0% found this document useful (0 votes)
8 views

Comments On Milestones

comments on hydropower schedule

Uploaded by

Ujjal Regmi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Comments On Milestones

comments on hydropower schedule

Uploaded by

Ujjal Regmi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

As Per Contract Agreement Contractors Schedule Comments

Start ( Must be Date of


Sections Description Duration/Days Finish Duration/Days Finish Date Remarks Revised Duration
Commencement)
Completion of all civil works at the intake and under sluice including 1st
MS.CW.HW.1 419 10-May-24 05-Dec-26 939 25-May-26 Link with finish date of CW-HW-240 745
stage river diversion works ready for necessary gates installation.
Completion of all civil works at the settling basin ready for necessary gate
MS.CW.HW.2 696 10-May-24 14-Oct-25 522
installation.
Completion of construction of the adit including excavation, rock support
MS.CW.A.1 131 10-May-24 12-Nov-24 186 linked correctly but out of milestone duration/days
works and lining whatever is required as per drawings and specifications.
Completion of construction of the headrace tunnel from Inlet towards
adit tunnel junction including invert and tunnel lining whatever is
MS.CW.HRT.1 877 10-May-24 05-Oct-26 878
required and ready for installation of the bell mouth pipe as per drawings
and specifications.
Completion of construction of the headrace tunnel from the adit tunnel
junction towards the inlet including invert and tunnel lining whatever is
MS.CW.HRT.2 856 10-May-24 11-Dec-26 945 30-Sep-26 Link with finish date of CW-TW-190 873
required and ready for installation of adit bulkhead gate as per drawings
and specifications.
including tunnel invert and tunnel lining, completion of surge shaft and
rock trap and work associated with their construction and ready for
MS.CW.HRT.3 807 10-May-24 22-Jul-26 803
installation of embedded penstock pipe by the Hydromechanical
contractor.
Completion of all civil works including foundation and 1st stage machine
MS.CW.PH.1 foundation and frame structures and ready for crane installation in the 628 10-May-24 01-Feb-26 632 07-Jan-26 Link with finish date of CW-PW-240 607
powerhouse.
Completion of all civil works at the tailrace and its outlet and ready for
MS.CW.PH.2 583 10-May-24 10-Dec-26 944 15-May-26 Link with Finish date of CW-TR-110 735
installation of gates.
Overall completion of all Civil Works as per Contract and ready for wet
MS.CW.1 946 10-May-24 12-Dec-26 946
test (water filling).
Completion of all Civil Works as per Contract and ready for
MS.CW.2 commissioning. 960 10-May-24 26-Dec-26 960