OF SHUAIBA PV POWER PLANT
CONTRACT NO. 44000016438 J. O. NO.
CONTRACTOR CEPCO CIRCUIT
I hereby confirm that the mentioned Work was checked by the Contractor and found to comply with SEC Requirements
APPROVED ROUTE & TRENCH S CROSS SECTION AT EACH ROAD TO BE ATTACHED, EXECUTED WORK SHALL BE INDICATED IN
DIFFERENT COLOUR,HDD & DUCTBANK LOCATIONS SHALL BE INDICATED in the DRAWING SKETCH SHOWING THE HDD LENGTH TO
BE INCLUDED
COMMENTS :_________________________________________________________________________________________________________________________________________
_______________________________________________________________________________________________________________________________________________________
SEC INSPECTOR NAME:________________________________________________
DATE:___________________ TIME:________________ SIGNATURE:_______________________
TEL :___________________ FAX :_______________ E-MAIL:___________________________
Contractor Should at all Time Make Sure That All Necessary Work Permits are Obtained Before Execution of Work and to Make Sure That all Neccessary Coordination
with Other Related Stakeholders are Made Before Hand.
Contractor shall submit the Inspection Request at least 24-hours prior to the inspection time.