0% found this document useful (0 votes)
124 views1 page

Ramp Check List

check list for ramp drawings

Uploaded by

kvamshi_1971
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views1 page

Ramp Check List

check list for ramp drawings

Uploaded by

kvamshi_1971
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECK LIST

(RAMP DETAILS)

PROJECT:- DATE:-
DRG.NO:-
SHEET NO:-
CHECKED BY
Draft person Designer

1 Grid line, number,& dimension.(As per Arch. Drg & structural centerline,
column& footing layout)
2 All Ramp columns are taken from Drg.(centerline, column & footing layout)
issued to site for GFC recently.
3 Ramp Columns termination if any(As per Arch.Drg)
4 Ramp Beam Framing (As per Architectural & Structural point of view)
5 Slab thickness for all panels(As per Designer)
6 Slab reinforcement(As per Designer)
7 Numbering for all beams
8 Sizes for all beams(As per Designer)
9 For every beam distance is mentioned from the column face or grid line
10 Levels(As per Arch.Drg)
11 Section marking
12 Earth filling
13 CRS Wall ifany(As per Arch. Drg/Designer)
14 Ramp profile checked for height clearance @ roof beams(As per Arch. Drg/Designer)
15 Sections (ramp beam reinforcement detail along ramp profile)
16 Inverted beam marking (As per Designer/Arch.Drg)
17 Ramp beams longitudinal sections & C/S details (As per Designer)
18 General notes units (feet/inches) or (mm/meters)
19 Specific notes (As per Designer)
a.Grade of concrete for slab
b.Grade of concrete for beam
c.Grade of steel
d.clear cover for slab
e.clear cover for beam
20 Legend
21 Key plan
22 North point orientation
23 Architects name
24 Client name
25 Project title
26 Drg.title
27 Scale
28 Sheet.no.
29 Job.no.
30 Rev.no. (ex: R0,R1,R2 etc…)
31 Rev. description, date
32 Purpose(GFC/ Information/comments)
33 Consultancy name
34 Drawn by.
35 Design by
36 Checked by
37 Approved by
38 Date (date should not change for Revisions or Modifications)

sign:- sign:-
Date: Date:
Comments:-

Approved by:-
sign:-
Date:

You might also like