0% found this document useful (0 votes)
19 views3 pages

O. S. 4984-2016 Coil 50 MM PN-8

Hdpe pipe 2016
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views3 pages

O. S. 4984-2016 Coil 50 MM PN-8

Hdpe pipe 2016
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

CIPET PDI Observation Mahabir Polytubes , Begusarai

Observation sheet for Pre Delivery Inspection for IS:4984-2016 with latest amendment
SIZE/CLASS/TYPE/LENGTH PE-100, PN-8, DN-50 MM, SDR-17 Quantity offered in mtrs/pcs
Date of Inspection started No of sample drawn
Date of Inspection completed
Outside diameter Ovality (mm)
Weight Strip Strip No Out of Coil 50 mm To 50.4 max. Wall Thickness (mm) (End – A) Wall Thickness (mm) (End – B)
Sample No

Total Wt / Mtr
Batch of the Pipe Width of squatnes Inside Visual Check mm 1.4 mm
Length depth Inside &
Number (Kg) min. Strip smax. Diameter Outside
(mtr) ( Kg)
3 mm Max. 4
3.0 mm To 3.4 mm
2 mm (mm) End – A End - B End - A End - B
0.2 mm
1 2 3 4 1 2 3 4

10

11

12

13

Inspected by: Inspected in Presence of:


CIPET PDI Observation Mahabir polytubes , Begusarai
Observation sheet for Pre Delivery Inspection IS:4984-2016 with latest amendment
SIZE/CLASS/TYPE/LENGTH Quantity offered in mtrs/pcs
Date of Inspection started No of sample drawn
Date of Inspection completed

Weight Outside diameter


Total Wt / Mtr Out of Coil Inside Visual Check Ovality (mm) Wall Thickness (mm) (End – A) Wall Thickness (mm) (End – B)
Sample

Batch of the Pipe Strip Strip No of (mm)


No

Number
Length
(Kg) Width depth
squatness Diameter Inside &
(mtr) ( Kg) strip (mm) Outside End - A End - B End - A End - B 1 2 3 4 1 2 3 4

14

15

16

17

18

19

20

21

22

23

24

25

26

Inspected by: Inspected in Presence of:

CIPET PDI Observation Mahabir Polytubes, Begusarai


Observation sheet for Pre Delivery Inspection for IS: 4984-2016 with latest amendment
Sample IPCR Test, Pipe Sample Reversion Test (%), (110ºC for …….minutes) Clause No: 8.2
No ( Hydrostatic No
L0 mm L1 (After Test) mm L0 - L1 (Change in length) mm Reversion (%) Average (%)
resistance test)
(Before
Clause No: 8.1.1
Test)
at 800C,48 hrs

Result:

Carbon black Content (%), Clause No: 8.3 Melt Flow Rate (gm/10minutes), Density (kg/m3), Clause No: 8.7 Elongation at
Clause No: 8.4, Temp190°C, Load: 5 kg. Density of the Liquid: (Butyl acetate) break
Clause No:8.9
Sample Wt of Wt of Wt of the Carbon Sample . Avg cutting MFI = Avg.wt OIT Sample Weight in air Weight in (a1-a2) Sample
No material the boat boat after black
CBD No Wt. of wt. (WP) X600/240 Clause:8.5 No (a1) (gm) liquid (a2) Density
( W3) gm before heating in content cutting Gm/10 (gm)
heating air ( W2 ) (%) at240 sec. minute.
in air gm (W1-
( W1 ) W2)X100
gm W3

Base Density

1. 2. 3.
Result:

Remarks: (1) The sample drawn were tested all acceptance test as per IS: 4984-2016 and the offered lot confirm to IS: 4984-2016.
(2) Type test report verified vide Test Report No: date:
Inspected by: Inspected in Presence of:

You might also like