0% found this document useful (0 votes)
210 views

Estimation Engineer CV

Mechanical Engineer CV

Uploaded by

Mohammad Sadik
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
210 views

Estimation Engineer CV

Mechanical Engineer CV

Uploaded by

Mohammad Sadik
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

CURRICULUM VITAE

Mohammad. Jafar sadik


Mobile: +966 565756282, +91 9030291192.
Skype id: mihammadjafarsadik
E-Mail: [email protected].

OBJECTIVE: -

A highly talented, professional and dedicated Estimation Engineer with experience in


Prequalification, Cost Engineering, Contract Engineering in a huge project, seeking to work in
challenging and healthy work environment to use my skills in the best possible way for achieving
the company’s goals.

EDUCATION: -

• Bachelor of technology in Mechanical Engineering, Jawaharlal Nehru Technological


University, Kakinada.
• PG Diploma in Fire and Safety, Jawaharlal Nehru National Youth center.

KEY SKILLS:-

 Estimation and bidding, as well as project prequalification methodology.


• Managing Planning and Estimation team with excellent communication and leadership skills
by setting clear team goals, delegating tasks and set deadlines.
• Gained years of experience as Estimation & biding Engineer in a Huge projects such Riyadh
Metro 3B2 SAR 130,000,000, Al hugayet tower Hvac parcel SAR 25,468,330, and Kfupm
Business park HVAC parcel 1 and mosque SAR 28,310,654.78 and King Salman Airbase
Medical Evacuation SAR 66,376,509.51.
• Experience in creating a pipeline database for the company that contributes in pricing
process and planning for future projects.

 Claims & Contract Administration:


• Perform Delay Analysis and prepare appropriate reports to contract department, for
the purpose of extension of time and disruption claims.
• Experience in Contract formation, preparation, negotiation, review, and drafting.
• Experience in Identifying key risk areas in a contract by review contract documents
and investigate the impact of the special conditions on the claim.
• Review project correspondences (Minutes of Meeting) and identify delay and
disruption events.

 Project Planning Software & Computer Skills:


• Moderate performance in Primavera P6 Professional.
• Highly proficient at Microsoft Office (Excel, Word & PowerPoint).
• Experience with Engineering software, (Auto CAD).
 EXPERIENCES: -
Estimation Engineer
At Al Hajry overseas, company (SPEW), Dammam, Saudi Arabia.
Working period: September 2018 – Present
Company Industry: Engineering, procurement and construction (EPC) is an
Engineering firm Specialized in construction management.

 Responsibilities:
• Study and analyze BOQ, project drawings, Equipment schedules and specifications.
• Preparing the Baseline Program for the projects by studying contract documents and
scope of work, create the logical and strategic sequence of work.
• Preparing related narrative reports for the submitted Baseline Program.
• Estimate the project with proper techniques to evaluate the prices for the BOQ items
with the Market well-known vendors.
• Evaluate the man per hour cost and site management and profit cost analysis.
• Preparing the commercial offers for the projects with in the biding deadlines.
• Establish simple document management system for project data (letters, logs,
submittals, inspection requests etc.).
• Preparing progress presentations for the client.
• Establishing the document coding structure for all documents.

 Project Engineer
At Abdulla A.M. Al Khodari sons Company, Al khobar, KSA.
Working period: 2014 – 2018
Company Industry: Engineering, procurement and construction (EPC) is an
Engineering firm Specialized in construction management.

 Engineering Achievement: -

• DETAIL OF WATER MIST PROJECT: The water mist project is considered as a solution
for cooling the underground tunnel track evacuation stretches, the purpose is to ensure
comfort & avoid heat exposure. Water mist cooling system should maintain the tunnel
airflow to the set point temperature of 30 to 32 degree centigrade.

• PROJECT HANDLED
RIYADH METRO WATER MIST PROJECT, KINGDOM OF SAUDI ARABIA.
Line 4, Stations 4G1 & 4C2 Water Mist System.
Line 5, Stations 5A1, 5A2, 5A3, 5A5, 5A6, 5B1, 5B2, 5B3,5B4, 5C1, 5C2, 5C4 Water
Mist System.
Line 6, 6D1, 6H2 Stations Water Mist System.
All Station are deep underground Cut & cover & round shape tunnels. Working
pressure of water mist system is 83 bar, using filtration equipment, fire rated valves,
temperature, pressure sensors, low10 bars & high-pressure pumps up to 83 bars,
stainless steel tubes & fittings with swaging type of joint capability of 2200 PSI.
 Responsibilities:

