User-Manual-SWP-Combined-Application Form
User-Manual-SWP-Combined-Application Form
GOVERNMENT OF TAMILNADU
Table of Contents
2
Table of figures:
Figure 1 : Dashboard..................................................................................... 4
Figure 2 : Combined Application form ........................................................... 5
Figure 3 : Project & Basic Details .................................................................. 6
Figure 4 : Applicant Details ........................................................................... 7
Figure 5 : Survey Details ............................................................................... 8
Figure 6 : Address of the Enterprise.............................................................. 9
Figure 7 : Details of Enterprise and Contact Details ................................... 10
Figure 8 : Details of Project Promoter ......................................................... 11
Figure 9 : Details of Multiple Project Promoter ............................................ 12
Figure 10 : Investment and Finance Details ................................................ 13
Figure 11 : Means of Finance...................................................................... 14
Figure 12 : Employment Details .................................................................. 15
Figure 13 : Manufacturing Details ............................................................... 16
Figure 14 : Energy and Water Requirement ............................................... 17
Figure 15 : Document Checklist .................................................................. 18
Figure 16 : Saved Successfully ................................................................... 19
Figure 17 : Project - Project List .................................................................. 20
Figure 18 : Project List ................................................................................ 21
Figure 19 : Make Payment .......................................................................... 22
3
Step-1: Dashboard
• Once you login, Dashboard will be viewed by investor (as shown in Figure 4) where user can view the
status of the application.
Figure 1 : Dashboard
4
Step-2: Project – Combined Application Form
• Click on “Project” and select “combined application form” to get the Common Application Form
where you can enter the project details
5
Step-3: Project Details
• Please fill the Project Name and Basic Details of the Enterprise.
• If the Manufacturing Enterprise is new, then please select “Yes” else “No”. Based on the “Is it a New
Manufacturing Enterprise, please fill the further details.
6
Step-4: Applicant Details
• Enter the Applicant name, designation, Mobile number, Address and E mail ID.
7
Step-5: Survey Details
• Enter the “Survey field number” and “subdivision number” and click “Add” button.
8
Step-6: Address of the Enterprise
• Address of the Enterprise – Door No/Plot Number, Street/Road, Pin code, Area/Locality, District, Taluk
Name, Village/Town/city, State, Country, Local Body Type and Municipality.
9
Step-7: Enterprise and Contact Details
• Please fill the “Enterprise name, IEM number, IEM issue date and expiry date, PAN number of
enterprise and CIN number”.
10
Step-8: Project Promoters
11
Step-9: Multiple Project Promoters
12
Step-10: Investment and Finance Details
• Investment and Finance Details – Please fill the Details of Investment in Rupees.
• If needed, please select the check box, and fill the necessary details.
13
Step-11: Means of Finance
• Fill the Equity from promoters(domestic), Equity from promoters(foreign), Loan from financial
institutions & Others (Please Specify).
• Investment & Means of Finance Total will be calculated based on the inputs given by the investor.
14
Step-12: Details of Employment
• Enter the No of Employees on the Company Roll, No of Contract employee, No of Male employee,
Female Employee and Maximum Number of workers proposed to be employed in the factory on any
one day.
• Total Number of Employees will be calculated based on the input given by the investor.
15
Step-13: Details of Manufacturing
• Enter the Brief description of process technology used along with a flow chart (to be enclosed), NIC
Code, Installed Capacity.
16
Step-14: Consumption and Power requirement
• Enter the “Captive Generation (kVA), Annual Demand (kVA), Monthly Peak Load (kW), Voltage rating at
which HT supply is required and Fuel Type”.
• Enter the Details of Water Requirement – “Industrial Use (Kilo Liters per Day)” and “Domestic (Kilo
Liters per Day)”.
17
Step-15: Document Checklist
➢ Please upload all the supporting documents by placing the tick mark in the check box.
18
Step-16: Request Saved Successfully
• After Clicking save button “Your Request has been saved successfully” alert occurs.
19
Step-17: Project – Project List
• Once your request saved successfully, please get your project from the project list.
20
Step-18: Project List
• Once your request saved successfully, please get your project from the project list.
• Project List accommodate S. No, Project Id, Name of Project, Submission Date, Updated Date,
Project Status, Processing Fees and Action Items.
• There is no single window fee applicable for MSME (Status will be under process (Step 19 is
not applicable).
• Single widow fee is applicable only for Large Industries (Status will be Make payment (Go to
Step 19)).