HSE Engineer

Najam Iqbal,

Uploaded by

Usman Muhammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Engr.

Najam Iqbal
Mobile: + 92 (0) 310-044-0623
Email: [email protected]

Personal Information
Nationality: Pakistani
Address: UET, Lahore.
Religion: Islam

Professional Statement
Visionary leader, bridge builder and professionally developed with a Bachelors’ degree in Engineering.

Education
UNIVERSITY OF ENGINEERING AND TECHNOLOGY, LAHORE Lahore, Punjab
Bachelors in Mechanical Engineering 2014-2018
Govt. Comprehensive Higher Secondary School, LAHORE Lahore, Punjab
FSC Pre-Engineering 2012-2014
Govt. Higher School, Kufri Khushab, Punjab
Matriculation (Science) 2010-2012

Certifications and Trainings

• IOSH-MS (UK)
• COSH Risk Assessor (OSHA-USA)
• First Aid and CPR Training (JOSH-UET LHR)
• Risk Assessment (IICC)
• PTW authorization (IICC)
• Hazard identification (IICC)
• Job Safety Analysis (IICC)
• First Aid Training (IICC)
• Food and Health Training (Stanford university)

WORK EXPERIENCE

NETRACON TECHNOLOGIES PVT. LTD.


• (550 & 220 KV grid station, Sahiwal, under SIEMENS)
• (550,220 &132 KV grid station, Faisalabad, under GENERAL ELECTRIC)
PROJECT HEAD HSE
(JAN 2018-OCT 2020)
Responsibilities
• Effective Implementation of HSE Policy.
• Carried out HSE Trainings for the new employees.
• Strict monitoring & supervision of Work at height, identified Hazards and successfully taken
• necessary control measures.
• Inspection of tools, equipment’s, ladder, Mobile scaffolds, vehicles on monthly basis and
maintain all inspection record and use proper tag on all equipment
• Arrangement of all facilities & equipment
• Effective implementation of PTW System and carried out Risk Assessment
• Administered & conducted all Emergency Response activities
• Conducting Tool Box Talk & Safety Awareness meetings on daily basis
• Provision of necessary PPE’s to all employees
• Strictly maintained high standard of House Keeping & Waste management as per client’s
• requirements & procedures
• Prepared the Incident and recommended the corrective actions & preventive actions for
• improvements

HUAWIE RESEARCH CENTRE, UET LHR, PAKISTAN


INTERNEE ENGINEER
(JUL 2018-SEP-2018)
RESPONSIBILITIES:
• Worked as assistant in robotic research lab on designing of exoskeleton system through solid
work
• Worked on material and standardize tools for Exoskeleton system
• Worked as purchaser material form market for Exoskeleton system

SKILLS AND SOFTWARES

• Microsoft Power Point


• MATLAB
• AUTOCAD
• SOLID EDGE
• Curious About Learning
• Interpersonal Communication
• Critical Thinking & Creativity
• Presentation & Communication
FINAL YEAR PROJECT

SIX SIGMA IMPLIMENTATION ON HAFIZ SHEIKH NOOR U DIN AND SONS INDUSTRIES PVT.LTD