• Responsible of preparation of material approval request


• Responsible for preparation of quantity survey, MTO material take off.
• Responsible of installation and commissioning of all mechanical activities on site,
Underground tunnel, underground stations HVAC, Firefighting, and Plumbing, water
mist system, mechanical structures etc.
• Duct system design, supervision, duct fabrication and installation of the ductwork
following SMACNA & firefighting piping, Plumbing drainage, water supply piping
work preparing coordination drawing of MEP, Civil, and Architecture etc.
• Coordinating with other service on site like Electrical, Architecture, Civil etc. to
prevent rework and material losses Coordinating with contractors, supplier, and our
internal team purchase sales, site team client etc. Future review of material, tools
required and approval drawings required on site Responsible.
• Preparing material request and follow up with purchase department Taking approval
for erection work.
• Preparation of as built drawing Responsible Preparing material inspection report,
installation report, and Hydraulic & smoke test in reports. taking approval of all
above said from client Responsible Preparing material measurement quantity actual
installed on site Responsible preparing daily weakly report and submitting to client,
scheduling daily target and following bar chart for material delivery dates and work
schedule achieving.
• Coordination with clients, contractors, Sub contractor’s other agency for creating
work fronts, clearing constraints, Ability to plan, attending priority works. preparing
cost working for new item.
• Site supervision of all Air-conditioning, Firefighting, Plumbing and water mist system
other mechanical works.
• Mobilization of resources such as subcontractor, material, tools & equipment’s etc.
• Frequent review of site activities for monitoring progress and analyzing future
requirement. Installation knowledge of Ducting, Chilled water piping, Firefighting
piping, Zone control area, pump station, Fire hydrant cylinder, chillers, cooling
towers, FCU, AHU, water mist system Testing &commissioning etc.
• Monitor commissioning progress and resolve any problem that may arise.
• Preparation of Bar chart, work schedule.
• Daily meeting or site walk with client, consultant.
• Ensure smooth commissioning of the erected mechanical projects.
• Ensure that all mechanical site activities are conducted under controlled conditions as
per approved shop drawings, method statements, and specification and work plan.
• Ensure safe work environments control the use of material, avoid damages and
waste, request material, tools and equipment needed for the projects, and issue the
supervisor daily instructions as per the work plan.
• Preparation of material inspection report, installation test report, hydraulic test report
& maintaining records and submitting of technical data to client, archives to company
standards.
• Responsible for Preparation of Bill of Quantity of Materials for Projects.
• Analyse contractor bills
• Execute the whole project in time and in a cost-effective manner.
 SITE ENGINEER
At Agni d Associates company, Hyderabad, India.
Working period: 2012 – 2014
Company Industry: Engineering, procurement and construction (EPC) is an
Engineering firm Specialized in construction management.

 Responsibilities:

• Material Take off, for duct and chilled water pipes and fittings.
• Site execution regarding to planning schedule and following up for every execution
requirement for HVAC, Piping, Fire Fighting and Plumbing works.
• Coordinates with the suppliers, site people to ensure the right specification,
quantities time of delivery, etc.
• Follow up the systems installation details with the supervisors and Team leaders to
ensure that everything is going as per international and national codes and based on
the consultant requirements.
• Review project correspondences (RFI's, Meeting Minutes, progress photos etc.) and
identify delay and disruption events.
• Ensure safe work environments control the use of material, avoid damages and
waste, request material, tools and equipment needed for the projects, and issue the
supervisor daily instructions as per the work plan.
• Lead supervisors and labors to achieve their site execution tasks.
• Releasing as built drawings using AutoCAD MEP.
• Static pressure calculations, Duct size check, fans, grills and VAV selection.
• Applying required tests to systems after installation.

 TRAINING AND CERTIFICATIONS:

• Complete Training- 40 Hours primavera p6.


• Auto Cad.

 CODES & STANDARDS: Familiar with ASHRAE, SMACNA, NFPA Standards.

 Personal Profile:

Full Name: Mohammad jafar sadik.


Father’s Name: Mohammad Mahabub ali.
Date of Birth Age: 14-08-1991, 29 years
Sex: Male
Marital Status: Married
Passport No: R2774431
KSA Driving expire on: 30/09/2024
KSA Iqama No: 2459092579
Language Known: English, telugu, Hindi, and Arabic.
Address: D.No.15-6-21, Ramayya Street, RK Rao Peta,
Kakinada- 533 001, Andhra Pradesh, India.
Hobbies: Reading, Internet, & cricket.
 DECLARATION:

I do hereby declare that all the information stated above is true Authentic to the best of
my knowledge and belief.

Date:
Mohammad jafar sadik

You might also like