Bicol University

College of Science
Bachelor of Science in Computer Science
Legazpi City

Integrated Databank System

RDMD - EFFORTS Team:

Herrera, Cy Jay
Dionisio, Kim
Cleofe, Erjay
Bron, Greg
Vergara, Joshua
Muncal, Aragorn
Project Objectives Progress

Objective Task Completed Person-in Task to be Completion(%) Remarks


Charge Completed

1. Mentee’s are ALL team None 100%


introduced to the members
task that is
assigned.
2. Attended
1. Requirements meetings with
Gathering and the faculty
Planning members and
sample datasets
in order to get
the desired
output for the
system..

1. Brainstormed Dionisio None 100%


regarding the
possible
relationships
among the tables
and entities.
2. Made an Entity
Relation
2. System Diagram for the
Design and Database.
Architecture 3. Using Figma, the
mentee’s made
designs for the
website of the
system.
4. Listed all the
possible features
and functions for
the system.

1. Downloaded the Vergara . 66.67%


3. Development -
sample data 1. Registering a
Phase 1
from the RDMD user and
(Databasing of google sheet and authorization
researches) imported it on system.
xampp. 2. Implementing
2. Reorganized and file
made changes management.
regarding the 3. Some things,
entity especially
relationships. some business
3. Clarified some rules, still
business rules needed to be
and limits as to specified and
how the data are cleared.
connected.
4. Created a
dummy data.
5. Login system is
implemented.
6. Fully integrate
the actual data to
the system.

4. Development - 1. Created a Herrera 1. File 44.44%


Phase 2 working submissions
(Monitoring of monitoring are yet to be
Researches) module to track implemented.
research 2. More tables
progress. and graphs are
2. The design and to be
logic for the file implemented.
submissions are 3. The monitoring
done. module needs
3. Dashboards a clearer
and displaying design and
the research implementation.
records are fully 4. Dashboards for
implemented. the other
4. Some data divisions are
analytics were yet to be
integrated. completed.
5. Graphs and
tables should
be
downloadable
in csv file.

1. Created a Herrera 1. Implement 42.86%


search and filter and design
feature that interface for
could filter displaying
5. Development -
various published
Phase 3 conditions. papers.
(Presentation 2. Dashboard can 2. Advanced
and Publication be filtered. filtering is to
of Researches) 3. Filtering works be
on the entire implemente
database. d.
3. Filtering by
researchers
are yet to
be fully
developed.
4. The
backend for
determining
the status of
the
research is
to be
implemente
d.

Overall Progress = 70.79%