As Per Contract Agreement Contractors Schedule Comments
Start ( Must be Date of
Sections Description Duration/Days Finish Duration/Days Finish Date Remarks Revised Duration Commencement) Completion of all civil works at the intake and under sluice including 1st MS.CW.HW.1 419 10-May-24 05-Dec-26 939 25-May-26 Link with finish date of CW-HW-240 745 stage river diversion works ready for necessary gates installation. Completion of all civil works at the settling basin ready for necessary gate MS.CW.HW.2 696 10-May-24 14-Oct-25 522 installation. Completion of construction of the adit including excavation, rock support MS.CW.A.1 131 10-May-24 12-Nov-24 186 linked correctly but out of milestone duration/days works and lining whatever is required as per drawings and specifications. Completion of construction of the headrace tunnel from Inlet towards adit tunnel junction including invert and tunnel lining whatever is MS.CW.HRT.1 877 10-May-24 05-Oct-26 878 required and ready for installation of the bell mouth pipe as per drawings and specifications. Completion of construction of the headrace tunnel from the adit tunnel junction towards the inlet including invert and tunnel lining whatever is MS.CW.HRT.2 856 10-May-24 11-Dec-26 945 30-Sep-26 Link with finish date of CW-TW-190 873 required and ready for installation of adit bulkhead gate as per drawings and specifications. including tunnel invert and tunnel lining, completion of surge shaft and rock trap and work associated with their construction and ready for MS.CW.HRT.3 807 10-May-24 22-Jul-26 803 installation of embedded penstock pipe by the Hydromechanical contractor. Completion of all civil works including foundation and 1st stage machine MS.CW.PH.1 foundation and frame structures and ready for crane installation in the 628 10-May-24 01-Feb-26 632 07-Jan-26 Link with finish date of CW-PW-240 607 powerhouse. Completion of all civil works at the tailrace and its outlet and ready for MS.CW.PH.2 583 10-May-24 10-Dec-26 944 15-May-26 Link with Finish date of CW-TR-110 735 installation of gates. Overall completion of all Civil Works as per Contract and ready for wet MS.CW.1 946 10-May-24 12-Dec-26 946 test (water filling). Completion of all Civil Works as per Contract and ready for MS.CW.2 commissioning. 960 10-May-24 26-Dec-26 960