100% found this document useful (1 vote)
68 views2 pages

4.protection Arrangement For RCC Box Culverts & RUB-LHS (No.2015CE-IIIBRRDSOMisc Dated 01.12.2015)

Protection arrangement for RCC Box culverts & RUB-LHS ( No.2015CE-IIIBRRDSOMisc dated 01.12.2015)

Uploaded by

patelzupatel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
68 views2 pages

4.protection Arrangement For RCC Box Culverts & RUB-LHS (No.2015CE-IIIBRRDSOMisc Dated 01.12.2015)

Protection arrangement for RCC Box culverts & RUB-LHS ( No.2015CE-IIIBRRDSOMisc dated 01.12.2015)

Uploaded by

patelzupatel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Headquarter Office,

Churchgate, Mumbai-20

Western Railway

No. W 420/0 (Policy)(W3) Date : 18.00.2016

CE(C)North, CE(C)South, CE(C)Survey, CE(C)EC.CE(C)HQ. CE(C) C&S-CCG


CPM/ADI

Dy.CE(C) l-CCG Dy.CE(C)ll-CCG


Dy.CE(C)DFC-CCG Dy.CE(C)ST
Dy.CE(C)NDB Dy.CE(C)JL
Dy.CE(C)l-ADI Dy.CE(C)ll-ADI
Dy.CE(C)lll-ADI Dy.CE(C)P&D-ADI
Dy.CE(C)l-RTM Dy.CE(C)H-RTM
Dy.CE(C)IND Dy.CE(C) I - BRC
Dy.CE(C)ll-BRC

Sr.DEN(Co.) - BCT BRC RTM ADI RJT BVP

Dy.CE(Br)ADI

Sub Protection arrangements for RCC Box culverts&RUB/LHS.

Ref: Railway Board's letter No. 2015/CE-IH/BR/RDSO/Misc. of £u


dt. 01.12.2015 (copy enclosed) n f

Please find enclosed a copy of above referred policy letter of Railway Board in
regard to protection arrangements for RCC Box culverts&RUB/LHp\which is being
sent for your information and further necessary action.

(K.C. Swami)
Chief Bridge Engineer

E n d : As above

CI- CAO ( C ) : For kind information.


CI- PCE : For kind information.

CI- CPMs/DFCCIL- Mumbai Surat Vadodara Ahmedabad

CI- CE(RSW), Dy .CE(ROB)&Dy. CE(D)CCG


Signature Not
Verified
Digitally signed by
RAMESH KUMAR
SINGH
Date: 2023.12.21
13:00:07 IST
Reason: IREPS-CRIS
Location: New Delhi
Government of Iftdia
0
Ministry of Railways
(Railway B o a r d )

No. 2015/CE-Hf/BR/RDSO/Misc New Delhi, dt. 01.12.2015

rincipal Chief Engineers, Aif Zonal Railways


i Chief
C l
Administrative Officer (C), AH Zonal Railways

Sub: Protection Arrangements for RCC Box culverts & RUB/LHS

In the standard drawings issued by RDSO, there is provision_pf protection


arrangements such as curtain wall, drop wall, wing wall, return wall etc- for
construction of RCC Box bridges. However, it is understood that at some places, the
prescribed protection works are not being provided while building new RCC Box
b r i d g e s which may endanger the safety of the bridge. It is therefore requested to
look into the matter and ensure that all the protection arrangements prescribed in
the drawings are provided while execution of the work. *

CQ~>\?^ Further, R D S O has issued drawings for protection arrangements (Cut


& Drop wail etc) for R U B / L H S also. The same should be followed meticulously while
construction of RUB/LHS.

(S.K.Srivastava)
Executive Director C E / B&S
i s 0> Railway Board